Loading...
18South Miami 1NAIedca i CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER- OFFICE MEMORANDUM 2001 To: The Honorable Mayor Stoddat4d and Members of the City Commission Via: Hector Mirabile, Ph. Drie City Manager FromMaria E. Stout -Tate, Director Parks & Recreation Department Date: December 7, 2010 ITEM NO. Subiect A Resolution of the Mayor and City Commission of the City of South Miami, Florida authorizing the City Manager to approve the purchase in the amount of $10,000 from Electrical Masters Inc. to continue improvements for Palmer Park replacing the lighting system, drawn from account # 001- 1750 -519 -3450 (Contractual Services) ; providing an effective date. Background The first phase of this capital improvement was approved on August 3, 2010 "Resolution # 152 -10- 13186", in the amount of $8,500, to replace lighting fixtures at Palmer Park. This resolution would provide the ability to fix /replace 46 more light fixtures at Palmer Park. There are approximately 200 children/adults which use this park on a daily basis. The need to replace these light fixtures does not only enhance the ball park, but provide safety through better visibility. Along with the various sports which are housed at this park, baseball season is starting at the end of December, having more participants using the facility in the evenings. With the replacements of the light fixtures, it will improve the safety conditions for the children using this park. Upgrading these fixtures will bring an antiquated lighting system up to standard, which is recommended by the Florida League of Cities; which provide the City of South Miami Parks & Recreation Department with periodic safety inspections. Cost: $10,000 Funding Source: Account # 001 - 1750 -519 -3450 (Contractual Services) Backup Documentation: Proposed Resolution Balance in account: $30,845.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 RESOLUTION NO. A Resolution of the Mayor and City Commission of the City of South Miami, Florida authorizing the City Manager to approve the purchase in the amount of $10,000 from Electrical Masters Inc. to continue improvements for Palmer Park replacing the lighting system, drawn from account # 001 - 1750 -519 -3450 (Contractual Services); providing an effective date. WHEREAS, the city of South Miami had started repairs on the lighting system located at Palmer Park; and, WHEREAS, continuation of this project provides the safety for participants at Palmer Park; and WHEREAS, Electric Masters is the lowest of the three bids; and, WHEREAS, the purchase in the amount of $10,000 from Electrical Masters will improve the safety of participants using Palmer Park. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1. The Mayor and City Commission authorize the City Manager to approve the purchase in the amount of $ 10,000 to continue improvements at Palmer Park, through the vendor, Electrical Masters Inc, drawn from account # 001 - 1750 -519 -3450 (Contractual Services), with an account balance of $30,845.00. Section 2. This resolution shall take effect immediately upon approval. PASSED AND ADOPTED this , day of , 2010. ATTEST: CITY CLERK READ AND APPROVED AS TO FORM: CITY ATTORNEY APPROVED: MAYOR COMMISSION VOTE: Mayor Stoddard: Vice Mayor Newman: Commissioner Beasley: Commissioner Palmer Commissioner Harris: Page 1 of 1 Stout -Tate, Maria From: cineas, joanne Sent: Thursday, November 18, 2010 1:38 PM To: Stout -Tate, Maria; Doug Baker Subject: FW: (no subject) FYI Joanne.. Cineas City of South ,�Viiami Parks & Recreation Department From: AslanF @aol.com [AslanF @aol.com] Sent: Thursday, November 18, 2010 12:32 PM To: cineas, joanne Subject: Re: (no subject) Approved Larry Laurence Feingold P.A. City Attorney of South Miami. City Hall (305) 663 -6340 Beach Office: (305) 538 -1686 Cell: (305) 495 -7887 Fax: (305) 538 -7875 Web: laurencefeingold.com In a message dated 11/17/2010 5:01:05 P.M. Eastern Standard Time, jcineas @cityofsouthmiami.net writes: As per Maria Stout -Tate, please find attached the Resolutions. Thanks, Joanne -%I. Cineas City of South .Warm Parks & Recreation Department 11/22/2010 9 d rJ N r9 m _ O 0 3 m _ F n 0 0 G m _ n 0 p c 0 m N d d d m 0 i a o' w N V M r m 4 M n r p ran o m M N m S n U) m x 12:23 3052255839 R9K INSURANCE #0700 P-001/001 ... .. ....... ...... ................ ....... . .. ...... .... - . . ....... .... .. ....... ELECTRICAL MASTIERS, INC- TODAY'S DATE! JULY %.2010 102I I SW 1� STREET MIAMI, FL 33174 Phone 786.232-7634 Fax 305-225-5639 ELMASTERSWLIVEXOM FOR CITY OF SOUTH MIAMI 4795 SW 75"' AVE MIAMI, FL 33155 JOB NAME a CITY OF SOUTH MIAMI ADDRESS: 4795 SW 75' AVE SOUTH MIAMI, Fl. 33155 Replace Bulb and Ballast 1000 Watt, Metal Halide MATERIAL Bulb Metal Halide Pulse Star metal Halide Ballast $7.00 Fuse $132-50 Price for Hour TOTALDUE THANK YOU FOR YOUR BUSINESS! LANGER � ELECTRIC Sj5RVACE COMPANY SINCE 1939 Page 2 hrojCV Namc; Baseball Facility Palmer Park f @choral Conditions: 1) Langer Electric Service Company shall not In hold liable for errors omissions in designs by others, nor inadequacios of materials and equipment speciflcd ur supplied by others Z) Equipment and material supplied by Langer Electric Service Company arc warranted up to one year from completion date or to the extent that (:he same are warranted by Elie manufacturer. tamps are warranted 90 days, 3) Langer Electric Scrvicc Company shall not be liable for indirect loss or damage 4) Unless included in this proposal, all bonding and /or special insurance requirements are supplied at additional costs 5) If a formal contract is requirad, its conditions must not deviate from this proposal without the permission of l angcr Electric Service Company (;) Anything (verbal or written) expressed or implied elsewhere, which is cohtrary to those condhfons, shall be null and void 7) Due to market conditions oil manorial or items set forth in this contract proposal are subject to price increase through time of contract and subjcct to review every 90 (ninety) days, unless this proposal expressly sta.i:cs that pricing for any such products or items are ihn and fixed 'terms and Conditions: After goods aro delivered and signed for, our responsibility oowcs. Title to ownership ofthis material romains with Ganger Electric Scrvicc Company until bill is paid in full, Them will be additional charges for any returned chock, In the event that Langer oonducts Voliolling, Langer Electric Service Company cannot' be hold responsible for any damage to underground sysrcros (c. g, sprinklers, water pipes, phone, television or eleeuioal cables, ate.) Any costs incurred as a result of nonpayment of invoice including court cost's and attornoy's fees, plus legal rate of interest charged from date of billing, will bo sustained by tho customer. The terms or this contract do not authorize overtime or change orders unrass approved and signed by the general contractor or ov err, Langer Electric Service Company reserves the right to assess the cumulative impact of any changes to its work. Langer Electric Service Company wilt not be responsible for job stoppage or disputes caused by other contractors. The work described in this contract will be installed in a neat workmanlike manner in accordance with,city and county codes. Any work to be parformod not hernia described inoiuding eorrootiom of code vioiations is not part of this proposal and shall be portbrmed on a time and material basis unless otlierWise specie ed. whenever applicable, this contract shall serve as a waiver of notice of intention to claim a lion under the Florida statutes. Either this contract proposal or the AIA Document A401 -1997 is the only acceptable contract. Ali payments shall be progrossive payments during the course of tiajob based en work completed tindtor time ticitets. Payments must be nxadc upon completlon of flit job, This proposal shall be doerned accepted only if signed and rctumcd within five (5) days from the date of contract. After the expiration nfsald five (5) days, the acceptance of Elie proposal shall be optional with Langer Electric Service Company. We thank you for the opportunity to submit this quote, and hope we may have the privilogo of completing this work fir you, f f accepted, please sign one copy of this proposal, noting the terms and conditions on.the back, and return it to our office. This proposal is based upon our entering Into a contract with you in a form that is mutually satisfactory. Permit fees and saics tax, if applicablo, must be added to the above amount. APPROVED AND ACCEPTED Roger P., tango, President Owner or Agent for Owner #EC0000099 Accepted _ day of OFFICES IN DAC)E ^ BS &IARD * PALM BEACH CORPORATE OFFICE: 6600 NW R1stAVCNUE, SUITE i FORT LAUDERDALE, FL 33309 ,^,CM1w.M b NhMYfMHYJ WIMemAUwIM PHONE: (964) 984 -8489 ° FAX: (954) 984.8668 Y .. July 29, 2010 City of South Miami Public Works Department 4795 SW 75 Avenue South Miami, FL 33143 Min; Doug Bolm' Project Name: Sasoball Iracilit'y Palmer Park Estimat:c No t 10 -4,015 Plans; N/A LANGER ELECTRIC SERVICE COMPANY SINCE 1939 CONTRACT PROPOSA.I, pate: Architeef: N/A We are ploased to submit a proposal to perform the oloctriwl work for the above roferenced project in the amount of sT /,M (T me and Materials). This proposal is based "Per Performance of the worst as detailed in the Plans and specif cations listed above using the most practical and economical practices of tha industry with the addition of tho terms and qualifications listed below. The iailowint? worst is iaelvd�ed in this P001122all I) Standard insurance cover ago 2) Breakdown of anitpricoaas per telephone donvursation t 4) 1000 watts ballast t tmul t base, 558 42 each taP: $122.55each ; -» f1'P'rt 1, e; �VJ5e 5) Rol boom ) i0rental •daily(ry,fi1,04R.Cbperday , D:� J 4) 80' boom lift rontal; weakly Oq ;$2,239.00 per day 7) Delivery anti pickup: $420.00 s) I- lourly rate of one mein $65,00 per hour 9) Hourly rate of a two men crew; $120.00 per hour - 10) Can not prico tixanc roplacomant tvithoufknowing mounting system 11) Irpermit is required will be billod separately at cost of the P"mit plus 5250.00 for labor' The fnilowinzMarlc is NOT included In In this aranosnl: 0 / LID`, vj 1) Overtime (Standard worlcweok is Monday — Friday 7:60 ant to 3:30 Pm) Z)' All concrete /asphalt cutting or Patching if needed shall bo by others 3) Any penettationsor scaling ofthe roof shall bebyOthers 4) Hoisting or scaffolding S) Fireproof ng shall be by others 6) Duct detectors or wiring shall be by others 7) Thermostat and control dovices rumishedby Others 8) fainting and touch -up' 9) Surveying and engineeringccrtification 10) All utility and municipality fees, anyspocial permits and regular and overtima hours required to perform the above requircrncnts 1'1) Corrcotions of coda violations for Work not installed by this contractor 12) Repairs to oxistine wiring and /or eicotr•ical systetnsnot specifically included ciscwhore in this proposal Pabiir OFFICES iN DADE ^ QRGWARD ^PALM BEACH ". CORPORATE OFFICE_: 6500 NW 21st AVENUE, SUITE 1 % FORT LAUDERDALE, FL 33309 PHONE: (954) 984.8489 1 FAX: (954) 984.8668 Florida E cting Service, Inc. 1445 SW 21" Avenue, Fort Lauderdale, FL 33312 Phone (954)' 587 -6760 Fax (954) 321 -0355 Doug Baker City of South Miami Parks, Recreation & Maintenance Service Re: Snort Lighting Repair Budget Estimate: June 24, 2010 Email: dbakena citvofsoti hmiami.net In order to establish a base to work from, I have listed our normal per hour pricing for the trucks that would be needed for general repairs and the most expensive material components that may or may not be used. Not included are wire nuts, wire, and fuse holders that may or may not be Wed. It is near impossible to give aprice on repairing items that we have no idea what is wrong until we research the problem. We have also included a per fixture material cost for the change out to new Power Spoffixtures. Florida Electric Contracting Service, Inc. respectfully submits the following prices to provide labor, materials, and equipment to repair the sport lights at The City of South Miami parks: 1) 95' Bucket truck w /operator and electrician $174.90.per hr. 57' Bucket truck w /operator and electrician $129.80 per hr. IOOOW MH ballast $134.04 IOOOW MH lamp $34:68 Fuses: $7.06 New GE Power Spot (integral ballast) I OOOW MH 480V Fixture that also includes lamp, reflector and glass lens: $578.00 (fixture only) Please note, the above prices assume the existing whing to the poles is, in proper working condition. We will connect to the existing wiring. . Upon approval, please forward a purchase order to our office, Please feet free to call me should you have any questions or require further information. Sincerely, ` Richard N Headley II' _Operations Manager Florida Electric Contracting Service, Inc. South Miami iofi sovra�, AC•Ameff aCKY W CITY OF SOUTH MIAMI 1 r V OFFICE OF THE CITY MANAGER Ito axo" INTER- OFFICE MEMORANDUM 2001 To: The Honorable Mayor & Members of the City Commission Via: Randy Witt, City Manager �l From: Fritz Armand, M.E. Public Works & Engineering Department Date: July 29, 2010 Agenda Item No.: Subject: Accepting services for Palmer Park Light Repairs Resolution: A Resolution of the City Commission of the City of South Miami, Florida, accepting and endorsing Palmer Park light repairs to provide safe usage of the Athletic Fields; providing for an effective date. Request: Authorizing the Mayor and City Manager to accept an a Purchase Order request for services for Palmer Park Light Repairs Reason/Need: The request addresses the need for light repairs at Palmer Park. The athletic fields have extensive light damage. Due to the specialized work required and the height of the 75 foot poles, professional services have been requested to provide for public safety, RESOLUTION NO.: 152-10-13186 A Resolution of the City Commission of the City of South Miami, Florida, accepting and endorsing Palmer Park light repairs to provide safe usage of the Athletic Fields; providing for an effective date. WHEREAS, Palmer Park has severe light outages. The repair is specialized work due to the height of the pole being at 75 feet. WHEREAS, the Public Works Department requests to put an open Purchase Order for $8,500 for re- lamping and repairs of Palmer Park Athletic Fields. WHEREAS, three bids have been acquired to expedite the repairs for the public safety of the athletic fields. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA THAT: Section 1: the City Commission authorizes the City Manager to execute a purchase order with Electric Masters, Inc. In an amount of $8,500 for services for Palmer Park Light Repairs. Section 2: This resolution shall be effective immediately upon being approved. PASSED AND ACCEPTED THIS 3rd ATTEST: a",aa.� TY CLERK READ AND APPROVED AS TO FORM CITY ATTORNE DAY OF August 12010 APPROVED MAYOR Commission Vote: Mayor Stoddard Vice Mayor Newman Commissioner Palmer Commissioner Harris Commissioner Beasley 4 -0 Yea Yea Yea out of room Yea