Loading...
6To: Via: From: CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM The Honorable Mayor Stoddard and City Commission South Miami hOd ;'TiiP 2001 Date: Steven J. Alexander City Manager Christopher Brimo, AICP fI) / Planning Director 7' February 27,2013 ITEM No._--'6='--__ Subject A Resolution relating to the review and acceptance of the Annual Report of the 64 Development Corporation on their proposed mixed use development project located at 5966-70 S. Dixie Highway PROJECT SUMMARY The City Commission at its June 5, 2007 meeting approved Resolution No. 97-07-12482 allowing 64 Development Corporation to construct a mixed use building on property in the SR (HD-OV) zoning district. The vacant site at 5966-70 South Dixie Highway contains 31,523 square feet and has sides facing three streets. The project is a mixed use (office I retail) four story building with an integrated parking structure. There will be 38,233 square feet of commercial office and 11,052 square feet of retail space. The applicant received approval for three special exceptions to modify regulations pertaining to lot coverage, building size, and location of curb cuts. DEVELOPMENT AGREEMENT Following a period of negotiations the developer and the City agreed to place covenants, conditions and terms into an independent Development Agreement which would be in effect for 10 years, which allows all zoning (special exceptions) to continue. The City Commission approved the Agreement on March 18, 2008 via Resolution No. 41-08-12638 (attached). The agreement was duly executed and recorded in the County registry of deeds on April 9, 2008 as required by Section 35 of the Agreement. The Development Agreement is attached. In addition to the Development Agreement a supplemental Right of Way Maintenance Agreement for the same project was also approved by the City Commission on May 20, 2008 via Resolution No. 80-08-12677. This agreement sets forth drainage and street improvements required for the project. ANNUAL REPORT REQUIREMENT The Development Agreement includes a requirement that the developer submit an annual report on or before the anniversary of the effective date (March 18, 2008) of the Development Agreement (Section 27). It is a status report showing that obligations have been met and that there has been compliance with the provisions of the Agreement. The report must be reviewed by the City Commission at a public meeting. The City Commission may accept the report or if there is a finding by the Commission that there has been a failure to comply with the terms of the Development Agreement, the Agreement may be revoked or modified by the City. 2 2013 ANNUAL REPORT (Update) The 2013 Annual Report was submitted to the City on February 15, 2013. The developer indicates that as of February 6, 2013 a "new private equity investment group, SLON Capital, has acquired the existing loan on the project.". The developer further states that negotiations are underway in order to resume construction. On April 3, 2012, the City Commission approved the reassignment of the development agreement to a new majority shareholder [Resolution 72-12-13629]. However, the financing negotiations did not corne to fruition and the final recording of the reassignment documents did not occur. The project owner, Mr. Marcello Fernandes, indicated that currently it is not his intention to request reassignment of the development agreement. Attachments: Draft Resolution Communication from Marcelo Fernandez, received February 15, 2013 Annual Report/or 2013 Z: IComm ItemsI201213-20-12164 Development COlp. Annual Reportl64 Development Project Annual Rep (2012) CM report. doc 1 RESOLUTION No. ------- 2 3 A Resolution relating to the review and acceptance of the Annual Report of 4 the 64 Development Corporation on their proposed mixed use development 5 project located at 5966-70 S. Dixie Highway 6 7 WHEREAS, the City Commission at its June 5, 2007 meeting approved Resolution 8 No. 97-07-12482 allowing 64 Development Corporation to construct a mixed use (office I retail) 9 four story building with 38,233 square feet of commercial office and 11,052 square feet of retail 10 space located at 5966-70 S. Dixie Highway in the SR (HD-OV) zoning district; and 11 12 WHEREAS, the City Commission approved a Development Agreement for the project 13 on March 18,2008 via Resolution No. 41-08-12638. which agreement was fully executed and 14 was recorded in the County registry of deeds on April 9, 2008 as required by Section 35 of the 19 15 Agreement; and 16 17 WHEREAS, the City Commission approved a Right of Way Maintenance Agreement for 18 the project on May 20, 2008 via Resolution No. 80-08-12677 which agreement sets 23 forth 19 drainage and street improvements required for the project; and 20 21 WHEREAS, the Development Agreement includes the requirement (Section 27,) that the 22 developer submit an annual report 30 days before the anniversary of the effective date which 23 report is a status report showing that obligations have been met and that there has been 24 compliance with the provisions of the Agreement.; and 25 26 WHEREAS, the 2013 Annual report was submitted to the City on February 15, 2013 27 from Marcelo Fernandes, Vice President of the 64 Development Corporation, said report 28 concluding that all of the obligations set forth in the Development Agreement shall be met and 29 that due to economic and market considerations the project has not been completed; and 30 31 WHEREAS, the annual report in accordance with the Development Agreement must be 32 reviewed by the City Commission at a public meeting and the City Commission may accept the 33 report or if there is a finding by the Commission that there has been a failure to comply with the 34 terms of the Development Agreement, the Agreement may be revoked or modified by the City. 35 36 NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY 37 COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA: 38 39 Section 1. The 2013 Annual Report submitted by the 64 Development Corporation on 40 its proposed mixed use project located at located at 5966-70 S. Dixie Highway as required by 41 46 Section 27 of the Development Agreement is hereby accepted without waiving the right to 42 reverse the approval if any of the factual statements are found to be inaccurate. 43 44 Section 2. This resolution shall be effective immediately upon being approved. 45 1 2 PASSED AND ADOPTED this __ day of ,2013. 3 4 5 ATTEST: APPROVED: 6 7 8 9 10 11 12 13 14 15 16 17 CITY CLERK MAYOR READ AND APPROVED AS TO FORM, COMMISSION VOTE: LANGUAGE, LEGALITY AND Mayor Stoddard: EXECUTION THEREOF Vice Mayor Liebman: Commissioner Newman: Commissioner Harris: CITY ATTORNEY Commissioner Welsh: 64 DEVELOPMENT CORP. February 15, 2013 City of South Miami Zoning Director Christopher Brimo 6130 Sunset Drive South Miami, FL 33143 Re: Resolution NO.: 41-08-12638; 5966 S. Dixie Highway Dear Mr. Brimo, As per the requirements set forth in the above referenced Resolution, enclosed please find the annual report updating you on the status of the project located at 5966 S. Dixie Highway. Please contact me if you have any questions regarding this report. SincerelY'B /~ .. 4A I I /44 Marcel~ ernandes Vice-Pr: sident RECEIVED FEB 1 5 2013 Planning and Zan' DePartmentmg 7440 SW 50 TH TERRACE, SUITE 110 MIAMI, FLORIDA· 33155 PHONE: 305-663-1293 • FAX: 786-363-4336 WEB SITE: OXFORDUNIVERSAL.COM UPDATE -FEBRUARY 2013 DEVELOPMENT AGREEMENT BETWEEN THE CITY OF SOUTH MIAMI, FLORIDA AND 64 DEVELOPMENT CORPORATION An Item by Item review is detailed below as requested per section 27 of the Agreement: Development Conditions as outlined in Section 8 of the Contract: , (a) The Company shall meet all applicable building codes, land development regulations, ordinances and other laws. UPDATE: COMPLETED -Permits have been attained from the following City of South Miami departments: Building and Zoning Public Works Miami Dade DERM Miami Dade WASA All permits meet the applicable codes and ordinances All permits are in good standing (b) The Company shall adhere to the requirements of all permits for the project. UPDATE: IN PROGRESS: As of February 6, 2013 a new private equity investment group, SLON Capital, has acquired the existing loan on the project. This new group has been working closely with Developer to be able ~o complete the project as quickly as possible. SLON Capital is using their own funds to complete the project. They have signed an agreement with the architect to re-start the project and are proceeding with negotiations to finalize the construction. Even before closing on this transaction, funding for the continuation of the construction activity has already Page 1 of 9 taken place. With this new group the recent activity at the project has been as follows: 1. All deteriorated wood forms removed 2. All shore posts removed 3. Entire site cleaned 4. Structural basement wall sections completed 5. Multiple inspections by threshold structural engineer 6. Inspections by City of S Miami Work Expected to continue during the next 60 days: 1. Remove & Reinstall new fence and screen 2. Complete all structural basement wall sections 3. Backfill entire site to basement structure 4. Grade entire property Beyond the scope of work identified above the mobilization to start up the construction at full force is expected to take place in April 2013. Currently bidding and negotiations are taking place with all subcontractors and vendors to resume the construction at full capacity. The project is expected to have the roof level completed within 10 to 12 months of start date and occupancy available shortly thereafter. (c) The Company shall develop the project in conformance with the parameters set forth in this agreement. UPDATE: IN PROGRESS: Construction of the project will progress exactly as per the approved master permit and the terms and conditions of this agreement. (d) The Project shall be consistent with the site plan submitted with the special exceptions incorporated herein. UPDATE: IN PROGRESS: Construction of the project will progress exactly as per the approved master permit and the terms and conditions of this agreement. (e) The Company shall provide the Department of Planning with a temporary parking plan, including an operational plan, which Page 2 of 9 addresses construction employee parking during the construction period, said plan shall include an enforcement plan and shall be subject to the review and approval by the planning director prior to the issuance of any building permits and shall be enforced during construction activity. UPDATE: COMPLETED -A Detailed construction staging plan has been submitted to the City of South Miami and is currently being adhered to. f) All conditions imposed by the City Commission as part of its approvals of the special exceptions referenced herein shall be incorporated in this Development Agreement. UPDATE: C.OMPLETED -All conditions established by the City Commission have been incorporated into this Agreement and are being adhered to. g) The Company shall fund and implement traffic calming improvements along streets abutting the property. These improvements shall be set forth in detail in the agreement with the City referenced in paragraph 5 herein. UPDATE: IN PROCESS: A permit has been attained from the City of South Miami Public Works· department which details all the traffic calming improvements as requested. h) The Company shall cooperate with the City and implement the conditions for the development of the Project as set forth in the conditions of the special exception approvals as well as in this agreement. UPDATE: IN PROCESS: All permits attained have been in full compliance with all the approved special exceptions and conditions in this agreement. i) The Company shall present for Department of Planning approval a landscape plan for the Project. No building permit Page 3 of 9 shall be issued to the Company for the development of the Property prior to the City approval of the landscape plan. All proposed landscaping within the right-of-way abutting the property shall be submitted to the Public Works Department for review. The Company agrees to maintain the landscaping and accompany irrigation in perpetuity. UPDATE: IN PROCESS -A complete landscape plan has been submitted and a permit has been attained for the landscaping of the project. Landscaping improvements have not yet begun. j) The Company shall use brick or concrete pavers along the Property's frontage along US-1 . UPDATE: IN PROCESS -Permits have been attained to include a decorative concrete design along the frontage of the project. The construction of this item has not yet begun k) The building's parking shall be available to the general public for public parking during the evenings and weekends subject to the Company's right to designate the hours of operation and parking rates. UPDATE: This will be implemented upon completion of the project. I) The Company shall develop an incentive program to promote the use of Metro-rail by all employees during peak hours. UPDATE: This will be implemented upon completion of the project. m) The Company in cooperation with the South Miami departments of Public Works and Planning shall erect directional signs and traffic directional structures in the exits of the parking garage and within the public right-of-way to guide exiting traffic away from abutting neighborhood roads to US-1 during peak hours. UPDATE: IN PROCESS: A permit has been attained from the City of South Miami Public Works department which details all Page 4 of 9 these directional elements as requested. Construction under this permit has begun. n) The Company shall coordinate with the South Florida Commuter Services to promote carpooling. UPDATE: This will be implemented upon completion of the project. List of Current Permits that have been attained: Permit Type Issued By Drainage FDOT Landscaping on State Road Right of Way FDOT Temp Fence FDOT Access FDOT DERM Class V Dewatering DERM New Office Building Permit City of S. Miami Tree Removal Permit City of S. Miami Temp Electrical City of S. Miami Plumbing Permit City of S. Miami Temp. Portable Bathroom (Friendly John) City of S. Miami Water Main Extension Permit Flo Dept. of Health Demolition Permit City of S. Miami List of status of Current Permits: Water Main Extension -work completed at site. Finalizing permit DERM -Class V dewatering -work completed and permit closed New Office Building Permit -Active Temp Electrical-Active Plumbing Permit -Active Temporary Port. Toilet -Active Demolition Permit -work completed -permit closed Page 5 of 9 Photograph of the site: This photograph was taken immediately upon construction activity ceased at the site. Since then the crane and barricades have been removed. Along SW 74 Street the asphalt has been patched where work was completed and the striping has been restored to its original condition. All lumber has been removed to install new forms and prepare to begin activity again. Page 6 of 9 Photos of part of the work Completed at the basement level of the project in January / February 2013 Over 10 Containers of debris removed Concrete pouring of wall section on Jan 18, 2013 Page 7 of 9 Pouring concrete at one wall section -Jan 18,2013 Site Cleaned -all deteriorated lumber removed Page 8 of 9 Site Cleaned -All lumber and shoring removed Inspection Log Updated Page 9 of 9