2aDATE: January 20, 20 10 This detailed report will provide you with the necessary information to determine the future of the proposed Murray Park Swimming Facility. In this report you will find a brief history of the project, the funds secured, projected construction cost, the Building and Operations/Projected Revenue figures, the necessary steps and recommendations towards successful project completion, and any challenges that may need to be overcome to complete this project. Since 1973 when Commissioner Spike Gibson brought up the subject, residents have been requesting a pool at Murray Park. It wasn't until multiple drowning incidents, with the most recent occurring approximately 15 years ago, that the project became a priority for the City of South Miami. In 1994, a group of residents formed a development committee who began to survey the entire City of South Miami. As a result of their findings, they prepared a set of plans that encompassed the entire needs of the community with regards to their desired recreational services. Later, after a change of City Commission and Administration, the plans were revised and the pool was deferred. The Gibson-Bethel Community Center was completed in September 2003 and can only be described as a success and wonderful asset to the entire community. Following the completion of the coramunity center project, a master plan was created and a pool feasibility study was conducted for Murray Park, The plan was completed and presented to the City Commission in 2004. At that time, funding for the project was sought and design funds were soon secured. Since 2004, significant amounts • funding have been secured for the purpose of building the swinaning facility. In October 2008 a finri was selected to design the swimming facility. After offering a public workshop, meetings with the Parks & Recreation Board, and extensive meetings with City Staff, the needs of the pool were defined and a design has been completed for the Murray Park Swimming Facility. Today, 100% construction documents are ready and we are now awaiting a final go ahead on the future of the Murray Park Swimming Facility Project. South Miami F I a r i d a Parks & Recreation Department ffil-Amedca 01tv R I NP Y South Miami Community Center 305-668-7232 2001 DATE: January 20, 20 10 This detailed report will provide you with the necessary information to determine the future of the proposed Murray Park Swimming Facility. In this report you will find a brief history of the project, the funds secured, projected construction cost, the Building and Operations/Projected Revenue figures, the necessary steps and recommendations towards successful project completion, and any challenges that may need to be overcome to complete this project. Since 1973 when Commissioner Spike Gibson brought up the subject, residents have been requesting a pool at Murray Park. It wasn't until multiple drowning incidents, with the most recent occurring approximately 15 years ago, that the project became a priority for the City of South Miami. In 1994, a group of residents formed a development committee who began to survey the entire City of South Miami. As a result of their findings, they prepared a set of plans that encompassed the entire needs of the community with regards to their desired recreational services. Later, after a change of City Commission and Administration, the plans were revised and the pool was deferred. The Gibson-Bethel Community Center was completed in September 2003 and can only be described as a success and wonderful asset to the entire community. Following the completion of the coramunity center project, a master plan was created and a pool feasibility study was conducted for Murray Park, The plan was completed and presented to the City Commission in 2004. At that time, funding for the project was sought and design funds were soon secured. Since 2004, significant amounts • funding have been secured for the purpose of building the swinaning facility. In October 2008 a finri was selected to design the swimming facility. After offering a public workshop, meetings with the Parks & Recreation Board, and extensive meetings with City Staff, the needs of the pool were defined and a design has been completed for the Murray Park Swimming Facility. Today, 100% construction documents are ready and we are now awaiting a final go ahead on the future of the Murray Park Swimming Facility Project. Funds Secured As of January 15, 2010, we have secured $1,166,911 towards the construction of Murray Park Swimming Pool and $326,000 for the design of the facility for a total of $1,492,911. Below is a breakdown of the funding amounts, sources and any purposed use of the funds. Amount Source Purpose $ 756,911 County DHCD Construction $ 50,000 SMCRA Construction $ 160,000 District 7 Construction $ 200,000 County DHCD Construction $ 276,000 County DHCD Design $ 50,000 SMCRA Design Estimated Building Costs ➢ Maximum Design Costs Per Contract - $193,000 ➢ Design Costs + Construction of Base design (includes pool and 1St floor) - $ 193,000 + $1,162,264 = $ 193559264 ➢ Design Costs + Construction of Base design + Additive Alternate # 1 (base + open 2nd floor) - $ 193,000 + $ 1,2379414 = $ 19430,414 ➢ Design Costs + Construction of Base design + Additive Alternate # 2 (base + completed 2nd floor) - $ 1939000 + $ 1,4809649 = $ 196739649 Please note that these are estimates and we will work closely with the project engineering firm to reduce these costs. Estimated Operating/Revenue Figures — (Projected to begin FY 11 -12) Projected Annual Operating Expenses $ 341,700 Projected Annual Revenue - $ 54,568 Annual Opinion of Facility Operations ($287,131) See attached chart for details. Project Challenges ➢ The City of South Miami is required to provide Water and Sewer connections to the proposed swimming pool location. A 6 inch water main exists on SW 68th Street but the size is insufficient and connection to it is not allowed. A new 12 inch water main ($140,000) is required by MDWASD in order to close the water main loop. Fire code requires the increase of the water main in order to achieve 3,000 gallons per minute fire flow. The City will be required to upgrade the water main. In addition the nearby sewer pump station is inadequate and needs capacity upgrades. MDWASD will perform the necessary upgrades to the pump station in 2014, which is too long a time frame for our projected completion. o As a result of the information above, we will be presenting the case to the DERM Environmental Quality Control Board (EQCB). The case will request a variance to allow an on -site septic tank that would extend into the existing ball field at Murray Park since septic tanks are not allowed under parking. This is the least costly solution estimated to cost $70,000. The City Manager has commenced talks with the CRA in order to have a portion of their available funds to be used for both the water and sewer infrastructure projects. Pending Issues/Related Information ➢ We have reminded OTS that "Green Building" and LEED certification are part of their scope of work and were committed in their presentation to the City Commission. The cost of construction to achieve LEED certification is not included in the present construction estimates. It is recommended that we finalize the additional cost estimate and that CRA available funds be used for this purpose as well. ➢ Annual operating costs for the pool will be approximately $287,000 net beginning in FY 2011/12. We believe that sponsorships from FPL and other sources could possibly reduce this to $250,000 and this Administration would work diligently to achieve this goal. The strategy would be to budget a portion of this money in FY 2010/11 to cushion the full amount needed in FY 2011 /12 and to develop a program that will utilize CRA funds for approximately half of the need in FY 2011/12 with the CRA funding being reduced gradually over the next five fiscal years. ➢ Extensive Marketing Programs are needed. Using this facility during non -peak times and effective programming /scheduling will offer another much needed opportunity to offset the annual operating costs. The opportunities to work with the School Board and the University of Miami will be fully explored. It is also critical to ensure that the pool be viewed as an asset and a source of recreation for the entire community and the marketing program will be geared to achieve that goal. Projected Schedule pending your decision ➢ 1/26/10 — Approval of moving this project forward as recommended. ➢ 2/10 — Submit WASD, DERM, and Department of Health Permits (may take up to 6 -8 months) ➢ 7/10 — Final Bid preparation (to be done while final permits and approvals are attained) ➢ 8/10 — Bid period begins — 60 days ➢ 10 /10 — Review and Negotiation of Construction Award. ➢ 10/15110 - Contractor Notice to Proceed and Pre - Construction Meeting /Groundbreaking ➢ 9/15/11— Final Project Completion Recommended Course of Action ➢ Give the "go ahead" decision to complete biddable documents, receive bids, and start the permitting process. A final decision would be made by the City Commission concerning the additive alternates and the LEED /Green costs when the prices are in. ➢ Authorize the Acting City Manager to continue meeting with DERM and WASD to negotiate the terms and expedite the work of connectivity for water supply and sewage disposal. ➢ Authorize the Acting City Manager to continue negotiating with the CRA to aid with the cost of the septic tank at a cost $70,000, the water pipe extension at a cost of $ 140,000, the LEED /Green Costs, and the declining annual financial program commitment towards this project. It is expected that a detailed item will be brought to the CRA board during March 2010 to define the total CRA support for this project. Conclusion It is important to acknowledge the extraordinary effort by County Commissioner Gimenez and the Miami Dade County DHCD for providing nearly 95 percent of the capital funds for this project. It is also important to remind the City Commission that the USDHUD is putting extreme pressure on the County to get these funds to work which means that a construction contract has been signed. The implications of a "no -go" decision is that we may have to pay back the expended portion of the design costs which will be approximately $175,000 and our credibility for future project funding will be greatly diminished at best. Therefore, within the limits of the steps defined above, your "go for it" decision is strongly recommended. Specifically, I want to thank Cesar Garcia, Rudy De la Torre, Carol Aubrun, and Tom Vageline for their great efforts to bring us to this decision making point after nearly 40 years of discussion and unmet expectations from the community. Funding Sources for Murray Park Pool 10 11 Totals $ 326,000.00 $ - Construction Construction Construction Funding Source Funding Amount Funds Remaining 1 Date Funds Exr 24 25 ITotals $ 1,166,911.00 $ - December 30, 2009 Planning genesis'/Murray Park Pool /Murray Park Pool Funding 12 -30 -2009 A B C D _ .... .. .. ... ...... E F 1 Funding Design Design Design 2 Funding Source Secured Funding Amount Funds Remaining Date Funds Expire 3 4 County DHCD Yes $ 276,000.00 6/30/2010 5 SMCRA $ 50,000.00 10 11 Totals $ 326,000.00 $ - Construction Construction Construction Funding Source Funding Amount Funds Remaining 1 Date Funds Exr 24 25 ITotals $ 1,166,911.00 $ - December 30, 2009 Planning genesis'/Murray Park Pool /Murray Park Pool Funding 12 -30 -2009 v� �nm 3n �rm r a ;s+ i to IN rd r 116 0 YW"q 1 p�y�p�o�ai �wFa� i 0 0 Nt q�yy V 4 �xP 0 e 7mp , 0 0 e 0 Q 1 } Vd LP o C N 0 h r P tAr CH o o 'ar°. y� (V 'd 'd r-6 Yom{ 2 Nb.J pp(Is � !�1 (pU p(�U Vp�a t�^4 pWqi t p{ yy } yV�.gqd W+^1 Y"{ Ytl' va pprr,� t�9 fi 5 `0 bD ppq� }}� hY 4/ �l 4Y rd r 116 0 YW"q 1 p�y�p�o�ai �wFa� i 0 0 Nt q�yy V 4 �xP 0 e 7mp , 0 0 e 0 Q 1 } Vd ( o C CJ t,4 CH o o 'ar°. (V 'd 'd r-6 rd r 116 0 YW"q 1 p�y�p�o�ai �wFa� i 0 0 Nt q�yy V 4 �xP 0 e 7mp , 0 0 e