Loading...
10City of South Miami PUBLIC WORKS & ENGINEERING DEPARTMENT 4795 SW 75 th Avenue Miami, FL 33155 Tel. (305) 663-6350 Fax (305) 668-7208 TO: Steven Alexander, City Manager FROM: Jorge L. Vera, Capital Improvement Project Manager DATE: October1,2013 South Miami bOd ffii'P 2001 Resolution: A Resolution amending the Recreational Design and Construction contract for the Murray Park Community Pool to include the contemplated offsite design and installation of the water and sewer facilities on SW 68 Street for an amount not to exceed $241,747, to be paid for by General Obligation Bond (GOB) funds, which will increase the total contract amount to $1,663,747. Background: Under Resolution 62-13-138880 the City approved and entered into a contract with Recreational Design Construction, Inc. (ROC) for the design and construction of a community pool at Murray Park. The total contract cost for the design and construction of the pool was in the amount of $1,422,000. The funding for this project was secured by several grants consisting of CDBG grant in the amount of $1,201,361 for construction of the pool, SNP grant in the amount of $220,050 for construction and design of the pool and CRA funds in the amount of $100,000 for the design of the pool for a grand total of $1,521,411. At the time the contract was approved the cost for the additional scope of work for offsite design and construction services on SW 68 th street was unknown. Under Exhibit B of the contract, the City included an alternate clause to address the additional offsite design and construction costs once they were determined. Due to the time restrain of the grants and in order to reduce cost and expedite the project, it was essential and in the City's best interest to use a single contractor for the entire project. A single contractor would provide uninterrupted coordination between the offsite design construction work and the pool design and construction scope of work. As required by the alternate clause in the contract, ROC submitted quotes for the offsite design and installation of water and sewer lines on SW 68 Street. The design costs include surveying, testing and building permit plans are $38,724, and the construction cost is $203,023. The total cost associated with the scope of work for the offsite design and construction of the water and sewer lines is for an amount not to exceed $241,747. The cost for offsite services are funded from the General Obligation Bond (GOB), a different source than the design and construction of the pool funds. Since it is in the City's best interest to use a single contractor for the entire project, the City is amending the original contract amount for the design and construction of the pool. The contract amount is being amended to reflect the alternate cost for the offsite design and construction of the water and sewer lines on SW 68 th street, which will increase the total contract amount to $1,663,747. /0 Expense: Additional offsite scope of work amount $241,747 Total contract amount not to exceed $1,663,747. Account: The expenditure for the offsite scope of work shall be charged to the General Obligation Bond account number 114-4010-541-3100 for design which has a balance of $71,337.80 and 114-4110-541-3450 for construction which has a balance of 748,828.60. Attachments: Proposed Resolution Contract change order Exhibit B of RDC contract GOB account balance 1 RESOLUTION NO.: _____ _ 2 3 A Resolution amending the Recreational Design and Construction contract for the Murray Park 4 Community Pool to include the contemplated offsite design and installation of the water and 5 sewer facilities on SW 68 Street for an amount not to exceed $241,747, to be paid for by General 6 Obligation Bond (GOB) funds, which will increase the total contract amount to $1,663,747. 7 8 WHEREAS, under Resolution 62-13-138880 the City entered into a contract with Recreational Design 9 Construction, Inc.(ROC) for the design and construction of a community pool at Murray Park in the amount of 10 $1,422,000; and 11 12 WHEREAS, the funding for this project was secured by several grants consisting of COBG grant in the 13 amount of $1,201,361 for construction of the pool, SNP grant in the amount of $220,050 for construction and 14 design of the pool and CRA funds in the amount of $100,000 for the design of the pool for a grand total of 15 $1,521,411; and 16 17 WHEREAS, the City anticipated there would be an additional scope of work for offsite design and 18 construction services that were not contemplated in the cost for the design and construction of the pool; and 19 20 WHEREAS, the contract at page 6 of the Scope of Work (Exhibit B of the Contract) provided for an 21 "Alternate" to connect the new project to the existing water and sanitary sewer systems and the Contractor was 22 required to enter into a separate contract or a change order to construct this "Alternate" work; and 23 24 WHEREAS, it was in the City's best interest to include an alternate clause in the contract to cover the 25 additional design and construction costs once they were determined; and 26 27 WHEREAS, in order to reduce cost and expedite the project, it would beneficial for the City to use one 28 contractor for the entire project, which would provide uninterrupted coordination between the offsite construction 29 work and the construction of the pool; and 30 31 WHEREAS, as per the requirement of alternate clause in the contract, ROC submitted a quote to included 32 the offsite design and installation of water and sewer lines on SW 68 Street; and 33 34 WHEREAS, the offsite design and installation of the water and sewer lines project is funded separately 35 from the funding for the pool project fund; and 36 37 WHEREAS, the offsite water and sewer improvements is funded through a General Obligation Bond for an 38 amount notto exceed $241,747; and 39 40 WHEREAS, the City Commission wishes to approve the amendment of the contract to include the offsite 41 design and construction of the water and sewer line for an amount not to exceed $241,747; and 42 43 WHEREAS, the City Commission authorizes the City Manager to amend ROC contract to include the offsite 44 design and construction of the water and sewer line for an amount not to exceed $241,747 which will increase 45 ROC's total contract to $1,663,747. 46 47 NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF 48 SOUTH MIAMI, FLORIDA THAT: 49 50 Section 1: The City Manager is authorized to amend the contract with ROC to include a change order for the 51 offsite design and construction of the water and sewer line for an amount not to exceed $241,747 which will 52 increase ROC's total contract to $1,663,747. A copy of the change order is attached. 53 54 Section 2: The expenditure shall be charged to the General Obligation Bond fund account 55 number 114-4010-541-3100 for design which has a balance of $71,337.80 and 114-4010-541-3450 for 56 construction which has a balance of $748,828.60. 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 Section 3: If any section clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining portions of this resolution. Section 4. This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED this ___ day of ______ , 2013. ATTEST: CITY CLERK READ AND APPROVED AS TO FORM LANGUAGE, LEGALITY AND EXECUTION THEREOF CITY ATTORNEY APPROVED: MAYOR COMMISSION VOTE: Mayor Stoddard Vice Mayor Liebman Commissioner Newman Commissioner Harris Commissioner Welsh I I I .. . .:JIc1~~.~~It7..INb. P(.une CohtractChonQ.e .... ". .. . .... . :-.' : . , ~': : ." : ~: .. :.::. . . . .f!~~!£~~~:::~::~ .. ;:;::" ::;" :: :;: ;::' .:. ".:;": •• r~t"II;~~~Ji~tWcl~h' the; Forti l1tirlj:{fHHIAF! ~;t~M : :::. . ... ·@f!f~ti~!~N~zt6JJ%~~ Chano.~:O(der NUmber; (lO'6 . . . . . : '. . . '. . .... .": tl1~ .Con'r(ldl~her~bVtevis~alN the 'f6t1dwln~ item~: pdQ . .p~$~rtpfi()t1 ..... ....••... . . . . •..• .•... '. . '. '.. •.. . •• ' . . .·· ••• iW~~~lW~~~0pd~6~~~~~~~V:6r~b~~~~:y1d~;im~.~d~~~1~~d6iJ~es ··;the.demolitioh ondreslorotioriSW:68SLAIi Wdfkis·perfhe. JoQ% ." • ". '~~:~g{tM:¢'~!t~~~;t~~tr~~8tJg2~~ifainirg heets9-1 . ..... ¢9ntt8y~d('$OV~m$qd&~r0f1f15:%o~,p~r Contrdct .' .~~ ..... . . ThisctlongeorderisposedonPlortsthqt.not.yetbeenapproV'ed byihe . opprcjprJqfe;authorities. Snpulq'(li1Y chbnge~o'c<::0rohce o· p~trnit i$sue~ RDC reS~K-~$ ifsryg!if$ to ~yqiD8f~the chpntje$., . mit chqhgeotdercJges t)6tin¢I~ge po1iceptesen9~ . . '. ." Tofql Chani1e'order:All'iount .: ': . ..:: ..": . .. . .. .... -. ~C~6gfom.~~1t~~CbrY<ij~~~:¢~htr¢~t'Gh~M~~·btd¢t$~:~::·,::::::::~::::::~:::::::::::~'.:::::::::~::::::::::::::::::~:::: . The CQntrocf VdJuebriorJ.o this Prime ControCt. Chanoe ()rderwas.;.;.,., ........ ;·.;.;; ...... i ... ; •.. ~.; ... , •• ;., TheCohtrodVoJuewHl.be chqm:~ed by'thisBrime~odtr6ctChonde,OrdefTnthe otno.UritoL. The neW COhfr'a'dt VOlueJnCrudihothlsPrlmeCbtitrd6tChonqebrd~rwlll'be •.•.. ; •. ,·; ............ , ........ ;. The CohtrClclduration wilFbe'c:hanged" .' ..... '.> • • .". .. ••. .". ". .••• . by~ ~ .. ~ "'4._ ~." .~ ... ~,;~ ...... :-:. ~ ... ' t ~ "',,-.. ~.: ~~~ ... ; ...... :; ; .. :: .... ~ .... : ~ ~ .'.4:~~" ~~~ ~ ~.'. ~ ..... ~ .• ",.o .. ~~. f' .• ~ . .; .. ,:.~ .•. :~~ ;,,:_ ••. 4!:" .;.~.~ ... ~ ~:~,~~.~",.~.,;~.~ •• ~ .... ,~. ;.:~.! ~ .•.•. *~ ~~~ h .... ~ The reyis~d~,(jostonfioICohipl(3tIClnddte os~of ihi~f'time Contract Chon~.eOrde(js ................... . CONTRACTOR Recreational Qesign & Constructioo;lnc. 3990NorthPoW0rlih~ RoodnFort Lauderdale. FL 33309 By Joseoh C. Cerrone. III ~I(:;NA T1IRF Date· OWNER GUy of South Midmi 6130 Sun~e1 Dr ' .. SolJthMiami PI 33143-509\1 Bv March 26, 2013 City of South Miami City Manager 4795 S.W. 75th Avenue South Miami, FL 33135 Attn: Steven J. Alexander Re: Murray Park Community Pool RFP No. SM-PW2010-10 Dear Mr. Alexander, Exhibit B -Scope of Work Recreational Design & Construction, Inc. (ROC) is pleased to submit this Revised Scope of Work includin~ pricing for the construction of the Murray Park Community Pool facility located at 5800 S.W. 661 Street in South Miami, Florida. Our scope of work and pricing is in accordance with the attached site plan and elevation renderings and the City of South Miami's design criteria to meet the grant funding as per December 21 s1 meeting. The time frame to design and construct the above noted project is 365 calendar days from contract Signing that includes an allowance of one month for permitting. The pricing for the complete scope of work and services is as follows: Design Fees and Services • ROC shall provide all necessary civil, landscape, irrigation, aquatic, architectural, structural, mechanical, plumbing and electrical plans necessary to permit and construct the proposed project within the boundaries of the property as outlined with red dashes on the site plan (hereinafter referred to as "Boundaries of the work"). Specifications will be noted on plans. ROC will not be required to prepare a specification book. However, ROC shall provide as-built drawings. • Design and permitting per applicable FBC201 0 and Miami Dade County Code in ~ffect. • ROC shall be responsible for obtaining the permits from the City of South Miami Building Department and other applicable permits as required for the work within the Boundaries of the Work. • Permitting fees will be paid for or reimbursed by the Owner. • Design, Permitting and construction outside the Boundaries of the work are not included. • ROC agrees to Design, Permitting and Construction pursuant to the Alternate Work shall describe below in this Exhibit B which is work that is outside the Boundaries of the work. However, the Alternate work shall be performed under a separate contract and shall be billed separate from Design-Build contract. The contract price for the Alternate work shall be negotiated separately. General Conditions • The general condition costs include all project management, supervision, mobilization, temporary site water, temporary electric utilities, temporary trailer/storage facilities, temporary toilets, temporary fencing/gates and dumpsters. • ROC shall provide construction stakeout as necessary to complete the proposed project. Bond and Insurances • Provide a Design/ Build payment and performance bond once the permits are in place. Murray Park Community Pool RFP No. SM-PW201 0-1 0 -Page 1 of 6 Survey & Construction Testing • Original survey provided by owner, construction testing fees are included, construction survey layouts and final as-built drawings by RDC. Site Preparation • A temporary silt fence will be installed around the area being developed to prevent soil erosion & airborne dust generation. • Clearing and prepping with-in the limits of work, to prepare the areas for construction, shall be performed as part of this scope of work. • Debris resulting from the clearing and grubbing shall be disposed of at an off-site location in accordance with applicable codes & statutes. Site Work • ADA compliant 5'-0" wide concrete sidewalks will be constructed to connect the eXisting community center walkway (north of the basketball courts) & the community center parking lot to the aquatic center entrance. • A bicycle rack will be provided. Site Electric • The electric power shall be connected to a new FPL service. Site Drainage • The areas with-in the limits of construction shall be graded/shaped as required to create dry/wet retention areas for storm water drainage quantity control and provide proper pad elevations for the proposed building & pool deck. Site Utilities • The building sanitary sewer systems & filter discharge piping will be connected to the existing on site sanitary sewer system. • The building potable water system, collector tank auto-fill line & pool deck hose bibs shall be connected to the existing water main along SW 58th Place • A backflow preventer (if required) will be installed on the potable water service to the pool facilities. Landscape/Irrigation • Landscaping will be based on providing minimum city and county code, low maintenance native plant species requiring minimal irrigation. • The design shall include the removal, relocation & replanting of the existing native vegetation within the limits of construction (as required). • Any existing invasive plant materials within the limits of construction will be removed. • The site irrigation system shall be fed from the existing potable water service. • The irrigation system will be constructed with bubblers & low spray heads to maximize control. Concession/Ticket Room/Control Building/Pool Equipment/Life Guard Building • An approximately 1350 square foot single story structure will be designed and constructed to include a men's toilet room, a women's toilet room, a lifeguard/ticket office, a concession area, a family changing room, a pool equipment room and an electric room. • The structure shall be constructed with 8" reinforced concrete masonry units, 4" reinforced concrete slabs on grade and prefabricated metal bar joist systems with 2" metal decks. • A built up roofing system consisting of a single ply membrane, protection board and vapor barrier over 2" LWT concrete shall be installed over the metal decking. • The roofing system will meet with Miami-Dade product approval. Murray Park Community Pool RFP No. SM-PW201 0-1 0 -Page 2 of 6 • The building exterior will be provided with a painted 5/8" smooth stucco finish. • Aluminum intake louvers with insect screens shall be installed in the exterior walls to provide ventilation into the restrooms, lifeguard/ticket office, concession area, electric room & the pool storage room. The louvers shall meet Miami-Dade product approval. • Hollow metal exterior doors/frames shall be constructed of galvanized exterior grade material. The doors shall meet Miami-Dade product approval. • Door hardware provided shall be vandal proof "Classroom" type functions. • Glass window systems will be constructed of high impact resistant tinted glass with anodized aluminum framing. The windows shall meet with Miami-Dade product approval. • Manually operated roll-up windows with ADA compliant exterior ledges will be provided in the ticket office & concession area. The roll-up windows shall meet with Miami-Dade product approval. • The toilet room interior and chase walls shall be constructed of reinforced concrete masonry units. • The men's toilet room, women's toilet room and family changing room walls shall be finished with a skim coat, two (2) coats of epoxy paint. • The lifeguard/ticket office and concession area walls shall be finished with a skim coat & two (2) coats of paint. • The interior block walls of the pool equipment room and electric room shall be finished with block filler paint. • The lifeguard/ticket office and concession area shall have VCT finished floors with 6" vinyl cove bases. • The men's toilet room, women's toilet room and family changing room shall be provided with a standard color ceramic tile floor with a tile base. • The pool equipment room and electrical room shall have a troweled/sealed concrete floor finish. • The lifeguard/ticket office and concession area shall be provided with a 2'x4' moisture resistant acoustic ceiling tile system. • The men's toilet room, women's toilet room and family changing room will be constructed with a painted gypsum board ceiling finish. • The pool equipment room and electric room shall have an exposed painted ceiling. • ADA compliant and standard height changing benches will be provided in the men and women's toilet rooms. • Millwork shall be constructed of plastic laminate over exterior grade plywood with water resistant adhesives. • The concession area will be provided with a fabricated counter at the transaction window. Sneeze guards will be provided as required by health codes. • Fire extinguishers shall be provided to meet the NFPA and Florida Building Code requirements. • ADA signage shall be provided as required by the Florida Building Code. • The floor mounted toilet & urinal partitions will be constructed of %" thick high-density polyethylene plastic with natural anodized aluminum hardware and head-rail bracing. • Toilet accessories to be Stainless Steel as manufactured by Bobrick (or equal) and shall comply with the latest ADA regulations. • A diaper changing station shall be provided in each toilet room & family changing room. • ADA showers will be provided in the men's and women's toilet rooms with seats, curtains, curtain rods & robe hooks. • The men's restroom facility shall consist of two (2) floor-mounted water closets, two (2) wall-hung urinals (w/carriers), three (3) wall-hung lavatories (w/carriers), one (1) ADA shower, one (1) wall hydrant and two (2) floor drains. • The women's restroom facility shall consist of five (5) floor-mounted water closets, three (3) wall-hung lavatories (with carriers), one (1) ADA shower, one (1) wall hydrant and two (2) floor drains. Murray Park Community Pool RFP No. SM-PW201 0-1 0 -Page 3 of 6 • The family changing room shall consist of one (1) ADA floor-mounted water closet, one (1) ADA wall-hung lavatory (with carrier), one (1) hose bib & one (1) floor drain. • A mop basin, mop hanger & hose/hose bracket will be provided in the pool equipment room. • A natural gas domestic hot water heater (80-gallon) will be installed in the pool equipment room. • Domestic hot water piping shall be provided to the mop basin, showers and lavatories. • A uBi-Level" ADA compliant stainless steel electric water cooler shall be installed on the exterior of the building at the pool deck area. • Recessed wall hydrants (with lockable boxes) shall be installed in the exterior wall of the buildings. • The restrooms, changing room, lifeguard/ticket office, concession area & electric room will be provided with mechanical ventilation. • The pool equipment room will be provided with cross ventilation. • Recessed fluorescent light fixtures will be installed in the lifeguard/ticket office and concession area. • Surface mounted fluorescent light fixtures will be installed in the restrooms and changing stations. • Linear fluorescent gasket light fixtures will be installed in the pool equipment room. • Linear fluorescent light fixtures with wire guards will be installed in the electric room. • Installing battery backup in some of the fluorescent light fixtures will provide interior emergency lighting. • Future phone/data outlets will be provided in the administration/ticket office, lifeguard office and concession area. • Power outlets shall be provided in sufficient quantities for equipment & uses planned in the support building. Pool Deck • The pool deck will be constructed of reinforced concrete. • Pool is not designed for night time use. Deck lighting is including for security only and not to meet Florida Department of Health requirements for nighttime use. • A deck drainage system shall be designed and incorporated into the storm water management system. • Quick connect hose bibs & electrical outlets will be provided along the perimeter of the pool deck spaced at 100'-0" intervals. Recreational Pool (Approximately 3,500 SF) • The recreational pool shall be designed as a concrete pool with a slip resistant quartz aggregate finish. • The recreational pool shall be designed in accordance with DOH requirements with a bather load of 120 persons • The recreational pool will have a minimum depth of 0'-0" pitching to a maximum depth of.:!: 6'-0". • Underwater lighting will be installed. • Pool ladders will be provided for accessing the pool. • Pool piping systems shall be installed in PVC (Sch. 40). • Pool filtration & chemical controller/feed systems will be installed. • Pool pumps will be provided with variable frequency drive motors to conserve energy. • A natural gas pool heating system will be provided. • A collector tank with an auto-fill valve will be installed. • Pool depth markers will be installed along the perimeter of the pool. • One (1) ADA compliant lift will be provided. • A portable vacuum shall be provided. • One (1) Portable lifeguard chair will be provided for use along the perimeter of the Murray Park Community Pool RFP No. SM-PW201 0-1 0 -Page 4 of 6 Community pool. • Pool safety equipment and DOH required signage would be furnished/installed. Splash Deck (Approximately 1,100 SF Wet Deck Area): • The splash pad area shall be designed to include interactive water play features with a minimum 4'-0" wide concrete splash free zone around the perimeter. • The splash pad area will be constructed of a 6" thick reinforced concrete slab with a slip resistant colored concrete surface. • The splash pad will be designed and constructed to recycle the filtered pool water & minimize storm water run-off. • Play features shall include pop jets, silly serpent, bell spray jet, palm tree / dumping coconuts, shower tower and rain drop and manufactured by Rain Drop Products or equal. • The water play feature will be constructed with stainless steel bases & have direct spray features, ground water sprays & touch activated features. • The filtration will be "dual loop" & include sand filtration with a UV disinfection system. Items by Owner • Owner to pay for and provide all soil boring and geotechnical soil reports. • Owner to pay for and provide all current topographical, boundary and elevation surveys. • Owner to pay for the natural gas line extensions to the project location -pool equipment pad from the existing gas line location. (Florida City Gas may extend this line at no charge -to be determined). • Any improvements to the existing facilities around the proposed development. • All Department of Environmental Resource Management (DERM) fees to be paid by the City of South Miami. • All Miami-Dade Water & Sewer Department (WASD) fees to be paid by the City of South Miami. • All Florida Department of Environmental Protection Water & Wastewater Permit fees to be paid by the City of South Miami. • All Florida Department of Environmental Protection (FDEP) NPDES Construction Activities Permit fees to be paid by the City of South Miami. • All Building Construction Permit fees to be paid by the City of South Miami. • FPL impact and primary electrical and new transformer service fees to be paid by the City of South Miami. Exclusions • Site de-mucking, mass grading and removal of unsuitable soils. • Any improvements to the existing facilities around the proposed development. Any improvements or upgrading of the existing off-site utilities servicing the proposed development. These may include but are not limited to gas lines, sewer lines, water lines, and drainage utilities. However, this exclusion does not apply to the Alternate work agreement sent forth below. • Pool deck furnishings. • Pool is not designed for night time use. Deck lighting is including for security only and not to meet Florida Department of Health requirements for nighttime use. The total price for the above scope of work and services: $1,422,000.00 One Million four Hundred Twenty Two Thousand and 00/100 Dollars. Murray Park Community Pool RFP No. SM-PW201 0-1 0 -Page 5 of 6 Alternate: To connect new project to the existing water and sanitary sewer systems assuming that the receiving sanitary sewer pump station (M-DWASD Pump Station #177) is no longer under conditional moratorium, and that M-DWASD has finished all of the proposed upgrading to the subject pump station. RDC shall provide the city with a design proposal including the cost breakdown of the design and permitting of the Alternate work immediately. Once the permit has been issued RDC shall enter into a separate contract/Change order to construct the Alternate work for a reasonable price, to be negotiated in accordance with the contract. Cost to connect to existing sanitary sewer system, to be negotiated. If you have any questions, please feel free to contact me at (954) 566-3885. We look forward to working with you and having this project completed in a timely manner. Sincerely, Recreational Design & Construction, Inc. Joseph C. Cerrone, '" President O:IBIDSIBIDS 2010lBid 939-10 Murray Park Community PoollOWNER CONTRACT DOCUMENTS\(2013-03-20) REV EXHIBIT BIMurray Park REVISED-Exhibit.S 3.20.13.rtf cc; Steven P. Kulick: Purchasing Manager Steven Alexander: ALEXANDER GLOBAL COMMUNICATIONS Murray Park Community Pool RFP No. SM-PW201 0-1 0 -Page 6 of 6 N,~ c<",if!'~, ;'Zrn$""'i~~i"~$. '~f"'oJI::licn~, 0; ~!e:::uor'''c >1!v;~io."~ of Jr>y pcr~io"$ of rh~~e orlJwif19;' in h·.~CJI:: Ot i" P""[ I"I.~"" &e I'f':.~de ".-itn:;,·t I~C cxp~.\~ ..,'Iitte" pcrJl'liHiI.''l of Zy.\co0r:b 1,.,c. ~~; ::':~~~i:~:J;';:~;d ~~;;~~,;"~'!II~.\ M~ tfm pmpcrty ~4 ?r,\'r.~)\'I,·h 1m:. ZYSCOVICH ARCHITECTS Women's Restroom / Changing Men's Restroom / Changing Family I Changing Ticketing Office Concessions Pool Equipment Electrical Concrete Pool Deck Entry Area Recreational Pool Picnic Area ADA Bi-Level Drinking Fountains Landscaping Signage Stabilized Walkway Concrete Sidewalk Splash Deck area Pool Equipment Yard 311 s.f. 264 d. 49 s.f. 215 s.f. 115 s.f. 148 s.f. 40 s.f. +/-6,200 s.f. 3,500 s.f. 1,110 s.f. Additional restrooms fixtures have been included in the design to meet the Department of Health requirements for the future construction of a Splash Deck 1 RECREATIONAL. DESIGN & CONSTRUCTION. INC. ACCOUNT ACTIVITY LISTING From: 10101/2012 To: 09/30/2013 FY BatchlD Description Trans # Ref Date Debit Credit Net Fund: 114 Key: 11440 I 0 -5413100 2013 OH007455 Recreational De RDC CONTRACT C 0000652208 06119/2013 3,450.00 0.00 2013 OH007455 Recreational De RDC CONTRACT -0000652208 06119/2013 13,196.10 0.00 2013 OH007826 MIAMI DADE COUN DERM'S WATEI 0000652306 07/09/2013 115.00 0.00 2013 OH007826 FLORIDA DEPARTM DOH'S REVIEW 0000652304 07/09/2013 650.00 0.00 2013 OH008328 Recreational De RDC CONTRACT -61 00650664 08/02/2013 6,598.05 0.00 2013 OH008709 MIAMI DADE WATE PW POOU GOI 0000652524 08/20/2013 90.00 0.00 2013 OH008709 Recreational De RDC CONTRACT -61 00650677 08/20/2013 6,596.05 0.00 2013 OH008709 Recreational De Change Order # 61 00650677 08/2012013 1,725.00 0.00 2013 TROOO041 Recreational De RDC CONTRACT -61 00650677 08/21/2013 0.00 6,596.05 2013 TROOO041 Recreational De Change Order # 61 00650677 08121/2013 0.00 1,725.00 2013 RE082 I 13 Recreational De RDC CONTRACT -0000652543 08/21/2013 6,596.05 0.00 2013 RE082 I 13 Recreational De Change Order # 0000652543 08121/2013 1,725.00 0.00 2013 OH008843 MIAMI DADE BUlL Permits for Mu 0000652564 08/29/2013 242.00 0.00 Account Total: 40,983.25 8,321.05 32,662.20 Fund Total: 40,983.25 8,321.05 32,662.2( S41345U SNP MlHl.R/\.Y PARK! CONrP-AC,VAL SERV 182,641.50 5413450 Dr.$, 12-SMlA·CB I CONTRACTtJA.L SUN G.O) s..tiJ31O i.3-SMJACB GRANT / PART TIME 26.77S.0G ~,4134'50 13·SM1A.(e GRANT! CONTRACTUAL SERV le;400.0n 5416490 G03, WATER m$T! Cot~STRlJCTJON5 PR. O.VO 5413:100 GOB-W.41TR & SE .... .;E! PROfESSiONAL SER l04))OO.on , $413450 749)B7.00 FY Fund: 114 Key: 1144010 -5413450 2013 2013 OH008776 OH009248 ACCOUNT ACTIVITY LISTING From: 10/01/2012 To: Description MIAMI DADE WATE City Hall Sewe MIAMI DADE BUlL MDC Building P 0000652545 0000652674 09/30/2013 Ref Date 08/23/2013 09117/2013 Account Total: Fund Total: 862.40 246.00 1.108.40 1.108.40 0.00 0.00 0.00 0.00 1.108.40 1.108.4(