Loading...
7South Miami OAmerieaChy CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER - OFFICE MEMORANDUM 2001 To: The Honorable Mayor & Members of the City Commission Via: Hector Mirabile, PhD, City Manager 111111" From: Maria E. Stout -Tate, Director /� Parks & Recreation Department Date: December 14, 2010 Agenda Item No.: A Resolution of the Mayor and the City Commission of the City of South Miami, Florida authorizing the City Manager to execute an agreement with Leadex Subject: Corporation using FRDAP (Florida Recreation Development Assistance Program) grant for renovations at Dante Fascell Park's restrooms in an amount of $21,846.50 to be charged to FRDAP account # 114- 2000 - 572.63 -02; providing an effective date. Leadex Corporation is a general contractor that has done multiple and outstanding projects for the City of South Miami. Most importantly, this company is also familiar with parks' liability and ADA (American with Disability Act) compliance. An upgrade of the restrooms at Dante Fascell Park will improve the park. This park is used by many of our residents in many different ways such as, birthday Background: parties, events, sports and many other activities. A new concrete walkway around the restrooms will bring the park into ADA compliance. The cost for this renovation will remain within the scope of services as established through the FRDAP grant. A total of three (3) bids were obtained and Leadex Corporation was the lowest price. Expense: $21,846.50 Fund & Account: 114- 200 - 572.63 -02 ( FRDAP account) with a current balance of $50,856 • Proposed Resolution. Attachments: • Leadex Corporation bid • Mexal Corp bid • Design Build InterAmerican, Inc Bid Page 1 of 1 Stout -Tate, Maria From: cineas, joanne Sent: Thursday, December 09, 2010 2:32 PM To: Stout -Tate, Maria Subject: FW: Leadex As requested. Joanne M. Cineas City of South .TRiami Parks & Recreation Department From: AslanF @aol.com [AslanF @aol.comj Sent: Thursday, December 09, 2010 2:24 PM To: cineas, joanne Subject: Re: Leadex approved Larry Laurence Feingold P.A. City Attorney of South Miami. City Hall (305) 663 -6340 Beach Office: (305) 538 -1686 Cell: (305) 495 -7887 Fax: (305) 538 -7875 Web: laurencefeingold. com , t In a message dated 12/9/2010 1:36:19 P.M. Eastern Standard Time, jcineas @southmiamifl.gov writes: For your review as per Maria Stout -Tate. Joanne 34. Cineas City of South Miami Parks & Recreation Department 12/9/2010 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 RESOLUTION NO. A Resolution of the Mayor and the City Commission of the City of South Miami, Florida authorizing the City Manager to execute an agreement with Leadex Corporation using a FRDAP Grant (Florida Recreation Development Assistance Program), for renovations of the restrooms at Dante Fascell Park, in an amount of $21,846.50, to be charged to FRDAP account # 114 -2000- 572.63-02; providing an effective date. WHEREAS, the City has entered into an agreement with FRDAP (Florida Recreation Development Assistance Program) for Dante Fascell Park; and, WHEREAS, three (3) bids have been retained, and lowest bid is Leadex Corporation; and, WHEREAS, this work falls under the scope of services for building renovations; and, WHEREAS, these upgrades will bring Dante Fascell Park's restrooms into ADA (American with Disability Act) compliance. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1. The Mayor and City Commission authorize the City Manager to execute an agreement with Leadex Corporation utilizing a FRDAP Grant (Florida Recreation Development Assistance Program), through account # account # 114- 2000 - 572.63 -02, for renovations of the restrooms at Dante Fascell Park, in an amount of $21,846.50; with a grant balance of $50,856.00. Section 2. This resolution shall take effect immediately upon approval. PASSED AND ADOPTED this , day of 12010. ATTEST: CITY CLERK ;•0TI MAYOR COMMISSION VOTE: Mayor Stoddard: Vice Mayor Newman: Commissioner Beasley: READ AND APPROVED AS TO FORM: Commissioner Palmer Commissioner Harris: CITY ATTORNEY CGC010793 Leadex Corporation Telephone: 305- 266 -2028 12391 SW 130 St Miami, Fl 33176 Fax: 305 -264 -5350 To: City of South Miami Attn: Mr. Doug Baker Date: Loc: Dante Fascell Park Re: Renovations as Described 3 "SCOPE OF WORK" New concrete walkway around restroom and proshop New concrete approximately 510sq.ft New man hole bracket Women's Restroom November 17, 2010 Replace two toilets with auto flush valves Replace two lavatory sinks including spring load faucets Replace main section ofgalvanized pipe with copper pipe Relocate existing hand dryer Replace existing exhaust fan Paint interior walls approximately 600sq.ft Install two s.s. mirrors Remove section of wall for ADA access Men's Restroom Replace one urinal including auto flush valve Replace one toilet including auto flush valve Replace two lavatory sinks including spring load faucets Relocate existing hand dryer Replace existing exhaust fan Paint interior walls approximately 600sq.ft Remove section of wall for ADA access Replace main section of galvanized pipe with copper pipe Install two s.s. mirrors Total price for above mentioned work .............. ............................... Authorized Accepted by Signature Jose R Fonseca Signature $4,166.50 E.:: -� $8,840.00 $21,846.50 M EXAL core. 7424 SW 48th Street, Mimai, Florida 33155 TeL: (305) 663-9197 Fax: (305) 6638333 CGCOS7520 Proposal To: City of South Miami DATE: Dec. 9, 2010 6130 Sunset Drive South Miami, Florida 33143 ATTN.: Mr.Doug Baker PROJECT: Dante Fascell Park 8700 SW 57 Ave South Miami, FL 33143 Perform the required work to renovate Dante Fascell Park as per scope meetings at the site, and as follows: - Install new concrete walks and ramps (600 sf) around restrooms building $2,980.00 - Renovation of restrooms: -Demo vestibule walls at both restrooms - Remove and dispose existing plumbing fixtures - Install new copper water lines and fixtures - Remove and reinstall toilet partitions - install new chase wall for plumbing lines - install new 4 "x4" ceramic tile, floor and 4' wainscot at chase - Replace two 100CFM exhaust fans - Install (2) each at both restrooms: toilet paper dispenser, soap dispenser, paper dispenser, and (1) s.s. mirror, relocate existing hand dryers -Patch walls and paint rooms Total for restrooms renovation' $20,855.00 We Agree hereby to supply the material(s) specified above at this price: Date of agreement: Total Proposal Amount $23,835.00 Authorized Signature: FW: Dante Fascell Park Revised Quote 12/08/10 FW: Dante Fascell Park Revised Quote 12/08/10 Doug Baker Sent: Wednesday, December 08, 2010 9:55 AM To: cineas, Joanne Importance: High Attachments: DANTE FASCELL PARK IMPROVE -I.pdf (28 KB) Joanne please print with attachment this is an emergency From: Design Build InterAmerican (DBI) [mailto:a.donate @tagdbi.com] Sent: Wednesday, December 08, 2010 9:47 AM To: Doug Baker Subject: Dante Fascell Park Revised Quote 12/08/10 Importance: High Mr Baker, Here is the revised proposal sorry about the delay. Any questions please let me know. Thank you, Regards, Alfonso Donate Estimator Design Build InterAmerican, Inc. The Architects Group, Inc. Architects & General Contractors 8000 NW 7th Street Suite 101 Miami, Florida 33126 Office: 305- 740 -0850 Fax: 305 -740 -0158 Email a.donate@iggdbi.com Visit us at www.tagdbi.corn b', Please consider the environment before printing this e-mail Page 1 of 1 https: / /e- mail .cityofsouthmiami.neVowal ?ae = Item &t= IPM.Note &id= RgAAAAB80dlTmk... 12/6/2010 Oesignstiodinte' erican •- • •ens Item Total Mana ement $ 890.00 Supervision $ 4,670.00 Equipment Rental $ 650.00 Dum ster $ 1,320.00 Permits (by city) $ Cleanup $ 900.00 Labor $ 900.00 Insurance $ 250.00 Demolition $ 1,200.00 Earthwork 1 $ 900.00 Fencing $ 800.00 Sodding $ 500.00 Concrete Cutting $ 800.00 Slabs Finish $ 700.00 Concrete $ 3,500.00 Concrete Pumping $ 400.00 hyOOdt;>NM1, R 'C en $ 3 800.00 EI11ienE5. ,�`.Sn "svi`a$� ,?, �,?; fr' ,,,,, n;. E., SU.,,a i.;": Epoxy Flooring $ Paint 1 $ 1,400.00 Restrooms Accessories to 620.00 Signage $ 1,870.00 �Meohanical .s? ..; Plumbing Service & Distribution $ 5,250.00 Plumbing Fixture $ 1,600.00 Exahaust fans $ 1,200.00 EIe "Wical�, X ut'.sn.�.f' ",,3r";.,x Electrical repairs and new connections Is 2,180.00 Subtotal Y $ : 36,300.00 Overhead $ I'. 7,000.00 Profit z, f. $ x:7,200.00 Architectural and Engineering fans ?. $ 15,500.00 Total Estimate $ '056,000.00 EXCLUSION: - Construction Permit - Impact Fees - Building Department Revision Fees - Survey of Property - Exterior Signs - Furniture - Fire Sprinklers - Roof Penetrations & Roofing Work CONDITIONS: The prices and terms on this quotation are not subject to verbal changes or other agreements unless approved by DBI Principals. Prices are based on costs and conditions existing on date of quotation and are subject to change by DBI before acceptance. Typographical and stenographic errors subject to correction. A service charge of 1.5% per month may be added to amounts, which are pest due. In the event It becomes necessary for DBI to retain an attorney to collect any of the amounts reflected by this contract, then Client agrees to be responsible for all attorney's fees incurred by Dal, inclr any attorney's fees Incurred through appeal. THIS QUOTE VALID FOR 30 DAYS AND IS SUBJECT TO THE ABOVE CONDITIONS ACCEPTED BY PRINT NAME 8000 NW 7th Street, Suite 101, Miami, FL 33126 Ph.: 305440 -0850 Fax: 305440-0155 email: tag- dbi@tagdbi.wm FADBI PROJECTS \01 -00 DBI Old Bids 20WCITY OF SOUTH MIAMODANTE FASCELL PARK IMPROVEMENTS\ESTIMATEIDANTE FASCELL PARK IMPROVEMENTS Rev 12 -08 -1