Loading...
4City of South Miami PUBLIC WORKS & ENGINEERING DEPARTMENT 4795 SW 75 th Avenue Miami, FL 33155 Tel. (305) 403-2063 Fax (305) 668-7208 South Miami bttl~ ;~fI.; 2 001 TO: Steven Alexander, City Manager FROM: Jorge L. Vera, Capital Improvement Project Manager DATE: June 4,2013 Resolution: A Resolution authorizing the City Manager to enter into a contract with R.P. Utility and Excavation Corp. for a contract price not to exceed $19,850.00 for the Sylva Martin Drainage Project, to be charged to Capital Improvement Program Fund account number 301-1790-519-6450. Background: The City has undergone interior remodeling of the Sylva Martin building, which will be used to house several of the City's departments . As part of the renovation , the area outside the former Central Services office also requires some up grading. The area outside is prone to flooding due to insufficient drainage. In order to address the flooding issue , a drainage system needs to be installed. This will prevent infiltration into the building. Expense: Account: The City received 7 proposals from qualified contractors to perform the drainage work. Upon evaluating all the proposals and the current status of vendors, it was determined that R.P. Utility and Excavation Corp was the most responsive and responsible bidder. Additionally, the City contacted prior work references to assure that R.P. Utility and Excavation Corp had completed their prior projects on time within budget and without any incidents. Contract amount not to exceed $19,850.00 . The expenditure is charged to the Capital Improvement Program Fund account number 301-1790-519-6450 which has a balance of $42 ,572 .99 before this request was made . Attachments: Proposed Resolution Bid Form Bid Opening report Sunbiz Corporate Information for each vendor. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 RESOLUTION NO.: _____ _ A Resolution authorizing the City Manager to enter into a contract with R.P. Utility and Excavation Corp .. for a contract price not to exceed $19,850.00 for the Sylva Martin Drainage Project, to be charged to Capital Improvement Program Fund account number 301-1790-519-6450. WHEREAS, the Mayor and City Commission wishes to provide installation of a drainage system outside of the Sylva Martin building, and WHEREAS, pursuant to a competitive selection process, it was determined that R.P . Utility and Excavation Corp . submitted a proposal in the amount of $19,850 .00 that was the most comprehensive and cost effective in its construction approach; and WHEREAS, the work shall consist of the installation of a drainage system to address the flooding problem along the rear of the Sylva Martin building; and WHEREAS, the total expenditure is not to exceed $19,850.00; and WHEREAS, the Mayor and City Commission desire to authorize the City Manager to enter into a contract with Coreland Construction Corp. for Sylva Martin Drainage Project for an total amount not to exceed $19,850 .00 . NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA THAT: Section 1: The City Manager is authorized to enter into a contract with R.P . Utility and Excavation Corp. for the Sylva Martin Drainage Project for an amount not to exceed $19,850.00. Section 2: The expenditure shall be charged to the Capital Improvement Program Fund account number 301-1790-519-6450 which has a balance of $42,572 .99 before this request was made. Section 3: If any section clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining portions of this resolution. Section 4. This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED this ___ day of ______ , 2013 . ATTEST: CITY CLERK READ AND APPROVED AS TO FORM LANGUAGE, LEGALITY AND EXECUTION THEREOF CITY ATTORNEY APPROVED: MAYOR COMMISSION VOTE: Mayor Stoddard Vice Mayor Liebman Commissioner Newman Commissioner Harris Commissioner Welsh • BID OPENING REPORT Bids were opened on: Wednesday, May 15 ,2013 after: 10:00am For: RFP#PW-C2013-05-SYLVA MARTIN DRAINAGE PRO.TECT COMPANIES THAT SUBMITTED PROPOSALS: AMOUNT: 1. CORELAND CONSTRUCTION g~~ ~i";). 00 2. FLORIDA CONSTRUCTION & ENGINEERING INC. ,,~?, ,~~ . 00 3. JV A ENGINEERING CONTRACTOR . INC. SW,500.DO - 4. R.P. UTILITY & EXCAVATION CORP. ll:. ICiL &50. Ot) 5. RENE'S EQUIPMENT RENTAL -MASTER PAVING ENGINEERING, LLC i ';lQ ens. 00 6. ROADWAY CONSTRUCTION, LLC. Jb ~S 1''1~. (00 7. V ENGINEERING & CONSULTING .Ii Lf~, IOD . OQ 1--- I--- THE ABOVE BIDS HAVE NOT BEEN CHECKED. THE BIDS ARE SUBJECT TO CORRECTION AFTER THE BIDS HAVE BE EN COMPLETELY REVIEWED. City Clerk: ~~ fu\\,J'l PrintN~ c ---;Iff WIlD .. " .~ 11--'2-fu..~ Pl'intfame Witness: "/ t) IZ" I? 1 j{,-,.e4 Print Name BID FORM The following is a Lump Sum Bid Proposal is presented to the City. The Bid Amounts includes all items described in the Bid Documents (Detailed Specifications). Upon receiving a Notice of Award contractor shall submit a detail schedule of Values. Payment shall be made on the basis of Work actually performed and completed. The Base Bid Amount includes all material and labor for the construction of the project entitled SYlVA MARTIN DRAINAGE PROJECT: LUMP SUM BASE BID AMOUNT $_----'-/_7.!.....?+/--'8'boL---'2,'--""O~1 ----"-P-LO.L--______ _ LUMP SUM BASE BID AMOUNT (IN WORDS) /1".;' eree 0 -rA(J(/~/{ H. cI e/~4l-~vI14c/' hErr-c/dt.t£> , Taxpayer Identification Number: (Signature AuthorIZed RepresentatIve) ~(~( h-4~~-he SI d/I 1 I- (Printed Name and Title) Ljll () StU //6 ,A(/(j HI ~,I.,-{ t' ;CL -g 3 I IF ~ (Company Address) (~~b) tj6~ 'I?CJ8 (Company Phone Number) [END OF SECTION] Page 22 of91 Detail by Entity Name Home Contact Us E-Flling Services Events No Name History Return to Search Results Detail by Entity Name Florida Profit Corporation RP. UTILITY & EXCAVATION CORP Fllina Information Document Number FEI/EIN Number Date Flied State or Country Status Effective Date Last Event Event Date Filed Event Effective Date Principal Address 838 NW 134th Place MIAMI, FL 33165 Changed: 02/16/2013 Mailina Address PO BOX 941286 MIAMI, FL 33194 Changed: 04/08/2013 P11000062856 452742507 07/11/2011 FL ACTIVE 07/11/2011 AMENDMENT 04/08/2013 NONE Reaistered Aaent Name & Address PEREZ. RAIDEL 14110 SW 110TH AVENUE MIAMI, FL 33165 IAddress Changed: 02/16/2013 OfficerlDirector Detail Name & Address Iritle P PEREZ. RAIDEL ~110 SW 110TH AVENUE MIAMI, FL 33165 'Annual Reports Document Searches Page 1 of3 Forms Help I Entity Name Search I Search -I http:// search.sunbiz.org/lnquiry ICorporationSearch/SearchResuitDetaillEntity N ame/domp-... 5/20/2013