Loading...
12To: Via: From: Date: SUBJECT CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM The Honorable Mayor Stoddard and Members of the City Commission Hector Mirabile. Ph.D .. City Manage~ Victor Citarella. Building Director v / , -'\ January 3. 2012 ITEM NO"_J1J..""",,--,,- 2001 An Ordinance amending the City of South Miami's existing Fee Schedule, Ordinance No. 04-11-207; amending Section A of the Building Department Schedule of Permit Fees. REQUEST: An ordinance amending the Section A of the BUilding Department schedule of permit fees to increase certain new construction. repair and renovation fees. and reduce the roofing permit fees. BACKGROUND: ATTACHMENTS: At the December 6, 20 II City Commission meeting, it was requested that staff analyze the impacts of reducing the per square cost of roofing permits from the current $0.25 per square foot. to $0.14 per square foot, in keeping with the average permit fees from neighboring municipalities. Additionally, the Building Department analysis reviewed fees for new construction. alterations and repairs, and determined that the City of South Miami fees in these categories were generally lower than surrounding municipalities. The proposed changes increases several of these fees and reduces others. Details of proposed changes are enumerated in Section A of the building permit fee schedule that is attached. Draft Ordinance with Proposed Changes Ordinance No 04-1 1-2077 Section A; BUilding Department Schedule of Permit Fees BUilding Director's Memorandum 1 ORDINANCE NO. ________ _ 2 3 An Ordinance amending the City of South Miami's existing Fee Schedule, 4 Ordinance No. 04-11-207; amending Section A of the Building Department 5 Schedule of Permit Fees. 6 7 8 WHEREAS, it is the desire of the City Commission to revise several of its building 9 permit fees to be consistent with neighboring municipalities; and 10 11 WHEREAS, the Administration supports a revision to Section A of the Building 12 Department Schedule of Permit Fees; and 13 14 WHEREAS, the Building Department reviewed and analyzed the City's schedule of 15 permit fees and determined that the city's roofing permit fees were higher than those in 16 surrounding municipalities; and 17 18 WHEREAS, the Building Department reviewed and analyzed the City's schedule of 19 permit fees and determined that the city's permit fees for new construction, alterations and 20 repairs were lower than surrounding municipalities; and 21 22 WHEREAS, the City Commission desires to accept the recommendation of the City 23 Administration and enact the aforesaid amendments. 24 25 NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND THE CITY 26 COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA: 27 28 Section I. Ordinance 04-11-2077 shall be amended as set forth in the attached Section 29 A; Building Department Schedule of Permit Fees. 30 31 Section 2. Any such fees may be waived or reduced by the Mayor and City Commission 32 by way of resolution. 33 34 Section 3: Severability. If any section, clause, sentence, or phrase of this ordinance is 35 for any reason held invalid or unconstitutional by a court of competent jurisdiction, this holding 36 shall not affect the validity of the remaining portions of this ordinance. 37 38 Section 4. Ordinances in Conflict. All ordinances or parts of ordinances and all section 39 and parts of sections of ordinances in direct conflict herewith are hereby repealed. However, it 40 is not the intent of this section to repeal entire ordinances, or parts of ordinances, that give the 41 appearance of being in conflict when the two ordinances can be harmonized or when only a 42 portion of the ordinance in conflict needs to be repealed to harmonize the ordinances. If the 43 ordinance in conflict can be harmonized by amending its terms, it is hereby amended to 44 harmonize the two ordinances. Therefore, only that portion that needs to be repealed to 45 harmonize the two ordinances shall be repealed. 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 Section 5. Effective Date. This ordinance shall become effective upon enactment. PASSED AND ADOPTED this ____ day of _____ .• 2012. ATTEST: CITY CLERK I" Reading - 2,d Reading - READ AND APPROVED AS TO FORM AND SUFFICIENCY: CITY A TIORNEY APPROVED: MAYOR COMMISSION VOTE: Mayor Stoddard: Vice Mayor Newman: Commissioner Palmer: Commissioner Beasley: Commissioner Harris: ORDINANCE NO. 04-11-2077 An Ordinance of the Mayor and the City Commission of the City of South . Miami, Florida relating to the fee schedule; amending ordinance 21·09·2013 as amended by ordinances to increase some fees, adding new fees, and deleting some fees from the schedule, providing for severability, ordinances in conflict, and an effective date. WHEREAS, the City reviewed fees schedules for Miami-Dade County and several municipalities; and, WHEREAS, the City found that fees for the County and other municipalities are higher than those fees included in the South Miami Fee Schedule; and, WHEREAS, the cost of services for Planning; Building; Parking; Parks & Recreation; Public Works; Central Services; and other related fees increased considerably in the past year with new services being requested; and, WHEREAS, the Mayor and City Commission desire to adopt a new Fee Schedule allowing funding which will cover the cost of services provided; and, WHEREAS, any such fees may be waived or reduced by the majority vote of the Mayor and City Commission by way of resolution. NOW, THEREFORE, BE IT ORDAlNED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1. That Ordinance 21-09·2013 shall be amended by this Ordinance by replacing the Permit Fee /Fee Schedule with the amended Permit Feel Fee Schedule as attached. Section 2. If any section, clause, sentence, or phrase of this ordinance is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shaH not affect the validity of the remaining portions of this ordinance. Section 3. All ordinances or parts of ordinances in conflict with the provisions of this ordinance are repealed. Section 4. Any such fees may be waived or reduced by the Mayor and City Commission by way of resolution. Section 4. This ordinance shall take effect immediately upon adoption. PASSED AND ADOPTED this 4th day of January ;:2011. Schedule to Fees Revised PY 11 Page 1 of2 Additions shown by underlining and deletions shown by ~ Ord. No. 04-11-2077 ATTEST: l'tReading 12/13/10 2nd Reading 1/4/11 APPROVED: COMMISSION VOTE: 4-0 Mayor Stoddard: Vice Mayor Newman: Commissioner Palmer: Commissioner Beasley: Commissioner Harris: Yea absent Yea Yea Yea W:Wy Documents\resolutions\Ordinance Schedule off(.':e$ update.doc Schedule to Fees Revised FY 11 Page 2 of2 Additions sho'Wfl by underlining and deletions shown by a'lefStrileiag. BUILDING PERMIT FEES SCHEDULE SECTION A • BUILDING PERMIT FEES· ·MINIMUM FEES FOR BUILDING PERMITS Residential Permit Commercial Permit NEW CONSTRUCTION (all roofed areas) o to 25,000 sq, ft. per sq. ft Plus for 25,00 I and over per sq. ft. Per each $1,000 of construction cost NEW CONSTRUCTION, RESIDENTIAL ADDITIONS Per sq. ft. ALTERATIONS, IMPROVEMENTS AND REPAIRS TO BUILDINGS Per sq. It. GENERAL REPAIRS AND OTHER WORK NOT SPECIFIED ABOVE Per sq. It. 2008 $0.65 $0.50 $0.75 $0:20 2009 $100 $150 $0.80 $0.70 $10 $0.50 $0.75 $0.20 INSTALLATION, ALTERATION OR REPAIR OF EXTERIOR WINDOW, DOORS AND SHUTTER 2010 $100 $150 $0.80 $0.70 $10 $0.50 $0.75 $0.20 ~ " " " INSTALLATION, ALTERATION OR REPAIR OF CURTAIN WALLS OR STORE FRONTS Per sq. ft $0.25 $0.25 $0.25 WOOD DECK, WALKWAY, SCREEN ENCLOSURE, POOL DECK, AWNING, CONCRETE SLAB Per sq. ft $0.20 $0.20 $0.20 FENCES, WALLS, AlC SCREENS AND RAILINGS Per linear foot ROOFING Per sq. It. SWIMMING POOLS Each PARKING LOTS AND DRIVEWAYS Per sq. ft. PARKING LOT SEAL COATING AND STRIPING o to 1.000 per sq. ft. Each additIonal 1,000 sq. ft. or fraction Page 18 of 38 $0.50 $0.10 $125 $0.15 $0.15 $10 $0.50 $0.25 $300 $0.15 $0.15 $10 $0.50 $0.25 $300 $0.15 $0.15 $10 BUILDING PERMIT FEES SCHEDULE SECTION A -BUILDING PERMIT FEES 2008 2009 2010 DEMOLITION o to 1,000 sq. ft $0.05 $0.50 $0.50 Each additional 1,000 sq. ft. or fraction $15 $15 PAINTING, SANDBLASTING OR STEAM CLEANING Commercial only. each $50 $100 $100 SIGNS Each $75 $75 $75 MOVE BUILDING OR STRUCTURE Per sq. ft $0.11 $0.20 $0.20 TEMPORARY BUILDING Per sq. ft. $0.20 $0.20 ~ TEMPORARY PLATFORMS Each $0.20 I sq.ft. $150 $150 ORNAi'1ENTALIRON Per sq. ft. $0.10 $0.10 $0.10 PILE DRIVING First pile, each $65 $65 $65 Additional pile, each $20 $20 $20 ANY OTHER WORK NOT COVERED Per each $1,000 of construction cost $10 $10 $10 AlC SCREENS, MASONARY FENCES, RETAINING WALL & RAILING Per linear foot $0.30 $0.30 $0.30 LANDSCAPING, TREES Each $10 $10 Residential ~ Commercial m New Construction m LANDSCAPING, HEDGES For each 100 L F. $25 $25 Residential, each 100 L. F. ~ Commercial, each I 00 L. F. m New Construction, each 100 L F. m Page 19 of 38 BUILDING PERMIT FEES SCHEDULE SECTION A· BUILDING PERMIT FEES 2008 2009 2010 LANDSCAPING, GROUND COVER o to 250. sq. ft.. $200 $200 Each additional 250 sq. It. or fraction $50 $50 Residential. 0 to 250 sq. ft. .$Q Residentl.J. each additional 250 sq. ft. or fraction .$Q Commercial. 0 00·250 sq. ft. S2QQ Commercial. each additional 250 sq. ft. or fraction ~ New Construction. 0 to 250 sq. ft. S2QQ New Construction. each additional 250 sq. ft. or fraction ~ FOOTING FOR POLES Each $7.50 $7.50 $7.50 ~EINSP!;CTION FEE Each $50 $50 $50 . Page 20 of 38 BUILDING PERMIT FEES SCHEDULE SECTION A -BUILDING PERMIT FEES MINIMUM FEES FOR BUILDING PERMITS Residential Permit Commercial Permit NEW CONSTRUCTION-(aU-roofed areas) o te 25,000-s<joft.per~ f'IHs for 25,001 aRe eyer ~er sq. ft. l'er~ef-€0f\Stl'li€tioo-€<>5E Per each $1 00 of construction cost NEW CONSTRUCTION, RESIDENTIAL ADDITIONS rer sq. ft. Per sq. ft. Per each $100 of construction cost ALTERATIONS, IMPROVEMENTS AND REPAIRS TO BUILDINGS rer sq. ft. Per sq. ft. Per each $100 of construction cost GENERAL REPAIRS AND OTHER WORK NOT SPECIFIED ABOVE f'er..S<j.ft. Per sq. ft. Per each $100 of construction cost 2010 $100 $150 $0.80 $0.70 $10 $0.50 $0.75 $0.20 2011 $100 $150 $0.80 $0.70 $10 $0.50 $0.75 $0.20 INSTALLATION, ALTERATION OR REPAIR OF EXTERIOR WINDOW, DOORS AND SHUTTER ~ " " D INSTALLATION, ALTERATION OR REPAIR OF CURTAIN WALLS OR STORE FRONTS Per sq. ft $0.25 $0.25 $0.25 WOOD DECK, WALKWAY, SCREEN ENCLOSURE, POOL DECK,AWNING, CONCRETE SLAB Per sq. ft $0.20 $0.20 $0.20 FENCES, WALLS, AlC SCREENS AND RAILINGS Per linear foot ROOFING Per sq. ft. SWIMMING POOLS Each PARKING LOTS AND DRIVEWAYS Per sq. ft. Page 1 of 3 $0.50 $0.50 $0.25 $0.25 $300 $300 $0.15 $0.15 BUILDING PERMIT FEES SCHEDULE SECTION A -BUILDING PERMIT FEES 2010 2011 2012 PARKING LOT SEAL COATING AND STRIPING o to 1,000 per sq. ft. $0.15 $0.15 iQJ2 Each additional 1,000 sq. ft. or fraction $10 $10 llQ DEMOLITION o to 1,000 sq. ft $0.50 $0.50 $0.50 Each additional 1,000 sq. ft. or fraction $15 $15 lli PAINTING, SANDBLASTING OR STEAM CLEANING Commercial only, each $100 $100 1!QQ SIGNS Each $75 $75 ill MOVE BUILDING OR STRUCTURE Per sq. ft $0.20 $0.20 $0.20 TEMPORARY BUILDING Per sq. ft. $0.30 $0.30 $0.30 TEMPORARY PLATFORMS Each $150 $150 li2Q ORNAMENTAL IRON Per sq. ft. $0.10 $0.10 $0.10 PILE DRIVING First pile, each $65 $65 $65 Additional pile, each $20 $20 i2Q ANY OTHER WORK NOT COVERED Per each $1,000 of construction cost $10 $10 llQ AlC SCREENS, MASONARY FENCES, RETAINING WALL & RAILING Per linear foot $0.30 $0.30 $0.30 LANDSCAPING, TREES Each Residential $0 $0 ill Commercial $20 $20 $20 New Construction $20 $20 $20 Page 2 of 3 BUILDING PERMIT FEES SCHEDULE SECTION A -BUILDING PERMIT FEES 2010 2011 2012 LANDSCAPING, HEDGES For each 100 L. F. Residential, each 100 L. F. $0 $0 ill Commercial, each 100 L. F. $25 $25 $25 New Construction, each 100 L. F. $25 $25 $25 LANDSCAPING, GROUND COVER o to 250 sq. ft. Each additional 250 sq. ft. or fraction Residential, 0 to 250 sq. ft. $0 $0 ill Residential, each additional 250 sq. ft. or fraction $0 $0 ill Commercial, 0 to 250 sq. ft. $200 $200 $200 Commercial, each additional 250 sq. ft. or fraction $50 $50 $50 New Construction, 0 to 250 sq. ft. $200 $200 $200 New Construction, each additional 250 sq. ft. or fraction $50 $50 $50 FOOTING FOR POLES Each $7.50 $7.50 $7.50 REINSPECTION FEE Each $50 $50 ~ Page 3 of 3