Loading...
Res No 113-10-13147Resolution NO. 113-10-13147 A Resolution of the Mayor and City Commission of the City of South Miami, Florida, authorizing the Acting City Manager to issue a Purchase Order to T.Y.Lin International I HJ Ross to provide design engineering and construction documents for the construction of two ARRA funded Bus Shelters at Sunset Drive & 67 Avenue and Sunset Drive East of SW 61 Avenue in the amount of $9,800 to be charged to Public Works Professional Services Account Number 001- 1790 -519- 3100; providing for an effective date. Whereas, On November 3, 2009 the Mayor and City Commission adopted Resolution No: 181 -09- 12990, authorizing the Acting City Manager to execute an interlocal agreement with Miami -Dade County Transit for federal funding pass - through arrangements with the American Recovery and Reinvestment Act (ARRA) of 2009 Federal Transit (FTA 5307) for the installation of two bus shelters on Sunset Drive in the amount of $112,431.84; and Whereas, Miami -Dade County Transit requires the City of South Miami to provide signed and sealed construction documents ready for permitting and procurement process; and Whereas, the expenditure for design engineering and construction documents was included in the original request for ARRA funds and will be reimbursed to the City of South Miami as long as the total expenditures for design engineering and construction of the two shelters do not exceed $106,810.25; and Whereas, the expenditure should be charged to Public Works Professional Services Account Number 001- 1790 -519 -3100, which has an account balance of $32,800 before this request. Now, therefore, be it resolved by the Mayor and City Commission of the City of South Miami, Florida that: Section 1. The Mayor and City Commission authorize the Acting City Manager to issue a Purchase Order to T.Y.Lin International I HJ Ross to provide engineering and construction documents for the construction of two ARRA funded Bus Shelters at Sunset Drive & 67 Avenue and Sunset Drive East of SW 61 Avenue in the amount of $9,800 to be charged to Public Works Professional Services Account Number 001 - 1790 -519 -3100; providing for an effective date. Section 2. This Resolution shall take effect upon adoption. Passed and adopted this 18 day of May 220 10. t: J Appr vets: / / /'-d✓ 4/� ) CTCy Clerk Mayor Read and approved as to form Commission Vote: 4-0 and sufficiency: Mayor Stoddard: yea ' Vice Mayor Newman: Yea Commissioner Palmer: Yea Commissioner Beasley: absent Commissioner Harris: yea CITY ATTORNEY So orb South Miami 04 Qi� ` $ CITY OF SOUTH MIAMI 1 cat °" ° ' OFFICE OF THE CITY MANAGER �, Fez, `°ft`°p INTER- OFFICt MEMORANDUM To: The Honorable Mayor & Members of the City Commission From: Rodolfo de la Torre, Acting Public Works Director Via: Buford R. "Randy" Witt, Acting City Manager r' a, �7 /2tel u Date: May 18, 2010 Agenda Item No.: 1 Subject: ARRA Bus Shelters Resolution: A Resolution of the Mayor and City Commission of the City of South Miami, Florida, authorizing the Acting City Manager to issue a Purchase Order to T.Y.Lin International I HJ Ross to provide design engineering and construction documents for the construction of two ARRA funded Bus Shelters at Sunset Drive & 67 Avenue and Sunset Drive East of SW 61 Avenue in the amount of $9,800 to be charged to Public Works Professional Services Account Number 001 - 1790 -519 -3100; providing for an effective date. Request: Authorizing the Acting City Manager to issue a Purchase Order to T.Y.Lin International ( HJ Ross to provide design engineering and construction documents for the construction of two ARRA funded Bus Shelters at Sunset Drive in the amount of $9,800. Reason/Need: On November 3, 2009 the Mayor and City Commission passed and adopted Resolution No: 181 -09- 12990, authorizing the Acting City Manager to execute an interlocal agreement with Miami -Dade County Transit for federal funding pass - through arrangements with the American Recovery and Reinvestment Act (ARRA) of 2009 Federal Transit (FTA 5307) for the installation of two bus shelters on Sunset Drive in the amount of $112,431.84. Miami -Dade County Transit requires for the City of South Miami to provide signed and sealed construction documents ready for permitting and procurement process. The expenditure for design engineering and construction documents was included in the City's original request for ARRA funds and will be reimbursed to the City of South Miami as long as the total expenditures for design engineering and construction of the two shelters do not exceed $106,810.25. The City's Public Works Department has obtained proposals from the City's pre- approved engineering consultants. T.Y.Lin International ( HJ Ross was selected as the lowest responsive engineering consultant from the following three proposals received: 1. T.Y.Lin International ( HJ Ross $9,800 2. EAC Consulting, Inc. $14,218.36 3. Kimley -Horn and Associates, Inc. $16,500 Cost: $9,800. Funding Sources: Public Works Professional Services Account Number 001- 1790 - 519 -3100 with an account balance of $32,800 before this request. Backup Documentation: ❑ Proposed Resolution ❑ Resolution No: 181 -09 -12990 ❑ Engineering proposal ❑ Miami -Dade County Transit Request. May 4, 2010 W Suite 400 1691 Michigan Avenue Miami Beach, Florida Mr. Rudy de la Tone, Assistant Director 33139 City of South Miami Department of Public Works 4795 SW 751h Avenue South Miami, Florida 33155 Re: Sunset Drive Bus Shelters City of South Miami, Florida Dear Mr. de. Is Torre: Kimley -Horn and Associates, Inc., (hereinafter referred to as "Consultant" or "KHA ") is pleased to submit this letter agreement to The City of South Miami (hereinafter referred to as "City" or the "Client") for professional consulting services relating to the above referenced project, as specifically described in the project understanding below. Except as specified herein, the terms of this agreement shall be in accordance with the "Professional Service Agreement — General Engineering Services" (the "Agreement ") between the City of South Miami and Kimley -Horn and Associates, Inc., as approved by the City Commission on March 17, 2009. Our project understanding, assumptions and scope of services are included below. PROJECT UNDERSTANDING 1) As understood, this work order generally consists of providing professional engineering services and land surveying services in relation with the design of two bus shelters to be located along Sunset Drive (SW 72nd Street) at the following locations: A Approximately 240 feet east of the intersection of SW 6151 Avenue, on the north side of Sunset Drive ➢ Approximately 100 feet east of the intersection of AW 67 °i Avenue, on the north side of Sunset Drive 2) The bus shelters are to be located within public right -of -way. No right -of- way acquisitions will be required. 3) There are no lighting, electrical or mechanical improvements required for the bus shelters. 4) There are no landscape or badscape improvements required for the bus shelters. 0 TEL 305.673.2025 FAX 305.673,4882 Kimlay -lim sunset Drive sus shelters, May 4, 2610, rage 2 of ME _. and AsgWates, Inc, 5) Plans for construction of similar bus shelters were previously completed by the firm of Corzo, Castella, Carballo, Thompson and Salman (C3TS) out of Coral Gables, Florida for the project known as "Bus Shelter Preliminary Plans (SW 62nd Avenue acrd SW 68'h Street) ", dated 5/23/08. It is understood that C3TS developed the architectural and aesthetic design of the bus shelter, which has been accepted by the City as their standard bus shelter. This proposal is contingent upon KHA's ability to reuse the C3TS design, and does not include the development of architectural designs or obtaining approval for such architectural designs from the City Commission, committees and/or boards. The plans for construction of the bus shelters under this proposal will be signed and sealed only by professional civil and structural engineers. 6) Upon acceptance of this proposal by the City, K14A will submit a letter to C3TS notifying them as to our intent to re -use their previous bus shelter designs and CAD files as a basis for this project. 7) As part of the scope of services, K14A will obtain available water and sewer record ( "as- built ") drawings from the Miami -Dade Water and Sewer Department and the City's Storm Sewer Atlas. Given the short turn- around time required for submittal to MDT, there will not be enough time to obtain utility records from other utility companies. It will be the Contractor's responsibility to locate utilities prior to construction. 8) Deliverables under this scope of services will consist of construction drawings, CSI 2004 format specifications and an opinion of probable construction costs. 9) The proposed bus shelter locations were provided by the City. No transit or traffic studies will be required to determine bus shelter locations. 10) The bus shelter site plan will be design in accordance with Miami -Dade Transit (MDT) requirements, and shall comply with FDOT, AASHTO and ADA requirements. ASSUMPTIONS 1) We do not anticipate that drainage improvements will be required for this project. Should drainage improvements be required, design and permitting of drainage improvements will be performed as an additional service. 2) We do not anticipate needing to relocate utilities to clear conflicts with the proposed bus shelters. If utility relocations are required, the coordination with utility companies and design of the utility relocations will be performed as an additional service. 3) Design or modification of traffic signals is not required for this project. 4) Permitting services, other than submitting to MDT for approval of the bus shelter location and design, are not included in this scope of services. 5) Services relating to bid and award of the construction contract are not included in this scope of services. 6) Construction phase services are not included in this scope of services. Kiroley,Horn Sunset Drive Bus Shelters, May 4, 2010, Pago 3 of 6 and Associates, Inc. SCOPE OF SERVICES Task IA — Re- certification of Topographic Survey Polaris 3 Surveyors and Mappers (P3SM) performed a topographic route survey of Sunset Drive, which was used by C3TS as a basis for the plans titled "Sus Shelter Preliminary Plans (SW 62 "d Avenue and SW W Street) ", dated 5/23/08. P3SM has agreed to update and re- certify portions of the original survey for use in this project. Task 2.0 - Sus Shelter Site Plans During this phase of the project, Kkk will provide the following services to the Client: 101 Attend one "kick -off' meeting with City of South Miami Public Works Department staff. 2.02 Visit each of the two proposed bus shelter sites to perform visual reconnaissance, take photographs and verify the survey provided by P3SM. 2.03 Obtain available water and sewer utility record (as- built) drawings from the Miami -Dade Water and Sewer Department (MDWASD), and the City's Storm Sewer Atlas. 2.04 Review MDT, FDOT, AASHTO and ADA criteria for design of the bus shelter site. 2.05 Prepare conceptual layout plans for each of the two bus shelters and discuss with MDT. 2.06 Prepare storm runoff calculations the pre and post - development conditions and discuss with Miami -Dade DERM. We do not anticipate that DERM will require physical drainage improvements for the bus shelters. 2.07 Based on any feedback or input received from MDT on the conceptual layouts, KHA will finalize the bus shelter site plans. 2.08 Prepare an Engineer's Preliminary Opinion of Probable Costs (OPC). 2.09 KHA will prepare four (4) sets of construction drawings (three for MDT and one for the City) and subnut to MDT and the City for review and comment. 2.10 Address a reasonable number of review comments from the City and MDT, revise the plans as deemed necessary by the Engineer, and resubmit to MDT. Task 3.0 — Sus Shelter Structural Plans and Computations During this phase of the project, KRA will provide the following services to the Client: 3.01. Based on the standard bus shelter design adopted by the City, KHA will provide structural engineering calculations for bus shelter spread footings, concrete columns, steel reinforcement and roof elements. The design will be for typical soil conditions and will not be based on actual soil tests. t6mley ^Nom Sunset t)dvc Bus Shchns, May 4, 2010, Page 4 of 6 _ -_ and Associates, Inc. 3.02. The design will be typical and used for both bus shelter locations. 3.03. KHA will prepare an Engineer's Opinion of Probable Construction Costs for structural elements. 3.04. KHA will prepare four (4) sets of structural plans and details (three for MDT and one for the City) and submit to MDT and the City for review and comment. 3.05. KHA will address a reasonable number of review comments from the City and MDT, revise the plans as deemed necessary by the Engineer, and resubmit to MDT. Task 4.0 — Technical Specifications KHA will prepare a set of technical specifications for all components of the plans described in Tasks 1.0 and 2.0 above based on CSI 2004 format, and provide these to MDT and the client in both hardcopy (4 sets) and electronic (MS Word) formats. it is understood that MDT will provide all of the "front -end" or "boiler- plate" documents necessary to complete the bid/contract document. Task 5.0 — Additional Services Any services not specifically provided for in the above scope will be considered additional services. Additional services we can provide include, but are not limited to, the following: 1. Architectural design 2. Landscape architecture and urban design 3. Electrical and mechanical engineering and design 4. Lighting design 5. Environmental engineering 6. Traffic studies and engineering 7. Roadway design 8. Drainage design 9. Design of public infrastructure improvements 0. Coordination and design of utility relocations 11. Plan revisions requested by others after submittal to MDT 12. Redesign resulting from substantial site layout changes caused by others 13. Revisions to plans due to changes in project scope, budget, and/or concept 14. Services required by additional governmental regulations, which might be put into effect after the date of this agreement 15. Revisions to invoices or additional invoice backup coordination I6. Erosion control plans and NPDES permitting 17. Dewatering plans 18. Permitting and regulatory services 19. Assistance during bidding and award of the construction contract 20. Construction phase services 21. Attendance to meetings, hearings, presentations or coordination in addition to those described in the tasks above 22. Deliverables not specifically outlined in the above tasks 23. Any other service not specifically listed in "Scope of Services" Kimley -Horn Sunset Drive Bus Sbelters, May 4, 2010, Page 5 of 6 and Associates, Inc. TO BE PROV`1DED BY CLIENT The following items are to be provided to KHA by the Client: 1. City of South Miami drainage atlas and/or as- builts 2. City of South Miami standard bus shelter design SCHEDULE KHA will provide its services in order to meet the schedule mutually agreed to by the Client and the Consultant for the various elements of the project. FEE AND BILLING The consultant will accomplish the services outlined in Tasks 1.0 through 4.0 of the Scope of Services for the lump sum fee of $16,500.00 and as shown in the table below. If services under Task 5.0, Additional Services, are specifically requested by the Client in writing, KHA will provide a supplemental scope of services and fee to perform these services. Office expenses have been included within the lump sum amount and would include in -house duplicating, facsimile, local mileage, telephone, postage, in -house blueprinting, word processing, and cellular telephone use. For other direct and reimbursable expenses, the City will pay the Consultant the direct costs as per Section 4.0, "Basis of Compensation", of the Agreement. Lump ,Sum Fees Task Description Lump Sum Fee 1.0 Re- certification of Topographic Survey ................. ......................$1,000.00 2.0 Bus Shelter Site Plans .............. :..................... ............................. .. $7,000.00 3.0 Bus Shelter Structural Plans and Computations .... ......................$6,500.00 4.0 Technical Specifications. ........ ..................._........... ......................$2.000.00 TOTALS $16,500.00 IGmleyHorn Sunset Drive Bus Shelters, May 4, 2010, Page 6 of() _ -_ and Associates, Inc. CLOSURE In addition to the matters set forth herein, our Agreement shall include and be subject to, and only to, the terms and conditions of the "Professional Service Agreement — General Engineering Services" (the "Agreement ") between the City of South Miami (Client) and Kimley -Horn and Associates, Inc., (Consultant) as approved by the City Commission on March I7, 2009, which is hereby incorporated by reference. If you concur with the foregoing and wish to direct us to proceed with the aforementioned services, please issue a Work Authorization, Notice to Proceed or Purchase Order in writing to the consultant referencing this document as Exhibit "A ". Pees and time stated in this agreement are valid for sixty (60) days after the date of issuance by the consultant. I appreciate this opportunity to submit a letter agreement. Please contact Juan Jimenez at (305) 673 -2025 if you have any questions. Very holy yours, KIMLEY -HORN AND ASSOCIA'T'ES, INC. Aaron E. Buehler, PE Juan E Jimenez P.E. Vice- PresidentlAssociate Project ManagerlAssociate M9Markciinglsoulh Miami. City oPBus sholtcrs \Proposa1\Kl4A Scopo .2010- 04- 12.Bus Shcltcrs.doc r r May 11, 2010 Rudy De is Torre Assistant Public Works Director CityofSouth Miami 4795 S Vv: 75th Avenue Miami, FL 33155 Re: MDT Bus Shelter, Site Piaris EAC Project No. 0$o24.SD01 -06. Dear Mr. De le Torre: EAC Consulting, Inc. is pleased to submit, this fee proposal (attached) to provide professional civil engineering services for the permitting of two Miami -Dade Transit (MDT) public bus shelters. Scone of Work: Design Phase:. 1. Contact all applicable utility companies and. secure As -built drawings of all underground and above ground utilities, Perform miscellaneous data collection as necessary. 2. EAC shall provide a full topographical survey for the limits of work. 1 Prepare detailed construction drawings at an acceptable scale (including, Out not limited to, site plan, paving, grading, drainage, marking/ signage, (as applicable), MOT plans and construction details). 4. Prepare an Engineer's Estimate of Probable cost. 5. Prepare and .submit permit drawings required for this project. It is anticipated that permits will be required from DERM /Building & Zoning,, MDT and the City of South Miami Public Works Department. The proposed design will be done in accordance, with the established guidelines and procedures utilized, by the City of South Miami Public Works Department, the Miami - Dade County Public Works Department, Miami =Dade Transit and the Miami -Dade Department of Environmental Resource Management' (DERM) /Building &.Zoning, it is anticipated that EAC shall complete and submit the drawings at a date three (3) weeks from issuance of a Notice to proceed (NTP). EAC Consulting, Inc. shall provide construction documents and permitting assistance in accordance with the Professional Services Agreement for General Engineering Services. Our lump sum.. fee proposal for this scope of services Is as follows: 5100 NW 33 Avenue, Suite 243 l Sort Lauderdale, FL 33309 t Phone: 954-733 -8004 1 Fax: 954733.8604 l wWw.eacconsult,com l CA #7011 Task Fee 10Q% Construction Documents — final construction —documents, final en sneer s aost:e'stmate. $9,500.00 Survey Sub - Consultant F.R. Aloman & Associates, 4no) ReimbursebbJes $350,00 Total LurnR' Sum Fee This: proposal is based on our understanding of the r0quirements for engineering services as Itemized under the anticipated I tasks listed above. Accordingly, we reserve the right to modify itemized proposal:due to any changes in sebbe. If the above fee proposal and the terms aboveate acceptable to you, please provide us with a work authorization. so we may begin work. Sincerely., EAC Consulting,16c ' - 4 - (f Mendez, �P Senior Project Mandgeir City of South Miami Authorization cc: File Mike Ad6ifei P.E. — CAC Consulting, Inc. Huntley Higgins, P.E. EAC Cohsbffing, Inc. 5100 NW33 Avenue, Suite 243 1 FonLauderdale; FL 333091 Phone:954-733-8004, I Fak:954-733-8604 Iwww.eadconsult.com ICA# 7011 °YUINTERNATIONAL I HJ ROSS erx, lnecrs I plorners I scienlisis May 6 " 2010 Mr. Rudy de la Torre. Public Works Department: City of South Ivliami 4795 &W. 75 "' Avenue ivliami, FL 331.55 Re: 2 Bus Shelters Sunset Tar & 67 live and Sunset Dr and Std 61 Ave Civil Bn gineering Services Proposal (Design) Dear ivir. de: la. Torre T.Y. Lin International / H.J. 'itoss.(TY1,113.iR) appreciates the opportunity to provide this proposal for civil engineering services for the referenced project. The work scope involves.civil engineering services for 2 Bus Shelter's at Sunset Dr & 67 Ave RE Coiner and Sunset .Dt. Fast. of SW 61 Ave Not-th Side h9:iami -I)ade Comity, Florida. The scope of services proposed for this project is flurther described in the attached .Exhibit "A' The proposed fee for these services is lump sum fee of$ 9,300-00 'T'YLUT-DR proposes to accomplish the Basic Design Services described in Exhibit "A ". Pumit Support, Bidding Assistance, Negotiations Assistance, and any Additional Services, if required, will be provided on a hump sum basis. We rook forward to working with you oil this project and thank you for the opportunity to be. of service. 'Please do not hesitate to uorrtact me if you have any questiois regarding thiv nranosat 6 201 Alhambra Cirole., Suite 900 I Coral Gables, Florida 33134 IT 305.567.1888 IF 305.567.1777 I vANyAy1jnxOtn W- U INTERNA110NAL I HJ ROSS "SCOPE OF WORK" 1. DESCRIPTION OFTRE PROJECT '1'his proposal consists of 2 Thus Shelter design at Sunset Dr& SW 67 Ave NL Corner and Sunset .Dr a', last of Stir 61 Ave north side within the City of South. Miami. "1'Yi'.,IY1.Jj-, t. will provide civil engineering design services for the street improvements required. 2. SCOPE 0-9 WO K'TO 13E PERFORMED BY iTLIALY R sw�11,IYHIR will prepare construction documents for ale civil elements of the }project within the limits in accordance with the recjuireinenfs of City of SOU't:h Miami and other local rc3gulatoay agencies. 12 'MIL7IJUR will, prepare the fyliowing Construction Documents and Construction Administration Services for the intersection improveln6uts: w Location Map and General Notes Site Demolition Plan Site Layout. Geometry flan. Plans Utility Relocation. Plan (ifroqeired). Signing and Pavement Marking Plan TWiscellaneous Details 23 TY1,11H'J'R will provide a.project Manual including'rethnical Specifications. 2.4 TYL,llWR will provide An Engineer's estimate of probabkz construction costs.. 2,5 'TYI.,T /H R will provide utility coordination with known utility companies within the project limits and wift acquire available as -buiPt flans of those utilities. 2.6 TYLIA-UR will attend naectings with Owner, Building 'Departineirt, and other regulator agencies to address construction document issues_ 2.7 TY,.LT /14IR will provide responses and applicable rrvisions.to cominents from the jurisdictional agency reviews 2.8 I'YL'1' /I-UR will provide calculations and permit applications required for submittal and perruitti,ng of the civil portion of the project. 'T'his includes Miarni- Dade Departtnein of Environmental 'Resources Management, and Miami -Bade Wafer and Sewei Departmerit, Public Works and other local regulatory agencies. 2.9 Off-site improvements may be required by the applicable regulatory agencies, Should such. improvements be required, -a separate proposal will be prepared at Such time As the scope of these improvements becomes clearly defined. naaF ( or , TYLE INTERNATIONAL i NJ ROSS enc3moersl ulannrrs I scieniisis 3. ITEMS NOTTNCLUDED S. I ldchtr'atal Gootechnical ttSfrn£r other than what is described in section 2. 3.2 Construction Permitting. 3;3 Environmental Consulting Services of any kind. 3.4 Traffic Signafization Design/Modifications. 3.5 Permit Sees, i'tfan Review Sees or other- governmei tal'charges. 3.6 Changes to Civil Drawings resulting from Site Flan modifications after completion of Schematic Design. 4. INFORMATION TO BE, PROVIDD TO s'i'r €/I:UR 4.1 City owned as- built plans for existing site conditions. 5. 4Ckili,EfULE 4)4' :SERVICES The work will commence upon receipt. ofan executed: Proposal and the necessary information requested above. The preliminary schedule for completion. of each ol; the deliverables for cacti phase will be a8 follows: It should be noted thai, the above schedule car] be ifurther refined upon request biased upon the specific requirements of the Client applicable to each phase of the overkill project. C:C3tS5Lir'I'%NT'S Project Manager for this Work Order assignment will be Jost. M. Nessi Prepared by: .Pose M. Nemi Approved by: b'aan: i of i Date Page 1, of 1 De [a Torre, Rudy From- Salmon, Javier (MDT) Usalmon @miamidade.gov] Sent. Friday, March 49,:2010 12:08. PM To: GMartinez @cityofsouthmsimi, net, De la Torre, Rudy Cc; Sehota, Surinder (MDT); Padron, Isabel (MDT); Fain, Lynne S. (MDT}; Warded, Mary (MDT) Subject* MDT internal review Attachments: Comments and PWD shelter guidelines; MDT Border (G -BS -001) (Final Draft).pdf Mrs. Martinez and Mr. De la Tone Attached please find our MDT comments sheet, PWD Shelter guidelines as well as required plans title block, In addition please considered the following: 1: Your Bus shelter proposed locations were found acceptable 2. MDT is in the process of assigning a project number that I will forward next week. 31 MDT schedule contemplates that 3 weeks from today, by April 12/2010, will be ample time for you to conduct here attached comments, revisions and resubmit We are looking forward to submit your plans for dry run permitting and start up contractor selection as soon as possible. Thanks for your continued cooperation, looking forward to a timely project completion Javier Salmon Construction Manager 786.469.5266 Off 786.469.5573 Fax 786,473.4710 cell. 5/13/3.0141 Paige 1 off _. De to Torre; Rudy From, De la Torre, Rudy Sent: Thursday, April 15, 2010 11:59 AM To: 'Salmon, Javier (MDT)' Cc, Aubrun, Carol Subject RE: ARRA shelters Project Good morning Javier, As per our previous discussions regarding requested documents submittal, please be advised that due to challenges in providing the documents within the required time frame, we are requesting for an extension of time to re- submit. Should you have any questions please call me at 305 -796 -1543. Regards, Rudy de la Torre Assistant Public Works Director City of South Miami Public Works Department 4795 SW 75th Avenue Miami, FL 331$5 Office: 305 663 6350 - Fax: 305 668 7208 e -mall address: rto{.(,[acofsgvthrnia�ni,net Front: Salmon; Javier (MDT) (mailto:Jsaimon @miafnidade.gov] Sent.' Wednesday, Mardi 31, 2010 3 :46 PM To; cspel8r it@a virginiagardens- fl.gov; De la Torre, Rudy; khart @craventhotnpson.com Cc, Padron, rsat ei (MDT); Wardell, Mary (MDT); Maple;. Celestine (MDT); Simmons, Michelle (MDT); Fain, Lynne S. (MDT); Sahota, Surinder (MDT)' Subject; ARtRA shelters Project Friendly remainder. The intent of this email is only to remind you of your documents re-submittal, Please let us know how are things progressing , do you have any concerns 7 , etc. Also keep in mind that the strict grant structure will makes the following items non eligible for re- imbursement: post design items, PWD request for changes, modifications or any additional items related to re- design or re engineering for your design submittals. Should you have any questions or, concerns please do not hesitate to contact me, Javier Salmon Construction Manager 786,469.5266 Off 786.469.5573 Max 786.473.A710 cell. 5!1312010 .......... N -HO K m z Z Q O co m Q 'o -1 0 0 0 16 a C" g a 0 a w -U a a'- -,I �w w ` O 0o a 5' 0 0 6 'o 0 1 g C, 1. R 00 s 0 - R ZF 'o 6 0� 0 , CD o a 0 0 �o � 0 0 a m u Er 0 0 0 0 0 m o w 2 5 w o 0 w o -- o @ Ey (D -Er@. o 2:amEl 3 w 0 3 2, a d5 co ID 1 0 M.0 0 0 m m as 06 0 0 0-0 0 m m w @ CD o o W8 (o m OUT O S. S. w 0 W vr 7a o O .......... l GENERAL MLAMI -DARE COUNTY PUBLIC WORKS DEPARTMENT. GUIDELINES To PLACEMENT OF NEW BUS SHELTER ON PUBLIC RIGHTS -OF -WAS' Show accurate location and dimensions of existing and proposed bus shelters. Show dimensions from road intersections, sidewalks, R/ W line, and driveways to all sides of the proposed bus shelter (if nearest driveway or road is >40' in advance of shelter, "> 40' " may be indicated without greater di mension detail on that side of shelter). The actual dimension Will be shown following the shelter in all cases. Show existing curbing, proposed ramp connections to sidewalk and curb cuts, including truncated domes surface. ' Show all obstacles or barriers to be removed or relocated in order to make the bus shelter accessible to ADA users. ' Show bus bench with dimensions on the detail mat foundation plan. Where no ADA walk around can be provided and the shelter slab is inline with sidewalk, then the advertising panel shall not be installed to allow ADA passage through the shelter. The contractor and MDT shall comply with "FDOT's Section 14= 20.005, for any shelter installed on a state road. A copy is attached fbr reference. Please note that with reference to items 20, the term "the Department" shall mean either FDOT or PWD, and the term "appropriate city of local government" shall mean MDT. Furthermore, MDT shall be'responsible for "the terms in itern 21 at, their expense, The contractor and MDT shall comply with FDOT's Section 14- 20.003 (20) and (2 1) for any shelter installed on a county road. The term "the Department" shall mean PWD, and the term "County Road" is substituted for the term "State Road ". Proposed new bus shelter location criteria All new locations must meet current sight distance Triangle, setback, and clear recovery zone requirements as detailed in the Florida Green Book. Plans must be signed and sealed by a P.E. registered in Florida. Pedestrian/ADA accessibility must be maintained at all times while shelter is under construction. Access must be maintained in accordance.. with FDOT STD. Index S60 (Pedestrian Control for closure of sidewalks). i �! K �s�r Bus shelters shall not obstruct any sidewalk, bike path, pedestrian path; . driveway, drainage structure or ditch, etc, and shall" provide at least three (3') feet clearance for pedestrian traffic and at least nine (9') feet clearance for bike path (8' path plus 1' unobstructed shoulder). Bus shelters shall' not be located within fi$een: (1s') feel of any fire hydrant or handicapped parking space. . Refer to minimum bus shelter setback r'egizirenlent 'sheet (attached), , Provide, a 3' wide concrete path connecting the shelter, the sidewalk (if existing) and the roadside. In addition, provide a 5' x s' landing slain where the concrete path meets the roadside. The 5' g 5' landing shall meet the roadway in one of three ways; Behind, curb and gutter (urban) Behind valleygutter (urban) Meet roadway flush (rural) In rural Iocations without curb; if the'required setback cannot be met, curb and gutter shall be provided for the entire frontage of the shelter, in order to provide urban setback requirements. Nate: if shelter cannot be ad'equatefy setback to satisfy sighC dtstaneo €Wangle requirements; the advertising panel could be removed required clearance, as an alternative to meet tIi' Rio Bus shelters shall not obstruct any sidewalk, bike path, pedestrian path; . driveway, drainage structure or ditch, etc, and shall" provide at least three (3') feet clearance for pedestrian traffic and at least nine (9') feet clearance for bike path (8' path plus 1' unobstructed shoulder). Bus shelters shall' not be located within fi$een: (1s') feel of any fire hydrant or handicapped parking space. . Refer to minimum bus shelter setback r'egizirenlent 'sheet (attached), , Provide, a 3' wide concrete path connecting the shelter, the sidewalk (if existing) and the roadside. In addition, provide a 5' x s' landing slain where the concrete path meets the roadside. The 5' g 5' landing shall meet the roadway in one of three ways; Behind, curb and gutter (urban) Behind valleygutter (urban) Meet roadway flush (rural) In rural Iocations without curb; if the'required setback cannot be met, curb and gutter shall be provided for the entire frontage of the shelter, in order to provide urban setback requirements. Nate: if shelter cannot be ad'equatefy setback to satisfy sighC dtstaneo €Wangle requirements; the advertising panel could be removed required clearance, as an alternative to meet tIi' :W% WflYIT AL pN/(iJST l5. EV5 fYHGU4INMT YLWS � NOT Y0.V CLNST.WCT /ONI g t 3 Y g 8 3 O A D A 3 b Z D y N ~ � O k k x 1 � I k � p i 1 4l 1 4 � O I i � � I _I r d� N� k$ m 4 1 I V 999 I � I I I I I ' I m I N , I __ , E g� �� N k } x a P ° k 3' 'f k � k � m O .'f1 q N � Z O> g c> ? � x r 8 f^ M o<