Ord. No. 44-08-1979 (ord only)ORDINANCE NO. 44-08-1979
AN ORDINANCE OF THE MAYOR AND T1IE CITY COMMISSION
OF THE CITY OF SOUTH MIAMI, FLORIDA RELATING TO THE
PERMIT FEE /FEE SCHEDULE ; AMENDING ORDINANCE 32 -01-
1763 AND 15 -04 -1822 AS AMENDED BY ORDINANCES TO,
INCREASING SOME PERMIT FEE, ADDING NEW FEES AND
DELETING SOME FEES FROM THE SCHEDULE, PROVIDING FOR
SEVERALBILITY, ORDINIANCES IN CONFLICT, AND AN
EFFECTIVE DATE;
WHEREAS, the City has reviewed permit fees schedules for Miami -Dade County
and several municipalities.
WHEREAS, the City has found that fees for the County and other municipalities
are higher than those fees included in the South Miami Permit Fee / Fee Schedule.
WHEREAS, the cost of plan review, inspections and permit processing has
increased considerably in the past few years.
WHEREAS, the Mayor and City Commission desire to adopt a new Permit Fee /Fee
Schedule allowing funding which will cover the cost of services provided.
NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA:
Section 1. That Ordinance 32 -01 -1763 AND 15 -04 -1822, shall be amended by this
Ordinances by replacing the Permit Fee /Fee Schedule with the amended Permit Fee
/ Fee Schedule as follows:
SCHEDULE OF FEE
Year 2001 2002 2003 2004 2008
(A) BUILDING PERMIT FEES
I NEW CONSTRUCTION
(all roofed areas)
2 0 to 25,000 sq. ft. per sq. ft. $0 53 $0.65 $0.65 per sq. ft
3 Plus for 25,001 and over
per sq. ft $945 $0.50 $0.50 per sq. ft.
4 NEW CONSTRUCTION,
RESIDENTIAL
ADDITIONS
5 Per sq. ft. UAS $0.50 $0.50 per sq. ft.
Page I of 25
$040 $0.75 65.00 Minimum.
$0.75 per sq. ft.
$0.20 $0.20 $65.00 Minimum
$0.20 per sq. ft.
$5 00 $9.00 $65.00 Minimum
and $9.00 each
$9-13 $0.25 $0.25 Per sq. ft.
$0.20 $0.20 $65.00 M n mum
$0.20 per sq. ft.
$015 $0.15 $65.00 Minimum
$0.15 per sq. ft.
$0.10 $0.10 $65.00 Minimum
$0.10 per sq. ft.
Page 2 of 25
Res. No. 44 -08 -1979
6
ALTERATIONS,
IMPROVEMENTS AND
REPAIRS TO
BUILDINGS
7
Per sq. ft.
8
GENERAL REPAIRS
AND OTHER WORK
NOT SPECIFIED ABOVE
9
Per sq. ft.
10
INSTALLATION,
ALTERATION OR
REPAIR OF EXTERIOR
WINDOWS, DOORS
AND SHUTTERS
1I
Each
12
INSTALLATION,
ALTERATION OR
REPAIR OF CURTAIN
WALLS OR STORE
FRONTS
13
WOOD DECKS,
WALK.WAYS, SCREEN
ENCLOSURES, POOL
DECKS, AWNINGS,
CONCRETE SLABS AND
CANOPIES
14
Per sq. ft.
15
PARKING LOTS AND
DRIVEWAYS
16
Per sq. ft.
17
ROOFING
18
Per sq. ft.
19
FENCES, WALLS, A/C
SCREENS AND
RAILINGS
$040 $0.75 65.00 Minimum.
$0.75 per sq. ft.
$0.20 $0.20 $65.00 Minimum
$0.20 per sq. ft.
$5 00 $9.00 $65.00 Minimum
and $9.00 each
$9-13 $0.25 $0.25 Per sq. ft.
$0.20 $0.20 $65.00 M n mum
$0.20 per sq. ft.
$015 $0.15 $65.00 Minimum
$0.15 per sq. ft.
$0.10 $0.10 $65.00 Minimum
$0.10 per sq. ft.
Page 2 of 25
Res. No, 44 -08 -1979
20
Per Linear feet
REQUIRED FROM
$65.00 Minimum
$10 per sq ft
SAFETY REASONS
$030
$0.50
$0.50 per L.F
21
PARKING LOT SEAL
additional pile
COATING AND
STRIPING
22
0 to 1000 sq. ft.
$3g..g0
$45-00
$65.00 Minimum
$0.15 ber sa. ft.
23
Each additional 1000 sq. ft.
$5-88
$10.00
or fraction
24
SVMVIMING POOLS
W0.00
$125.00
$125.00
25
DEMOLITION
26
0 to 1000 sq. ft.
$75.00
$75.00 Minimum
$0.05 per sg. ft.
27
Each additional 1000 sq. ft.
$10.00
$15.00
or fraction
28
PAINTING,
SANDBLASTING OR
$50.00
$50.00
STEAM CLEANING
( Commercial only)
29
SIGNS, each
$gg�8
$75.00
$75.00 Minimum $
2.00 per %g ft.
30
MOVING BUIDLING OR
$75.00 Minimum $
STRUCTURE
0.11 per sq. ft
31
TEMPORARY
$65.00 Minimum
BUILDING
$0.20 per sq. ft.
32
EXTERIOR WINDOWS,
$65.00 Minimum
DOOR, SHUTTERS
$900
.
$9.00 each
33
TEMPORARY
$65.00 Minimum
PLATFORMS
$0.20 Per sq. ft
34
ORNAMENTAL IRON
$106.30 Minimum
$0.10 per sq. ft
35 PERMIT ALSO
REQUIRED FROM
PUBLIC SAFETY FOR
$10 per sq ft
SAFETY REASONS
36 PILE DRIVING
$65.00 for first pile
$20.00 for
additional pile
Page 3 of 25
Res. No. 44 -08 -1979
37 . ANY OTHER WORK $10.00 per $1,000
NOT COVERED of construction
cost.
38 A/C SCREENS,
MASONRY FENCES, $65.00 Minimum
RETAINING WALL & $0.30 Per I.F.
RAILING
39 LANDSCAPING TREES $10.00 Each Tree
40 LANDSCAPING $25.00 per 100 I.F.
HEDGES or additional
fraction
41 LANDSCAPING $20.00 PER 100
GROUND COVER sq. ft. Or
additional fraction
42 FOOTING FOR POLES $7.50
43 REINSPECTION FEE $50.00 $50.00
( B) PLUMBING PERMIT FEES
Year 2001 2002 2003 2004 2008
44 SANITARY SEWERS
Each connection $55:08 $100.00 $100.00 Each
45 WATER SERVICE $55.00 $75.00 $75.00
46 Water services Sub - meters $4.0;00 $25:88 $40.00
47 Water service submeters each
additional $8.50 each
48
SANITARY SEWER
COLLECTION SYSTEM
INSIDE PRIVATE
PROPERTY
49
Each 50 feet, or fraction $30.00
$30.00
$30.00
50
each manhole $30,00
$50.00
$50.00
51
Sewer capping $35,08
$50.00
$50.00
52
Sump pump $35.00
$100.00
$100.00
53
Repairs to sewer or any
$60.00
other waste line
$100.00
$100.00
Page 4 of 25
Res. No. 44 -08 -1979
54
STORM SEWER
55
Each roof drain inlet
$15.00
$15.00
56
Catch basin or area drain
$33:80
$50.00
$50.00
57
Soakage pit, trench or
French drain
$25.00
58
0 to 50 linear ft. or fraction
$35.08
$50.00
$20.00
59
Each additional, linear
$13700
$25.00
$25.00
50ft. or fraction
60
Storm Sewer Capping
$30.00
61
A/C CONDENSATE
DRAINS per unit
Nttn
Y ov0
$28:00
$35.00 each
62
WATER PIPING
63
Water Main 0 to 50 linear
feet
$3-5-n0
$100.00
$100.00
64
Each additional, linear foot
or fraction
$8-23
$1.00
$1.00 per Linear ft.
65
PLUMBING FIXTURES
AND ANY OTHER
DEVICES INCLUDING A
SUPPLY ANA /OR
WASTE CONNECTION
66
Set
$7.00
$10.00
$10.00
67
Rough
$7.00
$10.00
$10.00
68
LAWN SPRINKLER
SYSTEMS
69
Sub- meters, each
Voko
$25.00
$65.00 Each
70
Sprinkler heads, each
$1-08
$ 1.25 Each
71
Water supply to sprinkler
$35:88
$50.00
$65.00 Each
72
Zone Valves, each
$13,80
$20.00
$25.00 each
73
FIRE PROTECTION
74
Fire protection Jockey
$30.00
PUMP
75
Water supply to fire
sprinkler system
$35.00
$50.00
$50.00
76
Fire pump or domestic
pump, new or replacement
$30-00
$100.00
$100.00
77
Each standpipe, Siamese or
roof manifold
$35.00
$50.00
$50.00
78
Each hose rack of Fire
Department outlet
$10:80
$25.00
$25.00
79
Each sprinkler head
$1-50
$1.25
Page 5 of 25
Res. No. 44 -08 -1979
80
Fire Hydrant
40.00
81
Backflow preventer fireline
$60.00
82
Fire protection flow test
$40.00
83
Sump pump, re- circulate,
domestic and vacuum
$65.00
$75.00
pumps
Each additional 150
84
INTERCEPTORS AND
SEPARATORS
85
Septic tanks, settling tanks,
etc. 0 to 750 gallons $45M
$30.00
$75.00
86
Each additional 150
gallons, or fraction over $15-00
$28:88
$75.00
750 gallons
87
Drainfield relay;
88
0 to 100 sq. ft. $4588
$50:88
$75.00
89
Each additional 100 sq. ft. $10 =08
$20.00
$20.00
90
SOAKAGE PIT
$50.00.
91
SW /M4lNGPOOLS
92
Swimming pool piping $75.00
$100.00
$100.00
93
Swimming pool and Spa
$135.00 each
commercial
94
Swimming pool repairs
$5008
$65.00 each
95
WELLS $4588
$75.00
$75.00
96
TEMPORARY TOILETS $40.00
$40.00
97
LIFT STATIONS $300.00
$300.00 each
98
NATURAL GAS OR A
LIQUIDFIED
PETROLEUM
99
Each outlet, appliance or
$15.00 per $1,000
meter
of estimate
$-}8.88
$15:08
construction cost or
fraction of
construction cost
100
L.P. Gas Tank $75.00
$100.00
$100.00
101
TEMPORARY WATER
$50.00 Each
CLOSET
102
WATER TREATMENT
Page 6 of 25
Res. No. 44 -08 -1979
103 For first 1000 value
104 each additional Value
105 MEDICAL GAS
INCLUDING VACUUM
OUTLET
106 FRENCH DRAIN AND
CATCH BASINS
Year
107 MINIMUM FEE
(C) MECHANICAL PERMIT FEES
2001 2002 2003 2004
108 AIR CONDITIONING
AND REFRIGERATION
(1 ton--I HP= 12,000 BTU)
109 Each unit, 0 to 5 ton
110 Each additional ton or
fraction
111 A/C CONDENSATE
DRAINS
112 A/C Wall Unit
113 A/C ductwork first $1000
value
114 A/C ductwork after first
$1000 value
115
OB JE42TQ HOOT
E EAW E-RE
GLASS$'-I ED,
116 STRIP HEATERS, per unit
117 Strip Heaters after first five
118 PAINT SPRAY BOOTHS
119 Paint spray booths
120 Paint spray booths each
additional 100 sq.ft.
$75.00
V5.00
$25.00
Page 7 of 25
$75.00
25.00
$10 per outlet plus
piping fee of
$25,00 Der $1,000
estimate
construction cost
$50.00 Each
2008
50.00
$75.00
$18.00 $18.00
$25.00 Each
25.00
$35.00 Each
$15.00 Each
"-.00
$25.00
$15.00
$200.00 $200.00
$75.00
Res. No. 44 -08 -1979
121
INTERNAL
COMBUSTION $75.00
$75.00 each
ENGINES, each
122
PRESSURE PIPING
123
$0 to $1000 $30.00
$60.00
$60.00 Each
124
Each additional $1000 or
V5.0 0
fraction
$25.00 Each
125
COOLING TOWER $190:00
$200.00
$200.00
126
MECHANICAL
VENTILATION
SYSTEMS
127
$0 to $1000 $30.00
$40.00
$40.00
128
Each additional $1000 or
$4 -3-80
$20.00 .
$20.00
fraction
129
FIRE PLACE AND
BARBECUES
$35.00
130
INSULATION, FIRE
PLAG , A/C DUCTS,
PNEUMATIC TUBES
AND CONVEYOR
SYSTEMS
131
Each $1000 or fraction $35.00
$35.00
132
I S LA I,ON BOILERS
AND PRESSURE $355.00
$100.00
$100.00
VESSELS. Each
133
Boilers and pressure
vessels each ad 100000
$15.00
BTU
134
GENERATOR UP TO 50
KVA
$100.00
135
Generators each additional
$20.00 each
5 KVA
136
EXHAUST FANS $25.0
$50.00
$50.00
137
DRYER VENT
$25.00
138
KITCHEN HOODS
139
Commercial $150.00
$150.00 Each
140
Residential
$25.00
Page 8 of 25
Res. No. 44 -08 -1979
141 TRASH CHUTE
142 WALK IN COOLER
A Z613WO 3N [1:1101/1 1:7
144 I
o�rpSTED, POOL
HEATER
145 Pool and Spa Heater
146 SMOKE CONTROL
SYSTEMS, each test
147
STORAGE TANKS FOR
FLAMMABLE LIQUIDS
148
Pik for flammable
154
liquids
149
S?,IO E EVAC=UATION
FEEDERS, EACH ,
W&PEGTION BOILERS
Each 100 amps or fraction
AND PRESSURE
Services and feeders, 101
VESSELS $3-5
150
Annual re- inspections
151
Reinsnection
$150.00
$75.00
$65.00
( D) ELECTRICAL PERMIT FEES
Year 2001 2002 2003 2004
152
ROUGH WIRING
OUTLETS
153
1 to 10 outlets
154
Each additional outlet
155
SERVICES AND
FEEDERS, EACH ,
156
Each 100 amps or fraction
157
Services and feeders, 101
to 200 amps
158
Services and feeders 201
to 400 amps
159
Services and feeders. 401
to 600
160
Services and feeders, 601
to 800
1
Page 9 of 25
$50.00
$50.00 Each
$35.00
35.00
$65.00
60.00
$250.00
$150.00
$40.00
$50.00
2008
$50.00
$2.00
$20.00
$25.00
$30.00
$35.00 Each
$40.00 Each
Res. No. 44 -08 -1979
161
Services and feeders for
each 100 over 800 amps
$15.00 Each
162
Services and feeders
temporary construction $58,99
$60.00 Each
163
Services and feeders,
171
service repair or meter $50.00
$75.00 Each
172
change
$30.00 Each
164
Services and feeders
temporary for testing $75.00 Each
$75.00 Each
165
Service temoo�
$65.00 Each
166
Services and feeders,
$59-90
$10.00 Each
renewal
167
SWITCHBOARDS
168
Each 100 amps or fraction $5.98
$1&90 $50.00
169 DUCTBANK $5.00 PER IX
170
EQUIPMENT MACHINE
OR SPECIAL PURPOSE
OUTLETS OR
PERMANENT
CONNECTIONS
171
Residential, each $19,00
$25.00 Each
172
Commercial, each $43700
$30.00 Each
173
CENTRAL AIR
CONDITIONING, per ton $10.00
$10.00 Per Ton
174
Chiller Per Ton
$10.00 Per Ton
175 CLEAR VIOLATIONS $50.00 Each
FOR NEW TENANTS
176 MOTORS, each
177 0 to 5 HP WAO $15.00 $30.00 Each
178 6 HP and over, per IIP $1.08 $2.50 Each
179 FIRE PUMP $60.00.
180 GENERATORS,
TRANSFORMERS,
HEATING EQUIPMENT,
STRIP HEATERS,
RECTIFIERS AND UPS
SYSTEMS, each
181 0 t IOKW $10.00 $10.00
182 11 KW and over, per KW $2.00 $2.00 Each
Page 10 of 25
Res. No. 44 -08 -1979
183
SIGNS, each $50;00
$75.00 $75.00 Each
184
Signs. up to three at same
$75.00
location
185
LIGHT FIXTURES
186
Parking lot light, per light $4 -5:00
$20.00 $20.00
187
Light poles, each $13:00
$20.00 $20.00 Each
188
Light fixtures 1 -10 sockets
$15.00
189
Light fixtures 1 -10
10.00
fluorescent
190
Light fixtures over 10
$2,50 Each
191
Light fixtures parking lots
$20.00 Each
192
Light fixtures all others $2 --W
$2.50 Each
193
PLU6MOLD FIRST 10
30.00
FEET
194
Plugmold each additional
5 l.f. after first 10 feet
$5.00
195
SATELLITE ANTENNAE $60.00
$60.00
196 BURGLAR ALARM
197 Installation, wiring and
devices per system $50:00 $60.00
198 Repairs, per system $45-00 $55.00
199 FIRE DETECTION,
SYSTEMS, per system $150.00 $150.00
200 TELEVISION AND
TELEPHONE SYSTEMS
201 Master Control 535:00 $50.00
202 Each device $2.00 $2.00
203 SWIMMING POOLS
AND SPAS
204 Residential $100.00 $100.00 Each
205 Commercial $85.00 Each
206 REINSPECTION FEE 50.00
Page 11 of 25
Res. No. 44 -08 -1979
Page 12 of 25
(E) CERTIFICATE
OF USE, COMPLETION OR
213
MINIMUM FEE
OCCUPANCY
214
Residential $60.08
Year
2001
2002 2003 2004
2008
207
Certificate of Occupancy,
FEE $35:00
$50 -00
extension.
217
Residential
$150.00
$150.00
208
Certificate of Occupancy,
40 year certification fee
$250.00
219
Information provided
Commercial, per story
$250.00
related to building matters
$250.00
209
Certificate of Use
$75.00
$75.00
210
Certificate of completion,
Fee for researching
building department
per story
$200.00
records
$200.00 each
211
Temporary Certificate of
units without first
$250.00
Occupancy or Completion,
$250.00
$250.00 each
violation
per story
223
Placing portable storage
212
Temporary Certificate of
$500 per violation
$100.00 for a 30
Occupancy other extension
or repeat violation
day period
(F)
OTHER FEES
Page 12 of 25
Year 2001 2002 2003
2004 2008
213
MINIMUM FEE
$100.00
214
Residential $60.08
215
Geramere al $100.00
216
PERMIT EXTENSION
$65.00 for 60 day
FEE $35:00
$50 -00
extension.
217
Permit Card replacement
$15.00
fee
218
40 year certification fee
$250.00
219
Information provided
related to building matters
$100.00
220
Fee for working on
Sundays and Holidays
$500 each
221
Fee for researching
building department
$75 per hour
records
222
Placing portable storage
units without first
$250.00
obtaining a permit first
violation
223
Placing portable storage
units without first
$500 per violation
obtaining a permit second
or repeat violation
Page 12 of 25
Res. No. 44 -08 -1979
224 RE- INSPECTION FEES $45,00 $50.00 $50.00
225 CHANGE OF 30 % of the
CONTRACTOR original permit fee.
$50:00 $65.00 minimum
and $250
maximum
226 rnTrr9R
REGI&T-RATION $2-500
227 Administrative fee,, ^o^nee
per-f�
228 THRESHOLD BUILDING
INSPECTIONS, per hour $125.00 $125.00
229 Minimum tw three hours
per single request.
230 SPECIAL REQUEST FOR
AFTERHOURS $- 100 =00 $125.00 $125.00
INSPECTIONS, per hour
231 Minimum three hours oer
single e request.
232 ADDITIONAL COSTS
233 In addition to the basic application fees listed, applicants shall pay for all reasonable costs incurred by
the City in processing said applications. These costs shall include but not be limited to advertising,
staff time and costs for qualified experts, such as, architects, engineers, planners, attorneys and others
deemed necessary for the review and evaluation of an application. These fees shall be in addition to any
other fees required by the City.
234 REVISIONS TO
APPROVED $I3.00 $25-00 $40.00
DRAWINGS, per sheet
235
PLAN REVIEW
236
Review after second $50.00
$50.00
rejection
237
Each additional review $75.00
$75.00
238
Lost plan fee
30% of original
building„ permit fee
up to $500.00
239 SHOP DRAWING $100.00 $100.00
REVIEW
240 WORKING WITHOUT A
PERMIT
Page 13 of 25
Res. No. 44 -08 -1979
241 First time offense
$100.00 lun s the
double of permit
fee, not less than
$165.00
242 Second time offense
Twice the double
permit fee plus
$200.00
243 Third time offense
Twice the double
permit fee plus
500.00
244 Fees charged for a permit shall be refunded by the Building Official subject
to the following:
245 No refunds will be made on requests involving:
a) Permit fees of $200 or less.
b) Permits revoked by the Building Official
c) Permits canceled by court order
d) Permits which have expired
e) Permits under which work has commenced
f) The original permit holder when there is a change of contractor.
A full refund will be granted to a permit holder who takes out a permit covering work outside City limits.
a) A written request is submitted to the City prior to the permit expiration date; and
b) A validated copy of the permit is submitted with such request.
Year
1 TEXT AMENDMENT TO
LAND DEVELOPMENT
CODE
2 REZONING
11 N &. MA NO
2001 2002 2003
$1,500.00 $1,750.00 $1,750.00
Page 14 of 25
2004
$1,750.00
2008
Res. No. 44 -08 -1979
3
Ten acres or less
4
Over ten acres
5
SPECIAL USE PERMIT
6
APPROVAL BY
ENVIRONMENTAL
REVIEW AND
PRESERVATION
BOARD
7
Applications for new
construction in the RS and
RT zoning districts
8
Single unit
9
All other applications for:
10
New construction
11
Renovation
12
Signs, fences, walls, etc.
13
For each additional
appearance before the
Board
14
VARIANCES
15
First variance request
16
Each additional variance
request
17
PLANNED UNIT
DEVELOPMENT
18
CHANGES TO A
PLANNED UNIT
DEVELOPMENT
19
WAIVER OF PLAT
APPLICATION
20
COMPREHENSIVE
PLAN AMENDMENTS
21
SPECIAL EXCEPTION
22
ADMINISTRATIVE
WAIVER
23
PUD Major Change
24
PUD Minor Change
$4300:00 $1,750.00 $4;738.88 $173008 $6.000.00
$1-3 ;308:08 $13300.00 $1-3390.08 $20250.00
$1300,00 $1,750.00 $4,A50,00 $3.000.00
750.00
$450.00 $430:00 $900.00
$I -50:00 $130:00 $450.00
""0 $50.00 $225.00
$50.00 $5&00 $150.00
$4300:00 V'500.0 $3,000.00
$500,90 $- 500:80 $1125.00
$3;000:00 $3,000,00 $3,500.00
$1,000.00 $1,000.00
$4,000:00 $4.500.00
$29;008.90 $29;000:09 $30,000.00
$k308:00 $1;730:80 $1,7 -58,00 $2,000.00 $3,000.00
$230:90 $300.00 $500:00 $730.00 $1,125.00
Page 15 of 25
$5,250.00
$1,500.00
Res, No. 44 -08 -1979
25 LDC Text Amendment I
(General standard, misc. $3.000.00
provision
26 LAC Text Amendment 11
(Change Permitted use $6,000.00
Schedule
27 TEMPORARY SIGNAGE $3-5 0 $35:00 $33:00 $50:00 $75.00
SERVICES
28
Banner over Public Street
$300.00
29
Newsrack Application Fee
5$ 0.00
30
Zoning & Land Use
75.00
Verification Letter
31
Permanent Generator
100.00
Application
32
Request For Microfilm
$35.00
Research
33
Microfilm Reader Printer
92A0
Copies
34
Portable On Demand
$150.00
Storage
35
Official Zoning Map Color
$15.00
36
Small Official City Map
$5.00
37
Land Use Color Mao
$5.00
38
Custom GIS Mao
$15.00
39
Land Development Code
$75.00
40
Comprehensive Plan
$50.00
41
Hometown Regulations
$5_00
42
Census Data Packet
$3.00
43
Single Side Copy
$0.15
44
Double Side Copy
$0.30
45
'TREE REMOVAL $400 $40.00
$40.00 $50.00 $75.00
PERMIT
(1)
Year
1 OTHERFEE
2 MN-iNAJM FEE
2001 2002 2003
Page 16 of 25
2004 2008
150.00
Res. No. 44 -08 -1979
3 PERMIT EXTENSION $50.00 fora 60
FEE dau period
4 REINSPECTION $65.00
5 CCHANGE RACTOR 30 % of the
original pennit
fee. $65.00
minimum and
$250 maximum
6 TIIRESOLD BUILDING
INSPECTIONS
$100.00
7 Special Request For After
Hours Inspection
$100.00
8 Revisions to Approved
$25.00 Per sheet
Drawings
9 Plan Review
$50.00 review
after 2nd
rejection. $75.00
additional review
10 Shop Drawing Review
$100.00
11 ADD; After the fact permit fee: For any work described for above fee's performed with0out proper permits
and inspections, quadruple the above fees.
12 INSTALLATION OR
REPAIR OF SANITARY
SEWERS,
WATERLINES, GAS
LINES AND OTHER
UNDERGROUND
UTILITIES
13 0 to 100 linear feet $75.00
$125.00
14 Each additional 100 linear
feet or fraction V-5:00
$50.00
15 EXFILTRATION
DRAINS CONSISTING
OF CATCH BASIN,
EXFILTRATION
TRENCH OR SLAB
COVERED TRENCH
16 0 to 100 linear feet $75..00
$85.00
Page 17 of 25
Res. No. 44 -08 -1979
17 Each additional 100 linear
feet or fraction $25'00 $50.00 $50.00
18 INSTALLATION OR
$40.00 for each
REMOVAL OF POLES,
Installation or
DOWN GUYS,
removal of poles,
ANCHORS, SPLICE
Down auvs,
PITS, MANHOLES OR
Anchors, splice
FIRE HYDRANTS each
pits, manholes or
unit
fire hydrants.
19 SIDEWALKS, CURB $65.00
AND GUTTER
20 for additional - 50 ft im 00
21
DRIVEWAYS, Each
$135.00 per
approach
approach
22
ASPHALT PAVING
$200.00 0 -30 yd'
23
ERECTION OF STREET
Signals
$300 -00
NAME OR W.00
$15.00 $15.00
intersection per
DIRECTIONAL SIGNS,
upgrade de or
each sign
31 Upgrade or modification
24
CONSTRUCTION OF
IL -00. 0-
BRIDGES
1000 FT2
25
Add 100ft2
'230.00
26
PERMANENT TRAFFIC
BARRICADES
GUARDRAILS AND
GUIDEPOSTS
27
each 100 linear feet or
$75.00 85.00
$5000
fraction
28 CULVERTS
29 Each linear foot of pipe or $5.00
$10.00 $10.00
fraction
30 TRAFFIC SIGNALS, each
$1,710.00 /Per
intersection
intersection.
(New traffic
Signals
$300 -00
$1,114.00 /Per
,1
intersection per
upgrade de or
modifications
31 Upgrade or modification
$1-114.00
Page 18 of 25
Res. No. 44 -08 -1979
32 BUS SHELTERS, Each $100:00 $115.00
33 EXCAVATIONS FOR
UNDERGROUND
CONSTRUCTION
34 0 to 250 sq. £t $75.00 $100:00 $125.00
35 Each additional 250 sq. ft. $25 99 $50.00 $50.00
or fraction
36 LANDSCAPING (includes
hedges, groundcover &
other; sod not included)
37 0 to 250 sq. ft. $50.00 $75.00 $200.00
38 Each additional 250 sq. ft. $ g.gg $35-00 50.00
or fraction
39 Tree, each $25:00 $35.00 $35.00
40 TEMPORARY CRANE,
$100.00 Flat fee
TRAILER, OR TRUCK
per day for first 5
ON THE RIGHT OF
days ( and every
WAY
five days or
fraction thereof
after)
41 TEMPORARY PUBLIC $125.00 Per each
RIGHT -OF -WAY USAGE 50 ft' and $75..00
( PER EVERY 24 HOURS $1, 500.00
for additional
INCLUDING SPECIAL
SOft�
EVENTS
CODE ENFORCEMENT DIVISON
Year 2001 2002 2003 2004
1 Notice of Civil Infraction
n/a
2 Notice of Lien letter
n/a
3 Liens
n/a
4 Satisfaction of Liens
n/a
Page 19 of 25
2008
$25.00 Late
charge fee after
due date
$50.00 Late
charge fee after
due date
$50.00 Search
fee
$25.00
Preparation Fee
Res. No. 44 -08 -1.979
5
Special Master Orders
$50.00
n/a
Reinspection Fee
6
Portable signs
$25.00 Premitted
signs be
n/a
expanded ex.
"Open House"
premit fee
7
Portable illegal signs
$25.00 Removal
n/a
Fee
8
Records research
$1.00 minimum;
n/a
$5.00 maximum
9
Special Master Hearings
$100.00 Court
cost and
$75.00
Adminisirive Fee
10
Schedule of Pines
$200.00 Class I -
V 50:80
I st offense
11
Schedule of Fines
$450.00 Class III
$325.0
- 2nd offense
12
Schedule of Fines
$450.00 Class V
$350.00
- 1st offense
13
Schedule of Fines
$500.00
minimum;$1000
$350.00
maximum Class
17V - Illegal
dumping
14
Garage Sale
Recommendation-
to charge $20.00
for 2 days. Fail to
have permit first
will receive a
n/a
courtesy notice.
Second time
without a permit
will receive a
$150.00 fine
Page 20 of 25
Res. No. 44 -08 -1979
1 Lobbyist y, $500.00
CENTRAL SERVICES
2
Roll
$10.00
$12.00
3
Digital
NO SVS
$15.00
4
BACKGROUND
PUBLIC WORKS
CHECKS
16
5
Background Checks
$15.00
$15.00
6
PASSPORTS
$25.00
$25.00
7
PHOTOS
$36.00 $40.00
20
8
SPECIAL EVENTS
9
DEPOSITS
$600 deposit with
a $500 refund
(cost for
administrative
processing fee)
10
APPLICATION PEE
$60.00 non
refundable
I 1
MOVIES
recommending to
charge $100 non
refundable fee for
a 30 day permit
12 MAN POWER
13
BANNER
$300.00
14
POLE BANNER (PER
$100.00
10)
15
PUBLIC WORKS
HOURLY RATE
16
NON - SUPERVISOR
$36.00 $40.00
17
SUPERVISOR
$42,00 $45.00
18
POLICE HOURLY RATE
19
OFFICER
$36.00 $40.00
20
SUPERVISOR
$42:08 $50.00
Page 21 of 25
Res. No. 44 -08 -1979
1 Residential Use (Apartments Only)
2
100 up to 5 Units $86.82
$86.82 $91.00
3
1016 to 50 Units $150.50
W0.50 $158.00
4
102 51 to 100 Units $23 i.53
$23 L53 $243.00
5
103 101 to 200 Units $ 89:4-1
$289:4 -1 $303.00
6
104 201 to More Units &344-29
$-347.29 $364.00
7
Public and Institutional
$868 $911.00
8
201 Up to 1,000 SQ FT $115.76
$11646 $121.00
9
202 1,001 to 3,000 SQ FT V7345
$i 3AS $182.00
10
203 3,001 to 10,000 SQ FT $231 -53
$23i.53 $243.00
11
204 10,001 SQ FT & Over $-277A3
$277.83 $292.00
12 Business and Professional
13 301 Sole Proprietor $150.50
$-150:50 $158.00
14 302 2 to 9 Employees $231.53
$2-3i.5-3 $243.00
15 303 10 to 24 Employees $319:07
$3 i 907 $335.00
16 304 25 or More Employees $40547
W& P $425.00
17 Retail and Wholesale Trade
18
401 up to 1,000 SQ FT V50.5
$150-50 $158.00
19
402 1 , 0001 to 2,000 SQ X31 -3
&131,54 $243.00
26
FT
&299-4 $303.00
20
403 2,001 to 5,000 SQ FT $405.17
$44064 $425.00
21
404 5,001 to 15,000 SQ FT $578.81
$578.8i $607.00
22
405 15,000 SQ FT & Over $868.22
$868 $911.00
23 Transportation, Warehousing & Communications
24
501 Minimum Rate $253
$231:53 $243.00
25
502 10 to 25 Employees $26046
$260.46 $273.00
26
503 26 or More Employees $-289.41
&299-4 $303.00
27
504 7,500 to 20,000 SQ FT
an Additional $2924
$29.24 $30.00
28
505 20,001 SQ FT and
Over an Additional $57.89 $57.89
$5749 $60.00
29 Manufacturing & Intensive Uses
Page 22 of 25
Res. No. 44 -08 -1979
30
Minimum Rate
$260.46
$260:46
$273.00
31
7,500 to 15,000
$289.4}
Z99- .4
$303.00
32
15,001 to 25,000 SO FT
Q,
°'H4-3-5
$334.00
33-
25,001 to SO FT and Over
$347,29
$347,29
$364.00
34
Coin Operating Machine
$34.73
$3443
$36.00
35
LIEN SEARCHES 24
Hours
$-300
$30=08
$60.00
36
LIEN SEARCHES 48
$45.00
Hours
37
LIEN SEARCHES 72
$20 -00
$20.00
$20.00
Hours
38
Parking Permits per Month
$53.50 per
$53.50 per
Month
Month
$53.50
40
Garage Sale Permit
Fail to get a
permit first time
will be close
Recommending
down and a
a $ 20.00
$20.00
courtesy notice
charge for two
will be send out.
days.
Second time
without a permit
will be fine
$150.00
(The portion below (Parks/Recreation) was deferred at the meeting of 10/07/08)
PARKS AND RECREATION DEPARTMENT
2
Easketbakl
(res)$25
(res)
Olen) $-58
(nen)$59
3
Feetball
(r-es) $30
$75
Ores}
$85
4
Seeee
(nen)
(res) $25
(Hen)
(res) $25
-5
T.....,..1; «.. C�....,.
vc�r
(Ron) $50
n/@
(nenj $-50
n/a
7
Temis
*$M
2 -5
/ res
/(Fes,
- -8
C3he. g
[(re}$9
(�Sp5
75
()50
res$
9
Gyffmasttc-s
Wa
rtfa
40
Baseball
(e)$25
[(on)
oes$m
14
True!
$50
(flofl)$23
/
(fle),$tl
(nen)$ 2-5
4-2--
Ranee
\. en) $50
n/a
(Ron) $5
3D4a
173
Martial Atte
$35 $45
$35—$43
Page 23 of 25
Res. No. 44 -08 -1979
44 Qi+Seeuts free free
m
4-7 4effitals (fes) 100ff E €es�`
(tion) a (aen)42QOA -r
49 Field- ReRtals (""" ) $2 (fes�436 B,
ir.,
IL.,
CWT IM
24- A ftpr S pb g res - t5' (�es}4k
(BOB)
22 Gamps
2-3 Steer (Fes) Q k (m*S30/wk
(non) $50/wk (rtea)4 0A
24 Sgr-iag (Fes) $'25/w (-resj y-30Aaeek
(xex)$50fweek (aex)Whveek
23 cx (res) $50 e (reS4460 /two
jai weeks (haft)
$1001twe weeks MOAwe -weeks
26 Day - $54-W $5-/$i
2-7 Haliday r_,,,., Quay
(sen)-$4�y (non)-$1alday
Page 24 of 25
Section 2. If any section, clause, sentence, or phrase of this ordinance is for any
reason held invalid or unconstitutional by a court of competent jurisdiction, the
holding shall not affect the validity of the remaining portions of this ordinance.
Section 3. All ordinances or parts of ordinances in conflict with the provisions
of this ordinance are repealed.
Section 5. This ordinance shall take effect as of October 1, 2008
PASSED AND ADOPTED this '` 64 day of 2008
ATTEST:
?�TY C C
APPROVED:
dr A- a--�
MAYOR
First Reading— 9 -02 -08
Second Reading- 10 -07 -08
COMMISSION VOTE: 5 -0
READ AND APPROVED AS TO FORM: Mayor Feliu:
Yea
Vice Mayor Beasley
Yea
__--- Commissioner Wiscombe
Yea
".--
Commissioner Palmer
Yea
_
CITY ATTOAEY Commissioner Beckman
Yea
Additions shown by underlinine and deletions shown by o•�er. Wl• °-g
Page 25 of 25