Loading...
Res No 023-14-14117RESOLUTION NO.: __ 2 _3 -_1_4_-_1_4_1_1 7 A Resolution authorizing the City Manager to enter into a contract with Perrin International Services, Inc. for a contract price not to exceed $21,278 for the SW 60 th Street Sidewalk Project, to be charged to People's Transportation Plan account number 124-1730-541-3450. WHEREAS, the Mayor and City Commission wishes to construct a new sidewalk along SW 60 th Street, and WHEREAS, pursuant to a competitive selection process, it was determined that Perrin International Services, Inc. submitted a proposal in the amount of $21,278 that was the most comprehensive and cost effective in its construction approach; and WHEREAS, the work shall consist of engineering and construction services, including materials, a survey, design layout for a new sidewalk along SW 60th Street and SW 65th Avenue; and WHEREAS, the total expenditure is not to exceed $21,278; and WHEREAS, the Mayor and City Commission desire to authorize the City Manager to enter into a contract with Perrin International Services, Inc. for the SW 60 th Street Sidewalk Project for an total amount not to exceed $21,278. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA THAT: Section 1: The City Manager is authorized to enter into a contract with Perrin International Services, Inc. for the SW 60th Street Sidewalk Project for an amount not to exceed $21,278. Section 2: The expenditure shall be charged to the People's Transportation Plan account number 124-1730-541-3450 which has a balance of $140,000 before this request was made. Section 3: If any section clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining portions of this resolution. Section 4. This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED this 18th day of February ,2014. ATTEST: APPROVED: IUflJJdiJ MAYOR COMMISSION VOTE: 5-0 Mayor Stoddard Yea Vice Mayor Harris Yea Commissioner Welsh Yea Commissioner Liebman Yea Commissioner Edmond Yea TO: FROM: DATE: City of South Miami PUBLIC WORKS & ENGINEERING DEPARTMENT 4795 SW 75 th Avenue Miami, FL 33 155 Tel. (305) 663-6350 Fax (305) 668-7208 Steven Alexander, City Manager , Kelly Barket, Jr., Chief Superintendent of Public Works February 18, 20 14 South Miami bOx' Alf.Amer!caCIty ~'"P 2001 Resolution: A Resolution authorizing the City Manager to enter into a contract with Perrin International Services, Inc. for a contract price not to exceed $21,278.00 for the SW 60th Street Sidewalk Project, to be charged to People's Transportation Plan account number 124-1730-541-3450. Background: This project will consist of all engineering and construction services. Materials, survey and design layout for a sidewalk network are included in the scope. The construction of approximately 850 LF of 5' wide concrete sidewalk will be along the north right of way of SW 60 th Street, from SW 67th Avenue to SW 65th Avenue and along the west right of way of SW 65 th Avenue, from SW 60th Street up to SW 59 th Street. This will connect and complete the sidewalk loop around the block. Expense: Account: Currently, no sidewalk exists on either side of the SW 60th Street, between SW 67th Avenue and SW 65 th Avenue. This is a high foot traffic area, due to the fact that South Miami Middle School is located just west of 67th Avenue, with a main entrance facing SW 60 th Street. Apart from being within a school zone, the Girl Scout's South Miami Little House (6609 SW 60 th Street) is also located on SW 60th Street, between SW 67th Avenue and SW 65 th Avenue. The City of South Miami received three (3) proposals for the project, shown below: Perrin International Services, Inc Maggolc, Inc. Recreational Design & Construction $21,278.00 $37.200.00 $47,588.03 The proposals were reviewed and it was determined that Perrin International Services, Inc is the lowest, responsive and responsible bidder for the SW 60th Street Sidewalk Project. Amount not to exceed $21,278.00 The expenditure shall be charged to the People's Transportation Plan account number 124- 1730-541-3450, which has a balance of $140,000. Recommendation: Public Works recommends the new sidewalk to provide safe pedestrian walkways; primarily for our residents. students and parents walking to/from South Miami Middle School. Attachments: Resolution Proposals Scope of Work RECREATIONAL DESIGN & CONSTRUCTION. INC. 3990 NORTH POWER LINE ROAO FORT LAUOEROALE, FL 33309 964 .566 Il 3865 FAX: 954.566.3335 EMAIL: Info@recreationaldesign.com January 29,2014 City of South Miami City Manager 4795 S,W. 75th Avenue South Miami, FL 33135 Attn: Grizel Martinez. E.I Re: New Sidewalk along SW 60 Street and SW 65 Avenue Dear Mr. Martinez, Recreational Design & Construction, Inc, (ROC) is pleased to submit this proposal to include design and engineering services, general conditions, supervision, labor and materials for the design, permitting and construction of the proposed concrete sidewalk along SW 60 Street and SW 65 Avenue in the City of South Miami FL. Our scope of work and pricing is in accordance with the attached site plan and proposed location as depicted by the City Staff in the email dated December 13 2013. The priCing for the complete scope of work and services is as follows: Design Fees and Services • ROC shall provide a special purpose survey to include all the visible existing conditions such as hardscape and landscape features, overhead utilities, drop curbs, traffic stripping existing fencing, building fayades in relevant proximity to the project and information required for the design of the proposed improvements within the project limits. Survey encroachment up to 5' ft. maximum within the private property as required. • ROC shall provide paving and grading civil plans necessary to permit and construct the proposed sidewalks. Design plans and calculations for drainage improvements not included. • ROC shall provide landscape and tree removal plans necessary to permit and construct the proposed sidewalks. • Sidewalk design as per City of South Miami Standards • ROC shall be responsible for obtaining the permits from the City of South Miami Public Works Department and other applicable permits as required for the work within the Boundaries of the Work. • Permitting fees will be paid by the Owner. General Conditions • The general condition costs include all project management, supervision, mobilization, construction survey, temporary utilities, and facilities, temporary toilets, temporary fencing/gates and dumpsters. • ROC shall provide construction stakeout as necessary to complete the proposed project. Bond and Insurances • Provide a Design/ Build payment and performance bond once the permits are in place. CG·CA21702 CPC1456757 EC13001820 Site Work • A temporary silt fence will be installed around the area being developed to prevent soil eiOsion & airborne dust generation. • The existing signs shall be removed and salvaged for reinstallation after the new work is completed. . • The eXisting fence shall be removed and salvaged ·for the future reinstallation after the completion of the new sidewalk. . • Clearing and prepping the areas for construction with-in the limits of work shall be performed as part of this scope of work. • Debris resulting from the clearing and grubbing shall be disposed of at an off-site . location in accordance with applicable codes & statutes. • The eXisting tree and landscaping within the limits of work shall be removed for the construction of the proposed sidewalks. • The area shall be cut, shaped and graded to provide the required elevation to match the portions of the existing sidewalks. • A new 5'-0" wide concrete sidewalk will be constructed to along SW 60 Street and SW 65 Avenue to meet City of South Miami Standards. • Reinstallation of signage . • Reinstallation of chain~link fencing behind new sidewalk • Provide As-built drawings • Clean up Items by Owner • Fees, removal and relocation of the existing utility poles • Fees, removal and relocation of existing water meter and underground utilities. • Relocation of any utility/telephone poles, cables and or utility boxes • Plan ReView Fees, Permit Fees and Impact Fees Exclusions • . Clearing of the two (2) existing drainage structures: Refer to Alternate pricing • Clearing and lamping of existing drainage system • Construction of new driveway to the existing residences. • . Removal and disposal of unsuitable materials • Geotechnical testing, underground surveying, environmental services The total price forthe above scope of work and services shall be $47,588.03 (Forty Seven Thousand Five Hundred Eighty Eight 3/100 Dollars) Alternate: • To provide labor and equipment for the clearing and removal of the debris from the two existing manholes on 60th street and 65 Avenue. Add $ 3,000.00 If you have any questions, please feel free to contact me at (954) 566-3885. We look forward to working with you and having this project completed in a timely manner. Sincerely, Recreational Design & Construction, Inc. ~ .. Ariel Guitian ~ Senior Project Manager 2 Murray Park Contractor: Recreational Design &Construction Sheet 1 -of -1 Dato : 1-29-14 I New Sidewalks Along SW 60 Street I A.ITEM B. ITEM DESCRIPTION C.QTY D. UNIT E. LABOR I F. MATERIAL G,UNIT PRICE # TOTALUNE NO. * ! (Includinll Equipment (E.1 + F.1) ITEM PRICE 1. Unit Cost 2. Total 1, Unit Cost 2, Total (E.2 + F.2) Design Foos (E.1 X C) (F,1 XC) - Specific Survey Service 1 Less $ 3,000.00 $ 3,000,00 Drawings and Design Fees 1 Ls $ 2,500.00 $ 2,500,00 Construction Post Services! Asbuilts 1 Ls $ 1,500,00 $ 1,500.00 Landscape Drawings 1 Ls $ 2,000,00 $ 2,000,00 - Genoral Conditions ite Supervision 1 weeks $ 1,900.00 $ 1,900,00 roject Manager 1/2 1 weeks $ 1,960.00 $ 1,960.00 ravel & Truck Site Superintendent 2 weeks $ 300.00 $ 600,00 onstruction Surveying 1 Sub $ 1,000.00 $ 1,000,00 vlOT & Sidewalk MOT 1 Sub $ 800,00 $ 800.00 emporary Fence Mthly 2 mths $ 475.00 $ 950.00 arricades and Silt Field Maintainace 1 mths $ 300.00 $ 300.00 aily Cleaning 30 mhs $ 12.50 $ 375.00 holographs 2 mas $ 135.00 $ 270.00 umpsters 1!pulls $ 350.00 $ 350.00 Testing and Densities 1 Ls $ 500.00 $ 500.00 Demolition and Removals Demolition and Removals 100 nihs $ 23.50 $ 2,350.00 Tree Removals Tree Removal 1 Ls $ 1,500.00 $ 1,500.00 Tree Relocation 1 Ls $ 1.000.00 $ 1,000.00 $ - Earthwork and Grading $ - Earthwork and Grading 1500 SF $ 2.00 $ 3,000.00 'Sub Base Works 125 Tons $ 25.00 $ 3,125.00 $ · 1--Cone Sidewalks $ · ~"-Concrete Sidewalks 4000 SF $ 3.00 $ 12,000.00 $ · $ · $ - $ ESTIMATE SUB TOTAL $ 40,980.00 Sub Total Overhead 7.00% $ 2,868.60 Fee 8.00% $ 3,278.40 Bond 1.13% $ 461.03 Prepared By: Limreal.Blanc GENERAL CONDITIONS GRAND TOTAL $ 47,588.03 Title: ~nioLEstimalo[ .. ------. Signature ----Date: l-Z1. t <::t New Sidewalks along SW GO Sireol Revised Modified 1·29·14 From: Martinez, Grizel Sent: Monday, December 02, 2013 9:51 AM To: 'gperry@perrintl.com'; 'Greg Perry' Subject: Sidewalk on SW 60th ST Good Morning Greg, The City is thinking about adding sidewalk to SW 60th Street, from SW 67 th AVE to SW 65th AVE. can you provide a quote for a survey and plan to identify a location for a new sidewalk, as well as any interfering utilities or trees? Thank you, Grizel Martinez, E.I. GMartinez@SouthMiamiFL.gov Engineering & Construction Division City of South Miami 4795 SW 75 Avenue Miami, FI 33155 1 Martinez. Grizel From: Martinez, Grizel Sent: To: Friday, December 20,201310:31 AM 'Mario Gonzalez' Subject: Attachments: Good Morning Mario, FW: Sidewalk on SW 60th ST SW60ST +Sidewalk.pdf The City desires to add sidewalk to SW 60th Street, from SW 6ih AVE to SW 65 th AVE and on SW 65 th AVE from 60th ST to 59 th ST. Can you provide a quote for a survey/drawings to identify the location for a new sidewalk, as well as any interfering utilities or trees, and for construction of the sidewalk? Scope: • Survey and design layout for sidewalk network • Clear & Grub. Construct 5' wide concrete sidewalk along north side of SW 60 St and along west side of SW 65 Ave up to 59 Street (4" thick 3000 P.S.1. concrete at 28 days) Thank you and Merry Christmas! Grizel Martinez, E.I. GMartinez@SouthMiamiFL.gov Engineering & Construction Division City of South Miami . 4795 SW 75 Avenue Miami, FI 33155 1 Martinez, Grizel From: Martinez, Grizel Sent: To: Friday, December 13, 2013 11 :03 AM 'Ariel Guitian' Subject: Attachments: Good Morning, Sidewalk on SW 60th ST SW60ST +Sidewalk.pdf The City desires to add sidewalk to SW 60th Street, from SW 67th AVE to SW 65th AVE and on SW 65 th AVE from 60th ST to 59th ST. Can you provide a quote for a survey/drawings to identify the location for a new sidewalk, as well as any interfering utilities or trees, and for construction of the sidewalk? Scope: • Survey and design layout for sidewalk network • Clear & Grub. Construct 5' wide concrete sidewalk along north side of SW 60 St and along west side of SW 65 Ave up to 59 Street (4" thick 3000 P.S.I. concrete at 28 days) Thank you, Grizel Martinez, E.I. GMartinez@SouthMiamiFLgov Engineering & Construction Division City of South Miami 4795 SW 75 Avenue Miami, FI 33155 1 INTERNATIONAL SERVICES, INC. CGC1521088 CONSTRUCTION CONTRACT PROPOSAL CLIENT: City of South Miami 6130 Sunset Drive FOR ATTN: Grizel Martinez, E.!. 12491 SW 134TH CT, #20 Miami, Florida 33186 Ph: 786-251-9291 Fax: 305-378-8995 Email: gperry@perrint!.com 29-Jan-2014 1IIIIIIIIII~ _______ 1_11_0_2 ______ ~ PROJECT NAME/LOCATION: SW 60th Street Sidewalk from Sw 67 to 65 Ave Design/Build for Sidewalk Improvements DESCRIPTION UNIT QTY. UNIT PRICE EXTENDED PRICE DESIGN / BUILD SERVICES -North R/W of SW 60 St from SW 67 Ave to SW 65 Ave; West R/W of SW 65 Ave from SW 60 St to SW 59 St Survey and design layout for sidewalk network. Clear & Grub. Construct approximately 850 LF of 5' wide concrete sidewalk along north side of SW 60 St and along west side of SW 65 Ave up to 59 Street (4" thick 3000 P.5.I. concrete at 28 days) NOTE: The proposal does not include 1. Removal or replacement of unsuitable or contaminated materials. LS LS 2. Pavement Marking and Signange, fence repair, tree or utility relocation 3. Misc. Permit Fees and any unknown or unforseen conditions. Any additional work will be performed/invoiced as a change order to the contract. Prices are valid for 60 days. Proposal must be signed and faxed or emailed ~~iortocZ~:2/ / / / Date Print Name: 12.i'e-c.rJo A. A 1'" Ie., 1 $3,500.00 $3,500.00 1 $17,778.00 $17,778.00 SUBTOTAL $21,278.00 TOTAL $21,278.00 ~--------~~--~