Loading...
5TO: FROM: DATE: City of South Miami PUBLIC WORKS & ENGINEERING DEPARTMENT 4795 SW 75 th Avenue Miami, FL 33155 Tel. (305) 403-2063 Fax (305) 668-7208 Steven Alexander, City Manager Jorge L. Vera, Capital Improvement Project Manager June 4,2012 2001 5 Resolution: A Resolution authorizing the City Manager to pay Coreland Construction Corp . $7,972.57 for the emergency water leak repair by City Hall and Library entrance to be charged to account 001-1790-519-3450. Background: On April 02, 2013, the Public Works received notification of a water line break in front of the South Miami Public Library . Upon inspection of the area it was confirm that water was bubbling up through the tile and sidewalk . The cause of the damage and the seriousness of the leak was unknown, since the water line was running underneath the sidewalk. The water lines were installed as part of the road improvement project that was done around 2008 for Sunset Drive . Expense: Account: At the time of the water leak, the City had a contract with Coreland Construction Corp . to perform sidewalk and roadway improvements in other parts of the City. Due to the hazardous and unsafe conditions to the public from the water leaking through the sidewalk, the City requested Coreland Construction Corp to perform the repairs. Since the area and the extent of the damage was not known, the job had to be priced on time and material basis . The job consisted of removal of the sidewalk, locating the damage water pipe, repairing the pipe and restoring the sidewalk to its original state . Coreland Construction Corp. provided an expeditious service and accurate results ; The leak was found, the lines repaired and the job was completed in 2 days. Amount for emergency repair $7,972.57 The expenditure is charge to the Engineering and Construction Division account number 001-1790-519-3450.which has a balance of $64,084.55 before this request was made . Attachments: Proposed Resolution Plan of location of leak Backup documentation 1 2 RESOLUTION NO. _____ _ 3 A Resolution authorizing the City Manager to pay Coreland Construction Corp. 4 $7,972.57 for the emergency water leak repair by City Hall and Library entrance to 5 be charged to account 001-1790-519-3450 6 WHEREAS, the City encountered a broken water line that threatened to flood the roadway on 7 Sunset Drive in front of City Hall and which would have endangered vehicular and pedestrian traffic ; and 8 WHEREAS, it is the desire of the commission to timely repair water lines to prevent flooding or 9 damage and provide vehicular and pedestrian safety . 10 WHEREAS, the Mayor and City Commission desires to authorize the City Manager to pay 11 Coreland Construction Corp for the emergency repair work which included the excavation and repairing of 12 a broken water line and replacing the damaged sidewalk and ramp ; and 13 NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF 14 THE CITY OF SOUTH MIAMI, FLORIDA: 15 16 Section 1. The City Manager is authorized to pay Coreland Construction Corp for the emergency 17 water leak repair by City Hall and Library entrance for an amount not to exceed $7,972 .57. 18 19 Section 2: The expenditure shall be charged to the Engineering and Construction Division 20 account number 001-1790-519-3450 which has a balance of $64,084 .55 before this request was made 21 22 Section 3: If any section clause, sentence, or phrase of this resolution is for any reason held 23 invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of 24 the remaining portions of this resolution. 25 26 Section 2. This resolution shall be effective immediately upon being approved . 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 PASSED AND ADOPTED this __ , day of ___ , 2013 . ATTEST: CITY CLERK READ AND APPROVED AS TO FORM, LANGUAGE, LEGALITY AND EXECUTION THEREOF CITY ATTORNEY APPROVED : MAYOR COMMISSION VOTE : Mayor Stoddard : Vice Mayor Liebman : Commissioner Newman : Commissioner Harris : Commissioner Welsh : "ThO 0IcfaId" BUIdW>s (mulU-ItOty mlxlId uu "flGet cQt\Slr..oCUon) 1 Stay O>nvne<cJallR...., BuIIdt-c 81dg I SIJ~ 72nd ST. (SUNSET DR.! ~ _ UnIIed B«I9 I 6075 CORELAND CONSTRUCTION CORP. 12301 S.W. 128 Court, Suite 107 Miami, FL 33186 Phone # Fax# (30S) 233-1709 (305) 233-1809 PflX BILL TO City of So lith Miami Division ofPlIrchasing 6130 Sunset Drive South Miami, FL 33143 305-663-6339/305-667-7806 fnx DESCRIPTION PROJECT NAME/ADDRESS Emergency Leak Repair South Miami, FL P.O. NO. DATE 4/25/2013 This invoice is for full and final payment of work performed for the Emergency Leak Repair, ns per directive issued by City of South Miami to perform work on the bnsis of time, materials, equipment, plus profit & ove.·head. Vendor No.: 0090164 / Coreland Construeltan COJ;1)6Tf\te Oft~· Sigllature~ ~. ~) Vf/-Total / .......... -----/ Invoice INVOICE # 2013104 TERMS Net 30 AMOUNT 7,972.57 $7,972.57 CORELAND CONSTRUCTION CORP. Date: Submit to: Project: 4/24/2013 BOWNER ARCHITECT/ENGINEER OTHER Emergency Leak Repair INVOICE Invoice#: 2013104 ATTN: Jorge L. Vera, CI, PM Tel: 305-403-2072/ Fax: 305-668-7208 City of South Miami 4795 SW 75th Avenue Project #: N/A Description: Time Extension to Perform Work: N/A Days This invoice is for the Emergency Leak Repair project as per directive issued based on Time, Material, Equipment, Overhead & Profit. Cost Detail: A. Labor ______________ •••• _. ___ •• _ •• _._ •••• _____ • _____ • ____ ._ •• _. ___ • ___ • __ •• _________ 2,~?_:.~.Q. B. Materials ________________________ .. _______ .. __________________ ._. _______________ "L.?i1:!!!.... C. EquipmentlTrucks ________________________________________ ~854.0.Q. D . Overhead & Profit 15.000/0 ____________________________________________ • ________ • ___________ ~Q~~:..~g_ G . TOTAL _________________________________ • ______ • __ •• _. ____ •• __ • ____________ • _____________________ 7 ,972.5 L City of South Miami Coreland Construction Corp. Accepted By: Accepted By: Signature Signature Date Date Page 1 of 1 12301 S.W. 1281h Court, Suite 107 • Miami, FL 33186 • 305-233-1709 Office. 305-233-1809 Fax www.corelandconstruclion.com CORELAND CONSTRUCTION CORP. INVOICE BACK-UP Invoice # 2013104 Project: Emergency Leak Repair Project #: N/A LABOR ITEM DESCRIPTION QUANTITY 1 Superintendent 24 2 Carpenter (Form Work) 2 3 Concrete Finisher 14 4 Common Labor 18 5 Pipe Layer 3 6 Bobcat Operator 4 MATERIALS ITEM DESCRIPTION 1 ACE Hardware (Plumbing Material) 2 Stern Bros. Plumbing Supply (3" Tee) 3 Homedepot (Rock Salt) 4 Homedepot (2" X 4" Screed) 5 ACE Hardware (Tile Thin-set) 6 Fuel 7 ADA Truncated Stencil 8 ADA Truncated Stencil Delivery 9 Barreiro Concrete Color : Grey 10 Barreiro Concrete Color: Coral Gables Beige EQUIPMENTITRUCKS ITEM DESCRIPTION QUANTITY 1 Dump Truck Hauling Cost per load 2 2 BobcatlSkidsteer 1 3 Walk Behind Plate Tamper 4 Jack Hammer attachment for BobcatlSkidsteer 5 6 7 8 Jack Hammer Delivery Jack Hammer Pick-up Concrete Debris Disposal Cost per load MOT Page 1 of 1 2 3 UNIT hrs hrs hrs hrs hrs hrs Labor Burden daily each UNIT load daily daily daily each each load daily UNIT COST $40.00 $25.00 $30 .00 $18.00 $25 .00 $30.00 30.20% SUBTOTAL $137 .50 $259 .84 SUBTOTAL UNIT COST $300 .00 $380.00 $150 .00 $324 .00 $100.00 $100 .00 $450 .00 $100 .00 SUBTOTAL 12301 S.W. 128'h Court, Suite 107 • Miami, Fl 33186 • 305-233-1709 Office. 305-233-1809 Fax www.corelandconstruclion.com AMOUNT $960.00 $50.00 $420.00 $324.00 $75 .00 $120 .00 $1,949.00 $588 .60 $2,537.60 AMOUNT $37.80 $9.98 $6.20 $2.98 $10 .15 $150.00 $137.50 $259 .84 $399.11 $527.51 $1,541.07 AMOUNT $600.00 $380.00 $150 .00 $324.00 $100.00 $100.00 $900.00 $300.00 $2,854.00