Loading...
Res No 012-14-14106RESOLUTION NO.: 12-14-14106 A Resolution authorizing the City Manager to enter into a contract with Maggolc Inc. for a contract price not to exceed $13,742.50 for the SW 73 rd Street Sidewalk Project. WHEREAS, the Mayor and City Commission wishes to construct a new sidewalk along SW 73 rd Street, and WHEREAS, pursuant to a competitive selection process, it was determined that Maggolc, Inc. submitted a proposal in the amount of $11,950 that was the most comprehensive and cost effective in its construction approach; and WHEREAS, the City desires to provide a 15% contingency over the proposal amount of $11,950 for unknown factors that may arise during the work, for an amount of not to exceed $1,792.50; and WHEREAS, the total expenditure, including the contingency amount, is not to exceed $13,742.50; and WHEREAS, the Mayor and City Commission desire to authorize the City Manager to enter into a contract with Maggolc, Inc. for the SW 73rd Street Sidewalk Project for an total amount not to exceed $13,742.50. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA THAT: Section 1: The City Manager is authorized to enter into a contract with Maggolc, Inc. for the SW 73rd Street Sidewalk Project for an amount not to exceed $13,742.50. Section 2: The expenditure shall be charged to the People's Transportation Plan account number 124-1730-541-3450 which has a balance of $140,000 before this request was made. Section 3: If any section clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining portions of this resolution. Section 3. This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED this 4 th day of February ,2014. ATTEST: CITY ~KI Dollt»I- COMMISSION VOTE: 5-0 Mayor Stoddard Yea Vice Mayor Liebman Yea Commissioner Newman Yea Commissioner Harris Yea Commissioner Welsh Yea TO: FROM: DATE: City of South Miami PUBLIC WORKS & ENGINEERING DEPARTMENT 4795 SW 75th Avenue Miami, FL 33155 Tel. (305) 663-6350 Fax (305) 668-7208 Steven Alexander, City Manager Kelly Barket, Jr., Chief Superintendent of Public Works February 4, 2014 2001 Resolution: A Resolution authorizing the City Manager to enter into a contract with Maggolc Inc. for a contract price not to exceed $13,742.50 for the SW 73rd Street Sidewalk Project. Background: The scope of this project includes widening a section of sidewalk on the North side of SW 73 rd Street (between 58 th Avenue and 58th Court), installing a new inlet grate, connected to the existing catch basin, curb and gutter and change the existing grate to a manhole cover. Expense: Account: Attachments: The widened sidewalk will allow for outdoor seating and ease of pedestrian traffic. The scope includes extending the sidewalk to take up about 3 parking spaces. The City of South Miami received three (3) proposals for the project, shown below: Maggolc, Inc. RP Utility & Excavation, Corp Perrin International Services, Inc $11,950 $12,250 $14,730 The proposals were reviewed and it was determined that Maggolc Inc. is the lowest, responsive and responsible bidder for the SW 73rd Street Sidewalk Project. Due to the nature of the work, there may be unknown factors that may arise. To account for this, a 15% contingency over the proposal amount of $11,950 is requested. The contingency amount shall not exceed $1,792.50. The total possible expenditure, including the contingency amount, is not to exceed $13,742.50. Purchase Order amount not to exceed $13,742.50. The expenditure shall be charged to the People's Transportation Plan account number 124-1730-541-3450, which has a balance of $140,000. Proposals Design/ Site Plan January 28,2014 To: Grizel Martinez, _LC~. ENGINEERING CONTRACTOR -L1C: E·251302 11020 SW 55 ST., MIAMI, FL 33165 PHONE: 786-291-2949 FAX: 786-472·8831 maggolc@yahoo.com PROPOSAL Public Works and Engineering Department City of South Miami 4795 SW 75th Avenue Miami, Florida 33155 Tel: (305) 403"2072 Fax: (305) 668"7208 Proposal for Widen a Section of Sidewalk and New Inlet, on the North Side of SW 73 Street Proposal Includes: -MOT, Mobilization. -Remove existing asphalt and existing curb & gutter. -Cap existing drainage structure and convert in Manhole. -New concrete curb & gutter -New concrete sidewalk -New curb Inlet and connection with existing structure, using solid pipe diameter 15" -Clean up and wash the job site LS Price: $ 11,950.00 Martinez. Grizel From: Sent: To: Subject: Hi Grizel, Mario Gonzalez [maggolc@yahoo.com] Monday, January 27, 2014 11 :25 AM Martinez, Grizel Re: Sidewalk Widening on 73rd Street The revised price proposal with the addition of one Curb Inlet, solid pipe connection, core and tie with existing structure and convert it top in Manhole is: $11,950.00 Sincerely, Mario Gonzalez Maggolc Inc. 11020SW55ST Miami FL 33165 Phone:786 291 2949 Fax: 7864728831 e-mail:maggolc@yahoo.com On Wednesday, January 22,201411:19 AM, "Martinez, Grizel" <GMartinez@southmiamifl.gov>wrote: Hi Mario, apologize for continuing to change the scope, but can you provide a revised proposal to add a new grate, connected to the existing catch basin. Please refer to the drawing. Grizel Martinez, E.!. GMartinez@SouthMiamiFl.gov Engineering & Construction Division City of South Miami 4795 SW 75 Avenue Miami, FI 33155 From: Mario Gonzalez [mailto:maggolc@yahoo.com] Sent: Thursday, January 02, 2014 8:31 AM To: Martinez, Grizel Subject: Re: Sidewalk Widening on 73rd Street Hi Grizel, The revised price proposal is $ 6,600.00 Thank You, Mario Gonzalez Maggolc Inc. 1-ro20 SW 55 ST Miami FL 33165 Phone:786 291 2949 Fax: 786 472 8831 RP Utility & Excavation,corp PROPOSAL Your Company Slogan 1/28/2014 PO BOX 941286 MIAMI,FL 33194 Sidewalk widening on 73 rd street Ph: 786 506 4998 Fx:786 228 4867 E-mail: rputilitiesexcavation@hotmail.com Grizel Martinez City of south miami 6130 sunset drive miami,fl33143 Ph: 305 403 2078 E-mail: Gmartinez@southMiamiFL.gov DESCRIPTION Demolition of old curb and gutter, remove asphalt with disposal of both. Mill & resurface Installation of new curb and gutter and new sidewalk. replace manhole cover ,HOPE pi pi connection to existing structure and new drop inlet TOTAL This price include labor,equipment and material. If you have any questions concerning this proposal, contact Name, Phone Number, E-mail THANK YOU FOR YOUR BUSINESS! AMOUNT 12,250.00 $ 12,250.00 P NTERNATIONAL' SERVICES, INC. C6C1521088 12491 SW 134TH CT, #20 Miami, Florida 33186 Ph: 786-251-9291 Fax: 305-378-8995 Email: gperry@perrintl.com CONSTRUCTION CONTRACT PROPOSAL 28-Jao-2014 FOR ~ ________ 1_1_1_0_3 ______ -A CLIENT: City of South Miami 6130 Sunset Drive ATTN: Grizel Martinez, £.l. PROJECT NAME/LOCATION: SW 73 Street Sidewalk Sidewalk ExpanSion/parking Reduction West of SW S8 Ave 'DESCRIPTION UNIT QTV. UNIT PRICE EXTENDED PRICE Constructlan Services for the increase in sidewalk area along the north side of SW 73rd Street (west oj SW 58 Ave) in accordance wTth attached .ketch (55 SY) Concrete Curb and Sidewalk Construction including demo, asphalt pavement and pavement marking restciration. Drop inlet construction and connections inc/uding existing inlet top replacement to manhole cover or ADA 'type grate in new sidewalk. Incl. Pipe and connections Mobilization and MOT NOTE: The proposal does not include 1. Removal or replacement of unSUitable or contaminated materials. 2. Utility relocation 3. Misc. Permit Fees and any unknown or unforseen conditions. LS LS LS Any additional work will be performed/invoiced as a change order to the contract. Prices are valid for 60 days. Proposal must be signed and faxed or emailed ~"_ Date 1 $8,780.00 $8,780.00 1 $5,250.00 $5,250.00 1 $700.00 $700.00 SUBTOTAL $14,730.00 TOTAL 1 I 1 I I I 1 I 1 I 1 I . 1 . ,. ~:~ ":;3 1 ", -'. c ro 0.. <D :!: (f) Menendez. Maria M. From: Menendez, Maria M. Sent: To: Thursday, February 27,201410:24 AM Ricardo Ayala Cc: Subject: Payne, Nkenga; Martinez, Grizel; Kelly 8arket; Pepe, Thomas F.; Steven J. Alexander RE: SW 73rd Street signed resolution Kelly and Ricardo, we have a problem with this resolution which refers to "entering into a contract". Please check with the attorney ifthe inconsistency in language is acceptable to him. Maria From: Ricardo Ayala Sent: Wednesday, February 26,20144:48 PM To: Menendez, Maria M. Cc: Payne, Nkenga; Martinez, Grizel; Kelly Barket Subject: SW 73rd Street signed resolution Good afternoon Maria, please let me know if everything is ok. I need the copy ofthe signed resolution for SW 73 rd Street to expedite the PO ASAP. Thanks, Ricardo A. Ayala, P .E. City of South Miami Capital Improvement Project Manager Public Works and Engineering Department Email: RAyala@SouthMiamiFL.gov Main: (305) 403-2063 Fax: (305) 668-7208 Direct: (305) 403-2072 4795 SW 75 Avenue Miami, FL 33155 From: Ricardo Ayala Sent: Wednesday, February 26,2014 10:14 AM To: Menendez, Maria M. Cc: Payne, Nkenga; Martinez, Grizel; Kelly Barket Subject: Question regards to contract within resolutions. Good morning Maria, Nikki stated that the resolution have not being executed due to pending on contract documents. However this type of projects do not require a contact document per say. Please refer to the signed proposals within the packages as the Contract Document. Attached please find an email sent to Nikki requesting the Reso's. Please contact me if you have any questions or comments . Thanks, Ricardo A. Ayala, P.E. 1 City of South Miami Capital Improvement Project Manager Public Works and Engineering Department Email : RAyala@SouthMiamiFL.gov Main : (305) 403-2063 Fax: (305) 668-7208 Direct: (305) 403-2072 4795 SW 75 Avenue Miami, FL 33155 2