Ord No 07-10-2032ORDINANCE NO. 07 -10 -2032
AN ORDINANCE OF THE MAYOR AND THE CITY COMMISSION
OF THE CITY OF SOUTH MIAMI, FLORIDA RELATING TO THE
FEE SCHEDULE; AMENDING ORDINANCE 21 -09 -2013 TO
AMEND TEMPORARY FULL ROADWAY AND SIDEWALK
CLOSURE PERMIT FEES SCHEDULE, PROVIDING FOR
SEVERABILITY, ORDINANCES IN CONFLICT, AND AN
EFFECTIVE DATE;
WHEREAS, On September 15, 2009 the City Commission approved ordinance
no. 21 -09 -2013 increasing, adding and deleting permit fees from the permit fee
schedule; and,
WHEREAS, the City administration has received several complaints from City
merchants and residents in regard to the increased cost of temporary full road and
sidewalk closure permit fees; and,
WHEREAS, the Mayor and City Commission have requested to review the
schedule of fees and to make the necessary adjustments.
NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA:
Section 1. Ordinance 21 -09 -2013 is amended by this Ordinance by modifying the
section saying "Full Roadway and Sidewalk closure..." as follows:
(I) PUBLIC WORKS AND UTILITIES FEES
nrmr r- WAIT OF
40 TEMPORARY ro,�� =����- �1 >588:88
$125.00 Per eae Q»c nn n eaeh cn r+z
�� »�
WAY v r to n GE (PE VERY 24
50 fl-2 and $75-88 and $75.00 for- addifienal
HQU ce n.T�DINo_�r enE�
for additional -8"2 L1 00 for 0 LF. to
Ems)FULL ROADWAYAND
5W2 50 LF. ofroadwav;
SIDEWALK CLOSURE (NO SINGLE
$2.500.00 for >50 LF to
LANE ROADWAY CLOSURE
300 LF; $1.000.00 for
PERMITTED) SPECIAL EVENT -(8)
every additional 50 LF or
HR PERIOD MAX. INCLUDING
action of roadway
TIME FOR SETUP(EXCLUDES
length.
CITY EVENTS AND F_VENTS
FUNDED BY THE CITY)
Combined permit fee for
items 40 & 41 shall not
exceed $10,000.00.
41 TEMPORARYSIDEWALK
$75.00 Per each 25 AP or
CLOSURE (PERMIT REQUIR
fractio n
FRENCH BARRICADES ALONG
CURB OR EOP) FOR SPECL4L
Combined permit fee for
EVENT -(8) HR PERIOD MAX..
items 40 & 41 shall not
INCLUDING TIME FOR SETUP.
exceed $10,000.00.
(EXCLUDES CITYEVENTSAND
EVENTS FUNDED BY THE CITY)
Page 1 of 2
Ord. No. 07 -10 -2032
Section 2. If any section, clause, sentence, or phrase of this ordinance is for any
reason held invalid or unconstitutional by a court of competent jurisdiction, the holding
shall not affect the validity of the remaining portions of this ordinance.
Section 3. All ordinances or parts of ordinances in conflict with the provisions of
this ordinance are repealed.
Section 4. This ordinance shall take effect immediately.
PASSED AND ADOPTED this 1 6tt41ay ofFebruary_> 2010.
ATTEST:
C0T��
TY CLERK
MAY 2
READ AND APPROVED AS TO FORM
COMMISSION VOTE: 4 -0
AND S CIENCY:
Mayor Stoddard: Yea
Vice Mayor Newman: Yea
Commissioner Palmer: absent
Commissioner Beasley: Yea
CITY ATTORNEY
Commissioner Harris: Yea
1st Reading: 2/2/10
2nd Reading: 2/16/10
Additions shown by underlininlr and deletions shown by evete .
WAMy Documentstresolutions \Ordinance schedule permit fees roadway & sidewalk closure.doe
Page 2 of 2
A��
South Miami
bAd
A9ilntetfcaC'
CITY OF SOUTH MIAMI till.
H2Y
OFFICE OF THE CITY MANAGER Zoos
INTER - OFFICE MEMORANDUM
To: The Honorable Mayor Feliu and Members of the City Commission
Via: Roger M Carlton
Acting City Manager
From: Rodolfo de la Torre
Assistant Public Works Director
Date: February 2, 2010 Agenda Item No.:
Subject: Amendment to Schedule of Fees
Ordinance: AN ORDINANCE OF THE MAYOR AND THE CITY COMMISSION OF
THE CITY OF SOUTH MIAMI, FLORIDA RELATING TO THE FEE
SCHEDULE; AMENDING ORDINANCE 21 -09 -2013 TO AMEND
TEMPORARY FULL ROADWAY AND SIDEWALK. CLOSURE PERMIT
FEES SCHEDULE, PROVIDING FOR SEVERABILITY, ORDINANCES
IN CONFLICT, AND AN EFFECTIVE DATE;
Request: Authorizing.a revision to schedule fees.
Reason/Need: After the adoption of our current fee schedule last year, the City received several
concerns from the merchants and resident as to the increased cost of permit fees for "Temporary Full
Road and Sidewalk Closure..." such as 5 and IOK runs. As a result, the Commission requested the
Administration to review the schedule of fees and to make adjustments. In performing the review, we
have found that it is difficult to analyze an ordinance with more than 100 pages that encompass a wide
variety of fees in a brief period. Therefore a comprehensive review of special events that require road
closure is needed, including community workshops. .
Recommendations:
To maintain the present "Temporary Full Road and Sidewalk Closure..." permit fee schedule, as
approved by Ordinance 21 -09 -2013, with the modification that "Permit fee not to exceed $10,000.00."
The above modification is recommended in order to address large scale road closure and events similar
to 5K Twilight Run in a brief time and to ensure that a comprehensive review of the permit fees for
events that require road closures, is done intelligently and comprehensively. The analysis will include
further comparisons from other municipalities for similar road closures and will include community
workshops and consultation with the impacted event promoters.
Cost: N/A
Funding Source: N/A
Backup Documentation:
• Proposed Ordinance
• Ordinance # 21 -09 -2013
;N 5
to r'ee4 3
id F
G
_ W
a
Q
rL
z
j
N
0
N
T
—1
in
D
m
w
Z
F
O
W
U
O
z
:I
O
O-6 p U p
fi O
L LL y w 0
r d N LL C C
N N ?.
N
b o
D h Q I E
T E S N
M
T OY CO wL._
L T O O 0
U'— � � N O
a.
E . m- EO N
z m 2-0—
MM� F
54
s� o
G
x
N
O
d
m
2
d
N
d
N
G
Q
C
C m �
c O 0
t) o
IN
�
,.
n�>:p Em-
E�Ev@
o
O
.c°�ocE
qty
Ju
VCNO E"
z?yu'
U
3
vx
ta„Cmm B.
Q_
� o
NaM
Q
fF,
w�
_
�` h`
�FU�Eavt�wo
•AID
y�
5
9
�
m
Sgt° Sm
aw...
Z,w°
x:13.
m �
iU
�tl2
}
• •
• n
ur Z~
zwo¢
•
1 1
1
� 1 • ,
• •
i.' b
� 4
QE
;—
razz
.s
m^
F"
E.
yam v
aw °�
alIg
(W[�mmYtl
U =OZO
-°
p°
3
`O'�
�+O
W�.'°f�CE
°
QZCJyw
C
Co
3
a
Q
rL
z
j
N
0
N
T
—1
in
D
m
w
Z
F
O
W
U
O
z
:I
O
O-6 p U p
fi O
L LL y w 0
r d N LL C C
N N ?.
N
b o
D h Q I E
T E S N
M
T OY CO wL._
L T O O 0
U'— � � N O
a.
E . m- EO N
z m 2-0—
MM� F
54
s� o
G
x
N
O
d
m
2
d
N
d
N
G
Q
C
C m �
c O 0
t) o
f_ w
2 v
M6ON..ao•
Q!
r�
d}
3
d
Q,
pia
V
0Y
CR
0)
cif
O
Q h
r
W M
H
w E
M
r
.n.Aaenmaene�em Aas GUeuvm'swom enHenpp ➢yaeupou Aew noA'PNO�pW o8ed pue Nepey! uo p�meH Iw4W ay1 W pmeeddv p➢oylla4l muepHO on�sWpueo rt pvppwJda) (tl)loay$ -e pYi
,_..__ _.... ... g :edfi do
:uo, d osep M58 1 IoD 1
•pealms /SoMe'D smgN :euozle6e&uolloes O'SXZ :Oz!s
lwviw Hlnosdo kuD :AOSgfDAPV ZOUVLOO ❑OgwnN uoµiesul I
:aweN aueilO ZOZ6tagvs UegwnN PV
0402 /LO /ZO :a}ed uopeoilgnd
Ql��a�ttuB�a�l�
cc°J
�
p
n�>:p Em-
E�Ev@
!'
�5 W
O
.c°�ocE
qty
Ju
VCNO E"
z?yu'
U
3
vx
ta„Cmm B.
Q_
O OL
NaM
Q
p
w�
I'm J'm iim
�FU�Eavt�wo
�
0
4
5
9
�
m
Sgt° Sm
Osm-ro�
Z,w°
OzwO
>
iU
�tl2
}
pKO
F O T 3 a
Qa`Ew
ur Z~
zwo¢
°a
s°I
°m 0�c
Ova
QE
;—
razz
.s
m^
F"
E.
yam v
aw °�
alIg
(W[�mmYtl
U =OZO
-°
p°
Nai'i$�$xi
`O'�
�+O
W�.'°f�CE
°
QZCJyw
C
Co
3a
iJ
02O'�yf. aaZ2
4 s.2,
U V
V E>
Nmfi. q`
¢(J N'4s (Ii
UJO��NH
QCV
OEl
I
w
�"��O�G
ZO
QLLNfLLL
`�
C
jp'QHV EE m3
f_ w
2 v
M6ON..ao•
Q!
r�
d}
3
d
Q,
pia
V
0Y
CR
0)
cif
O
Q h
r
W M
H
w E
M
r
.n.Aaenmaene�em Aas GUeuvm'swom enHenpp ➢yaeupou Aew noA'PNO�pW o8ed pue Nepey! uo p�meH Iw4W ay1 W pmeeddv p➢oylla4l muepHO on�sWpueo rt pvppwJda) (tl)loay$ -e pYi
,_..__ _.... ... g :edfi do
:uo, d osep M58 1 IoD 1
•pealms /SoMe'D smgN :euozle6e&uolloes O'SXZ :Oz!s
lwviw Hlnosdo kuD :AOSgfDAPV ZOUVLOO ❑OgwnN uoµiesul I
:aweN aueilO ZOZ6tagvs UegwnN PV
0402 /LO /ZO :a}ed uopeoilgnd
Ql��a�ttuB�a�l�
MIAMI DAILY BUSINESS REVIEW
Published Daily except Saturday, Sunday and
Legal Holidays
Miami, MlamFDade County, Florida
STATE OF FLORIDA
COUNTY OF MIAMI -DADS:
Before the undersigned authority personally appeared
V. PEREZ, who on oath says that he or she is the
LEGAL CLERK, Legal Notices of the Miami Daily Business
Review f/Ida Miami Review, a daily (except Saturday, Sunday
and Legal Holidays) newspaper, published at Miami in Miami -Dade
County, Florida; that the attached copy of advertisement,
being a Legal Advertisement of Notice In the matter of
CITY OF SOUTH MIAMI - NOTICE OF PUBLIC HEARING
FEBRUARY 16, 2010
in the XXXX Court,
was published in said newspaper in the issues of
02/05/2010
Affiant further says that the said Miami Daily Business
Review is a newspaper published at Miami in said Miami -Dade
County, Florida and that the said newspaper has
heretofore been continuously published in said Miami -Dade County,
Florida, each day (except Saturday, Sunday and Legal Holidays)
and has been entered as second class mail matter at the post
office In Miaml in said Miami -Dade County, Florida, for a
period of one year next preceding the first publication of the
attached copy of advertisement; and afflant further says that he or
she has neither paid nor promised any person, firm or corporation
any discount, rebate, commission or refund for the purpose
of securing this advertisement for publication in the said
newspaper. /'*I
Sworn to and subscribed before me this✓
05 day of FEBRUARY A D. 2010
(SEAL)
V. PEREZ personally known to me
o- o" �,'anY r `v`i °kF - a TCNohfa ary.yr t Htom'.Mb?ar
mSa
s of Florida
or
y a^q My Corcison DD 79 :
Ii re607 /18/2
ORDINANCE NO. 21-09-2013
THE COMPLETE ORDINANCE
IS ATTACHED FOR REFERENCE.
(See Items 40 and 41 on Page 26 of 39)
ORDINANCE NO. 21 -09 -2013
AN ORDINANCE OF THE MAYOR AND TI-M, CITY COMMISSION
OF THE CITY OF SOUTH MIAMI, FLORIDA RELATING TO THE
FEE SCHEDULE; AMENDING ORDINANCE 44 -08 -1979 AND 55-
08 -1990 AS AMENDED BY ORDINANCES TO, INCREASING
SOME FEES, ADDING NEW FEES AND DELETING SOME FEES
FROM THE SCHEDULE, PROVIDING FOR SEVERALBILITY,
ORDINiANCES IN CONFLICT, AND AN EFFECTIVE DATE;
WHEREAS, the City has reviewed fees schedules for Miami -Dade County and
several municipalities; and,
WHEREAS, the City has found that fees for the County and other
municipalities are higher than those fees included in the South Miami Fee Schedule;
and,
WHEREAS, the cost of services for Planning; Building; Parks & Recreation;
Public Works; Central Services and other related fees has increased considerably in the
past year with new services being requested; and,
WHEREAS, the Mayor and City Commission desire to adopt a new Fee
Schedule allowing £ending which will cover the cost of services provided.
NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA:
Section 1. That Ordinance 44 -08 -1979 AND 55 -08 -1990, shall be. amended by this
Ordinances by replacing the Permit Fee /Fee Schedule with the amended Permit Feel
Fee Schedule as follows:
SCHEDULE OF FEES
Year 2002 2003 2004 2008 2009
(A). BUILDING PERMIT FEES
Minimum Fees for Building Permit
The Minimum fee of one hundred dollars ($100 00) for all residential permits and one hundred Rfty dollars
Q 150 OOH for all commercial permits is applicable to all items in the sections belovr.
I NEW $063 $G4&- pew -sq -0 $0.80 f 0 - 25,000 sq. ft.
CONSTRUCTION per sq. ft.)
(all roofed areas)
2
25,001 and over per
$0 58
&G607pef -sq. &.
Plus for 25,001 and over
sq. ft.
per sq. ft $0.70 per sa. ft.
3
NEW
$0.50 per sq. ft.
CONSTRUCTION,
RESIDENTIAL,
i
ADDITIONS
4
ALTERATIONS,
$A:75
63:80- Miniavam:
$0.75 per sq. ft.
1WROVEIv1ENTS
AND REPAIRS TO
BUILDINGS
5
GENERAL REPAIRS
$0.20
$6-5:00
$0.20 per sq. ft.
AND OTHER WORK
"Al'.- -$0.20
NOT SPECIFIED
per
ABOVE
sq. ft:.
6
INSTALLATION,
$9.00
$65.00
$9.00 each
ALTERATION OR
�14.-Hqdenuma A mid
REPAIR OF
$9.00 each
EXTERIOR
WINDOWS, DOORS
AND SHUTTERS
7
INSTALLATION,
$0.25
$0.25 Per sq. ft.
$0.25 Per sq. ft.
ALTERATION OR
REPAIR OF
CURTAIN WALLS
OR STORE FRONTS
8
WOOD DECKS,
$0.20
$65.09
$0.20 per sq. ft.
WALKWAYS,
Iv€ium $()2$
SCREEN
Pff
ENCLOSURES,
POOL DECKS,
AWNINGS,
CONCRETE SLABS
AND CANOPIES
Ord. No. 21 -09 -2013
Page 2 of 39
9 PARKING LOTS
AND DRIVEWAYS
10 ROOFING
1I FENCES, WALLS,
A/C SCREENS AND
RAILINGS
I2
PARKING LOT
minimum-W-5
SEAL COATING
$0:40 $65:00
Minimum $0.10
AND STRIPING
13
PART', ING LOT
Minimam $0.50
SEAL COA'T'ING
per LY
AND STRIPING
14
SWIMMINGPOOLS
15
DEMOLITION
16 Each additional 1.000
sq. ft. or fraction
17 PAINTING,
SANDBLASTING
OR STEAM
CLEANING
(Commercial only)
18 SIGNS, each
19 MOVING
BUIDLING OR
STRUCTURE
20 TEMPORARY
BUILDING
21 EXTERIOR
WINDOWS, DOOR,
SITU'ITERS
$0.15 $6500
$0.15 per sq. ft..
minimum-W-5
$0:40 $65:00
Minimum $0.10
L25 sq. ft
peer
$0.50 $6-5:00
$0.50 per linear foot
Minimam $0.50
per LY
$46;00 $65.00
$0.15 per sq. ft.
Minimum $0.15
per sq. ft.
$10.00 $I0.00 (Each additional
1,000 sq. ft. or fraction)
$125.00 $12"o $300.00 each
$75.80 $0.50 (0 to 1000
Msttintam$0:85 Per sq. ft. 3
fe"t-&-
$15.00
$75.00
;, i$
Ord. No. 21 -09 -2013 Page 3 of 39
$30:00 $, O—M
$75,00 $75.00 each
Mwmu
$0 20 per Q. ft
Minimum $0.14
Pef sq,
$65.00 $0.20 per sq, ft.
minimum $0.20
per sq. fr.
$66.00 $9.00 each
Mittirnam
$9.00 each
22
TEMPORARY
$Fr5:80
$150.00 each
PLATFORMS .
Mi fti...Rffn $$00.22
Pe"q.4
23
ORNAMENTAL
$-18038
$0.10 per sq. ft
MON
minkaen3
$0.10 per sq. ft.
24
-EPJA I-AL -80
f�i3l?O- I'�b9A4
"LIG SAYET-�
25
FOR SAFE
REASONS
PILE DRIVING
$65.00 for first
$65.00 for first pile
pile $20.00 for
$20.00 for additional pile
additional pile
26
ANY OTHER WORK
$10.00 per
$10.00 per 1,000 of
NOT COVERED
$1,000 of
construction cost.
construction
cost.
27
A/C SCREENS,
$65:00
$0.30 Per L.F.
MASONRY
Nfiaimutn $0.30
FENCES,
Per L.F.
RETAINING WALL
& RAILING
28
LANDSCAPING
$10.00 Each
$10,00 each Tree
TREES
Tree
29
LANDSCAPING
$25.00 per 100
$25.00 (per 100 LY
HEDGES
L.F. or
or additional fraction.)
additional
fraction
30
LANDSCAPING
$20.00 PER 100
$20.00 (per 100 sq, ft.
GROUND COVER
sq. ft. Or
or additional fraction)
additional
fraction
31
FOOTING FOR
$7.50'
$7.50
POLES
32
REINSPECTION
$50.00 $50.00
$50.00
FEE
Ord, No. 21 -09 -2013 Page 4 o €39
(B) PLUMBING PERMIT TEES
Ord. No. 21 -09 -2013 Page 5 of 39
Maim Eee (orPlumbink t'ermit
The Minimum fee of one hundred dollars
($100 00) for all residential permits and one hundred fifty dollars
($150 00) for atl commercial �rmits is applicable
to all items in the sections below.
Year 2002 2003 2004
2008
2009
33
SANITARY
$100.00
$100.00 Each
$100.00 each
SEWERS Each
connection
34
WATER SERVICE
$75.00
$75.00
$75.00
35
First Sub-meters
$25.08
$40.00
$40.00
36
Sub - meters each
$8.50 each
$8.50 each
additional
37
SANITARY SEWER
COLLECTION
SYSTEM INSIDE
PRIVATE
38
PROPERTY
Each 50 feet, or
$30.00
$30.00
$50.00 (each 50 feet, or
fraction
fraction)
39
each manhole
$50.00
$50.00
$50:00 each manhole
40
Sewer capping
$50.00
$50.00
$50.00 each sever
moping
41
Sump pump
$100.00
$100.00
$I00.00 each sump pump
42
Repairste- sewee-4aP
a�- etl�'vraste -1ir� '.
$100.00
$100.00
$100.00 repairs
43
STORM SEWER
44
Each roof drain inlet
$15.00
$15.00 each
45
Catch basin or area
$50.00
$50.00
$50.00 each
drain
46
Soakage pit, trench or
$25.00
$25.00 each
French drain
47
0 to 50 linear ft. or
$50.00
$20.00
$20.00 (0 to 50 linear ft.
fraction
or fraction)
48
Each additional, linear
$25.00
$25.00
$25.00 (each additional,
50ft. or fraction
linear 50ft. or fraction)
Ord. No. 21 -09 -2013 Page 5 of 39
49
Storm Sewer Capping
$30.00
$30.00 each
50
A/C CONDENSATE
$28 80 $a5. �
$30.00 each
'DRAINS per unit
58
Sub - meters, each
51
WATER PIPING
$65.00 each
59
52
Water Main 0 to 50
$100.00 $100.00
$100.00 (0 to 50 linear
60
linear feet
$50.00
feet)
53
6Yater Piping
$1.00 $1.00 per linear
$1.00 (each additional,
feet
linear foot or fraction)
54 PLUMBING FIXTURES AND ANY
OTHER DEVICES INCLUDING A
SUPPLY AND /OR WASTE
CONNECTION
55 Set $10.00 $10.00 $10.00
56 Rough $10.00 $10.00 $10.00
57
LAWN SPRINKLER
SYSTEMS
58
Sub - meters, each
$25.00
$65.00 Each
$65.00 each
59
Sprinkler heads, each
$ 1.25 Each
$ 1.25 each
60
Water supply to
$50.00
$65.00 Each
$65.00 each
sprinkler
61
Zone Valves, each
&28:90
$25.00 ea eh
$75.00e
62
FIRE PROTECTION
63
Fire protection Jockey
$38:88
$75.00 each
Pump
64
Water supply to fire
$50.00
$50.00
$50.00
sprinkler system
65
Fire pump or
$100.00
$100.00
$100.00
domestic pump, new
or replacement
66
Each standpipe,
$50.00
$50.00
$50.00 each
Siamese or roof
marufold
67
Each hose rack of Fire
$25.00
$25.00
$25.00 each
Department outlet
Ord. No. 21 -09 -2013
Page 6 of 39
68
Each sprinkler head
$1.25
$125 each
69
Fire Hydrant
$40.00
$40.00
70
Backflow preventer
$60.00
$60.00
firelino
71
Fire protection flow
$40.00
$40.00
test '
72
Sump pump, re-
$65.00
$65.00
circulate, domestic
and vacuum pumps
73
INTERCEPTORS
AND SEPARATORS
74
Septic tanks, settling
$&"0
$75.00
$75.00 ( 0 to 150 gallons)
tanks, etc.
75
Each additional
$20A
$75.00
$75.00 (150 gallons, or
fraction over 750 gallons)
76
Drainfield relay;
$50:00
$75.00
$75.00 (0 to 100 sq. ft)
77
Drainfield relay Each
$20.00
$20.00
$20.00 (each additional
additional
100 sq. ft.)
78
SOAKAGE PTT
$50.00
$50.00
79
SWIMMINO POOLS
80
Swimming pool
$100.00
$100.00
$100.00
piping
81
Swimming pool and
$135.00 each
$135.00 each
Spa commercial
82
Swimming-pool
$50: -00
$65.00 each
$65.00 each
repairs
83
WELLS
$75.00
$75.00
$75.00 each
84
TEMPORARY
$40.00
$40.00 each
TOILETS
85
LIFT STATIONS
$300.00 each
$300.00 each
86
NATURAL GAS OR
$1 -3:08
$15.00 per
A LIQUIDFIED
$1,000 of
$15.00 per $1,000 of
PETROLEUM
construction cost
construction cost L.P. gas
L.P. gas tank,
tank, each
each
87
L.P. Gras Tank
$100.00
$100.00
$100.00
Ord. No. 21 -09 -2013
Page 7 of 39
� f
"Fi f • w _
89
WATER
TREATMENT
90
For first 1,000 of
construction value
91
each additional Value
of construction value
92
MEDICAL GAS
INCLUDING
VACUUM OUTLET
Piping fee for first
$1,000 of construction
value
Each outlet
y
Ord. No. 21 -09 -2013 Page 8 of 39
$75.00 $75.00
$25.00 $25.00
$25.00 $25.00 first $1,000 of
construction value.
$10.00 $10.00 each
(C) MECHAIVXCAL PERMIT X'E ES
Minimum rw for Mechanical Permit
The Minimum fee of one hundred dollars ($100.00) for all residential permits and one hundred ftfly dollars
150.00 or all commercial permits is a licable to all items in the sections below.
95 AIR
CONDITIONING
AND
REFRIGERATION
(1 ton=[ HP= 12,000
BTLD
96 0 to 5 ton
97 Additional ton
98 A/C CONDENSATE-
DRAINS
99 A/C Wall Unit
100 AlC ductwork first
$1000 value
102 A/C ductwork after
Zrst $1000 value
103
HFATI :^�
EQQUM&
TlDPTQQ_�n
41Ql
FIR -GBMPG
�m rr QL^\TTMFJ3
zzcrrcn xm.v -,
G n c�o1'cMED
104
STRIP HEATERS,
per unit
105
S At ip Heaters after
arst five
106
PAINT SPRAY
BOOTHS
107
Paint spray booths
2002 2003 2001 2008 2009
$50.00
$75.00 $75.00 Each unit
$18.00 $18.00 $18.00 Each additional ton
or fraction
$25.00 each $25.00 each
..
$25.00 each $25.00 each
$35.00 each $35.00 each
$15.00 each $15.00 each
$25.00 $25.00 per unit
$15.00 $15.00 each unit after first
five
$200.00 $200.00 $200.00
Ord. No. 21 -09 -2013 Page 9 of 39
108 Paint spray booths
109
INTERNAL
COMBUSTION
ENGINES, each
110
PRESSURE PIPING
III
First $1,000 of
constriction value
112
Each additional
$1,000 of construction
value
113
COOLING TOWER
114
MECHANICAL
VENTILATION
SYSTEMS
115
First $1,000 of
construction value
116
Each additional
$1,000 of construction
value
117
.FXREPLACEANU
BARBECUES
118
INSULATION, FM
vr� A/C
DUCTS,
PNEUMATIC
TUBESAND
CONVEYOR
SYSTEMS
119
First $1,000 or
fraction of
construction value
120
R4VIyAT4QN
,BOILERS AND
PRESSURE VESSELS
121
Rollers and pressure
vessels
122
GENERATOR
123
Generators each
$75.00 $75.00 each additional
100 sq ft
$75.00 each $75.00 each
$60.00 $60.00 Each $60.00 Each
$25.00 Each $25.00 Each
$200.00 $200.00
$40.00 $40.00
$20.00 $20.00
$35.00
$35.00
$100.00 $100.00
Ord. No, 21 -09 -2013 Page 10 of 39
$15.00
$100.00
$20.00 each
$200.00 each
$40.00 each
$20.00 each
$35.00 each
$35.00 each
$100.00 (each up to
100,000 BTU)
$15.00 (each additional
100,000 BTU)
$100.00 (Up to 50ICva)
$20.00 (each additional 5
KVA)
124
EXHAUST PANS
$50.00
$50.00
$50.00
125
.DRYER VENT
$2-"o
.20.00
126
KITCHEN HOODS
127
Commercial
$150.00
$150.00 each
Each
128
Residential
$25.00
$25.00 each
129
TR.45'FICXU7E
$50.00 Each
$50.00 each
130
WALK IN COOLER
$35.00
$35.00 each
131
PORTABLE
$35.00
$35.00 each
CHILLER
132nrr
»» »np;;nxr
$65.00
$65.00
$65.00 each
&YS-TEM POOL
133
LL E-4
L001 and Spa Heater
$60.00
$60.00 each
134
SMOKE CONTROL
$250.00
$250.00
SYSTEMS
(each smoke test)
135
STORAGETANKS
$150.00
$150.00 each
FOR FLAMMABLE
LIQUIDS
136
Piping or llamniable
$40.00
$40:00
li aids
137'
SMOKE
EV n nx r� xi�v1M1
PISPRCTION
BOILERS AND
PRESSURE
VESSELS $1-5
138
Annual re- inspections
$75.00
139
Re- inspection
$50.00
$50.00 each
Ord. No. 21 -09 -2013 Page 11 o£39
(D) ELECTRICAL PERMIT FEES
Minimum Fee for Electrical Permit
The Minimum fee ofone hundred dollars ($100 00) for all residential permits and one hundred fifty dollars
($150 0 for all commercial permiPS Ps applicable to all items in the sections below.
Year 2002 2003 2004 2008 2009
140 ROUGH WIRING $50.00 $50.00 $50.00 (1 to 10 outlets)
OUTLETS
141 $2.00 $2.00 each additional
outlet
142 SERVICES AND $20.00 $20.00 Each 100 amps or
FEEDERS, EACH fraction
143
144
Services and feeders,
$25.00
$25.00
101 to 200 amps
145
Services and feeders.
$30.00
$30.00
201 to 400 an2ps
146
Services and {ceders
$35.00 Each
$35.00 Each
40l to 600
147
Services and feeders.
$40.00 Each
$40.00 Each
601 to 800
148
' Services and feeders.
$15.00 Each
$15.00 Each
for each IQO'over 800
a_-.t?
149
Services and feeders,
$60.00 Each
$60.00 Each
temporary
construction
150
Services and feeders.
$75.00 each
$75.00 each
service repair or
meter ch &nee
151
Services and feeders
$75.00 each
$75.00 each
iemoorary for testing
152
Service temporary
$65,00 each
$65,00 each
153
Services and feeders.
$10.00 each
$10.00 each
renewal
154
SWITCHBOARDS
M0.00 $50.00
$50.00 each
100 amps or fraction
155 DZICTBANK $5.00 per L.F. $5.00 per L.F.
156 EQUIPMENT $25.00 each $25.00 .
MACHINE OR Residential each
Ord. No. 21 -09 -2013 Page 12 of 39
Ord. No. 21 -09 -2013 Page 13 of 39
SPECIAL PURPOSE
OUTLETS OR
PERMANENT
CONNECTIONS
157
$30.00 each
$30.00 Commercial each
158
CENTRAL AIR
$10.00 Per Ton
$10.00 per ton
CONDITIONING
159
Chiller per ton
$10.00 each
160
CLEAR NOLATXONS
$50.00 each
$50.00 each
FOR NEW TENANTS
161
MOTORS
162
0 to 5 HP
$15.00 $30.00 each
$30.00 each
163
6 HP and over, per HP
$2.50 each
$2.50 each 6 HP and over,
per HP
164
FIR EPLLMP
$60.00 each
$60.00 each
165
GENERATORS, TRANSFORMERS,
$10.00
$10.00 (0 to tOKW)
HEATING EQUIPMENT, STRIP
HEATERS, RECTIFIERS AND UPS
SYSTEMS
166
11 KW and over, per
$290 Each
$2.00 l l KW and over,
KW
per KW
167
SIGNS
$75.00 each up
$75.00 each up to three at
to three at the
the same location
same location
168
LIGHT FIXTURES
169
Parking lot Iight, per
$20.00 $20.00
$20.00
light
170
$20.00 $20.00 each
$20.00 each
Light poles, each
171
$15.00
$15.00(1 -10 sockets)
Li htfixtures
172
$10.00
$10.00 U -12 guoresceni}
&g-ht ixtures
173
$2.50 each
$2.50 (each over 101
Ltghtfixtures
174
Light fixtures varkinz
$20.00 each
$20.00 each
lots
175
LLfZR Aixtures adl
$2.50 'each
$2.50 each
others
Ord. No. 21 -09 -2013 Page 13 of 39
176
PLiIG1vI011>
$30.00
$30.00 (first 10 ft.)
177
Plugmold
$5.00
$5.00 (each additional 5
L.F after first 10 feet)
178
SATELLITE
$60.00 each
$60.00 each
ANTENNAE
179
BURGLAR ALARM
180
Installation, wiring
$60.00
$60.00 per system
and devices
181
Repairs, per system
$55.00
$55.00 per s y s tem
182
FIRE DETECTION
$150'.00 each
$150.00 each
SYSTEMS, per
system
j 183
TELEVISION AND
TELEPHONE
SYSTEMS
184
Masker Control
$50.00
$50.00
185
Device
$2.00
$2.00 each
186
SWIMMING POOLS
AND SPAS
187
Residential
$100.00 each
$100.00 each
188
Commercial
$85.00 each
$85.00 each
189
REINSPBCTIONFEE
$50.00 each
$50.00 each
Ord. No. 21 -09 -2013 Page 14 of 39
(E) CERTIFICATE OF USE, COMPLETION OR OCCUPANCY
Year 2002
190 Certificate of
Occupancy,
Residential
191 Certificate of
Occupancy,
Commercial, per story
192 Certificate of Use
193 Certificate of
completion, per story
194 Temporary Certificate
of occupancy or
Completion
195 Temporary Certificate
of Occupancy
Minimum Pee for other fees
2003 2004 2008 2009
$150.00 $150.00
$250.00 $250.00
$75.00 $200.00
$200.00 each $200.00 each
$250.00 each $250.00 (each per story
for first 30 days)
$-k00:8 4r -a-30 $250 00 ffor each thirty
da; geried (30) day extemion)
(F) OTHER FEES
Year 2002 2003 2004 2008 2009
UP FRONTFEE ISNOTRETURNABLE UNDER ANPCIRCUNSTANCES. IT WILL BE DEDUCTED FROMTI Z
TOTAL .PERMIT FEE WHEN THE I'ERMIT —JS ISSUED
196 :X F- $100 00 $100'00
197 Residential
198 C-eersial
199 py�-1��arpds RT
Bx4EN&x)N -M
Other ee
Ord. No. 21 -09 -2013 Page 15 of 39
200 Permit Card
replacement fee
201 Forty (40) year
certification fee
202 Information provided
related to building
matters
203 Fee for working on
Sundays and Holidays
204 Fee for researching
building department
records
205 Placing portable
storage units without
first obtaining a permit
first violation
206 Placing portable
storage units without
first obtaining a permit
second or repeat
violation
207 RE- INSPECTION
FEES
208 CHANGE OF
CONTRACTOR
a-
211 THRESHOLD
BUILDING
INSPECTIONS
Minimum two- three
hours per single
request.
$15.00
$250.00
$100.00
$500 each
$75 per hour
$250.00 First
offense
$500 Second
offense
$50.00 $50.00
Ord. N.o, 21 -09 -2013 Page 16 of 39
30 % o£ the
original permit
fee. $65.00
minimum and
$250 s a�cirr r
$125.00
$15.00
$250.00
$100.00
$500 each
$75 per hour
$250.00 First offense
$500 Second offense
$50.00 each
30 % of the original
permit fee. $65.00
minimum and .$500
maximum
$125.00 per hour
212 SPECIAL "QUEST $125.00 $125.00 $125.00 per hour
FOR AFTER HOURS
INSPECTIONS
.Minimum three hours
ber single request.
213 ADDITIONAL COSTS
214 in addition to the basic application fees listed, applicants shall pay for all reasonable costs incurred by the City b
processing said applications. These costs shall include, but not be limited to advertising, staff time and costs fo
qualified experts, such as, architects, engineers, planners, attorneys and others deemed necessary for the review ant
evaluation of an application. These fees shall be in addition to any other fees required by the City.
215 nVISIONS TO APPROVED
DRAWINGS
216 PLAN REVIEW
217 Review after second
rejection
218 Each additional review
219 Lost plan fee
220 SHOP DRAWING REVIEW
221 WORKING WITHOUT A PERMIT
222 Firsttime.offense
223 Second time offense
224 Third thm offense
!0,6; 00 $40.00 $40.00 per sheet
Ord. No, 21 -09 -2013 Page 17 of 39
$50.00 $50.00
$75.00 $75.00
30% of original Thirty (30) percent of
building permit fee original building permit
up to 500.00 fee maximum $500.00
$100.00 $100.00 each
$100.00 plus the
double of permit
fee, not less than
$165.00
Twice the double
permit fee plus
$200.00
$100.00 plus the double
of permit fee, not less
than $165.00
$200.00 plus double of
permit fees minimum
$200.00
Twice the double $500.00 plus twice the
permit fee plus double of permit fees
-904M minimum $1,000.00
(G) REFUNDS, TIME LIMITATIONS AND CANCELLATIONS
225 Fees charged for apeimit b , shall be refunded by the Building Official
subject to the following:
226 No refunds will be made on requests involving:
a) Permit fees of $200 or less.
b) Permits revoked by the Building Official
c) Permits canceled by court order
d) Permits which have expired
e) Permits under which work has commenced
f) The original permit holder when there is a change of contractor.
A full refund will be granted to a permit holder who takes out a permit covering work outside City limits.
a) A written request is submitted to the City prior to the permit expiration date; and
b) A validated copy of the permit is submitted with such request.
Ord. No. 21 -09 -2013 Page 18 of 39
(Ii) LAND. USE APPLICATION / PLANNING DEPARTMENT FEES
PLANNING BOARD FEES
Year 2002 2003 2004 2008 2009
I REZONING
2 Ten acres or less $1,750.00 $1,75080 $73900 . $6,000.00 $6,000.00
3 Overton acres $l 309:88 $3'r 59088 $20,250.00 $20,250.00
4 SPECIAL USE
PERMIT
5 APPROVAL BY
ENVIRONMENTAL REVIEW AND
PRESERVATION BOARD
6 Applications for new construction in
the RS and RT zoning districts
7 Single unit
8 All other applications
for:
9 New construction
10 Renovation
I1 Signs,, fences, walls, etc.
12 For each additional
appearance before the
Board
13 VARIANCES
14 First variance request
15 Each additional
variance request
16 PLANNED UNIT
DEVELOPMENT
17 CHANGES TO A
PLANNED UNIT
DEVELOPMENT
18 WAIVER OF PLAT
APPLICATION
Ord. No. 21 -09 -2013
$;,-,'-50:09 $17-50:00 $3,000.00 $3,000:00
mel
$:3;800:00 $3,500.00
$1,000.00
Page 19 of 39
$750.00
$900.00
$450.00
$225.00
$150.00
$750.00
$900.00
$450.00
$225.00
$ 150.00
$3,000.00 $3,000.00 first
$1,I25.00 $1,125,00 each additional
request
$4,500.00 $4,500.00
19
COMPREHENSIVE $20;000:00
$30,000.00
$30,000.00
PLAN
AMENDMENTS
20
SPECIAL $1,730:00 $1;730:00 $200 =00
$3,000.00
$3,000.00
EXCEPTION
4
$500.00 $30 0.0
_rA FWE
$1;125:00
22
PUD Major Change
$5,250.00
$5,250.00
23
PUD Minor Change
$.1,500.00
$1,500.00
24
LDC Text Amendment X (General
$3,000.00
$3,000.00
standards misc. provisions)
25
L_DC TextAmendment H& anee
$6,000.00
$6,000.00
Permitted Use Schedule)
26
TEMPORARY SIGNAGE $3-5:00 $35:00 $30.00
$75.00
$75.00
27
STI2.TS
Banner over Public Street
$300.00
28
NewsrackAMAcadon Fee
$50.00
$50.00
29
Zoning & Land Use
$75.00
$75.00
Verification Letter
30
Permanent Generator
$100.00
$100.00
Application
31
Request For Mi ofi
$100.00
$100.00
Research
32
Micro 271m Reader. Printer
$12.00
$12.00
Conies
33
$130:00
$ 130.00
34
O foial Zonft Map CoZor
$15,00
$15.00
35
Small O zcial Qbt Map
$5.00
$5.00
' 36
Land Use Color Map
$5.00
$5.00
Ord. No. 21 -09 -2013 Page 20 of 39
37
Custom GISMan
$15.00
$15.00
38
Land Develoament Code
$75.00
$75.00
39
COMPM ensive Plan
$50.00
$50.00
40
hometown Regulations
$5.00
$5.00
41
Census Data Packet
$3.00
$3.00
42
Single Sz Covv
$0.15
$0.15
43
Double Side Coon
$0.30
$0.30
44
TREEREMOVAL MOM $40:89
$50.00 $75.00
$75.00
PERMIT
45
Alcoholic bevera Se license
$250.O
aoplicatien processing
46
4Weal ofERPB decision
$100.00
47
Condominium conversion
9 000.00
letter
48
DRI (Development -of
25 000.00
ReXionallmpactl Plus:
49
Residential
07
50 50
Non - residential
so.l0lsfGFA
51
Mired use
$0.10 /sfGFA
52
DRl 912–nrequest
s0075 /sfGFAofareaof
—
&@ 390 Substantial
ahange
Change
53
'DRI exemnt%n request Plus:
�25.00OA0
SB 360
Residential
s0.0751s
Non - residential
SO. I0 /sfGFA
Mixed use
$0.I0 /sfGFA
Ord. No. 21 -09 -2013 Page 21 of 39
54 Miami -Dade County sien
pracessin
55 PlatAntvroval:
56
Tentative Plai.
57
O'inal plat
58
TemMraryStoraze Unit
PODS
59
Residential
(maximum size o 8X 16
feet, per 14 day veriod
60
Non- Residential
(maximum size of 8X32
66
eet per 30 day period)
61 Request to vacate street
alley, easement or other
ubp Rc space
62 Restrictive covenants .
easements or development
agreements
63
Modification or release of
restricttve covenants
easements or development
agreements
64
each extension request for
Special Use, Special
AWtlom Variance
65
Unity of title or release of
unity Ofa*
66
Pole banner (rver 191
Ord. No. 21 -09 -2013 Page 22 0£39
E.
$100.00
$5.000.00
$4 000.00
$50.00
$150.00
$3.000.00
$5.000.00
$500.00
$500.00
$1.500.00
$300.00
(ii) PUBLIC WORKS AND UTILITIES PEES
Year
I OTHER FEE
2 MINIMUM FEE
3 PERNffT EXTENSION
FEE
4 REINSPECTION
5 CHANGE OF
CONTRACTOR
7 Special Request For After
Hours Inspection
2002 2003 2004 2008
2009
$150.00
$150.00
$:50:00-fFar-a-6A
$150.00 f r a 60 day
da"er-ied
ep riod
$65.00
$65.00
30 % o£ the
30 % of the original
original permit
permit fee. $65.00
fee. $65.00
minimum and $250
minimum and maximum
$250 maximum
$100.00
8 Revisions to Approved $25.00 per sheet
Drawings
9 Shop Drawing Review $100.00
10 ADD; After the fact permit fee: For any work described for above fee's performed without proper permits and
inspections, quadruple the above fees.
I 1 INSTALLATION OR
REPAIR OF SANITARY
SEWERS,
WATERLINES, GAS
LINES AND OTHER
UNDERGROUND
UTILITIES
12 Oto 100linearfeet SdI?0:00 $125.00 $125.00
13 Each additional 100 linear S4"0 $50.00 $50.00
feet or fraction
Ord. No. 21 -09 -2013 Page 23 of 39
14 EXFILTRATION
DRAIN'S CONSISTING
OF CATCH BASIN,
EXFIi.TRATION
TRENCH OR SLAB
COVERED TRENCH
15 0 to 100 linear feet
16 Each additional 100 linear
feet or fraction
17 INSTALLATION OR
REMOVAL OF POLES,
DOWN GUYS,
ANCHORS, SPLICE
PITS, MANHOLES OR
FIRE HYDRANTS each
unit
18 SIDEWALKS, CURB
AND GUTTER. per every
100 linear feet or kaetton
20 DRIVEWAYS, Each
approach
21 PAVING each
22 ERECTION OF STREET
NAME OR
DIRECTIONAL SIGNS,
each sign
23 CONSTRUCTION OF
BRIDGES
24 Ad&440ft2 Each
additional IOOfP of
fi:action
25 PERMANENT TRAFFIC
BARRICADES
GUARDRAILS AND
GUIDEPOSTS
Ord. No. 21 -09 -2013 . Page N of 39
$$5.00
$50.00 $50.00
$40.00 for each
Installation or
removal of poles,
Down guys,
Anchors, splice
pits, manholes or
fire hydrants-
$85.00
$50.00
$40.00 for each
Installation or removal of
poles, Down guys,
Anchors, splice pits,
manholes or fire hydrants.
$65.00 $65.00
$135.00 per $135.00 per approach
approach
$200.00 0 -30 yd2
$40.00 additiona1100
square yards or action
$15.00 $15.00
$1,140.00; 0- $1,140.00; 0 -1000 FT'
1000 FT'
$230.00 $230.00
26 each 100 linear feet or
fraction
27 CULVERTS
28 Each linear foot of pipe or
fraction
29 TRAFFIC SIGNALS,
each intersection
30 Upgrade or modification
31
BUS SHELTERS, Each
32
EXCAVATIONS FOR
(New traffic
UNDERGROUNI?
Signals)
CONSTRUCTION
33
0 to 250 sq. ft
34
Each additional 250 sq. ft.
upgrade or
or fraction
35
LANDSCAPING
(includes hedges,
groundcover & other sed
irielWed)
36
aiet
0 to 250 sq. fr.
37
Each additional 250 sq. ft.
or fraction
38
Tree, each
$7 -5.00 $85.00 $85.00
$10.00
$10.00
;5M
! t
$1,710.00/Per
$1,710.00 /Per
intersection.
intersection. (New traffic
(New traffic
Signals) $1,114.001per
Signals)
intersection per upgrade
$1,114.00 /per
or modifications
intersection per
upgrade or
modifications
$1,114.00 $1,114.00
$115.00
$125.00
$50.00
$75:00 $200.00
$15:80 $50.00
$35.00 $35.00
Ord. No. 21 -09 -2013 Page 25 of 39
$115.00
$125.00
$50.00
$200.00
$50.00
$35.00
39 TEMPORARY STAGING
$100.00 Flat fee
$100.00 Plat fee per day
AREA, CRANE,
per day for first 5
for first 5 days ( and
TRAILER, OR TRUCK
days ( and every
every five days or fraction
ON THE RIGHT OF
five days or
thereof after)
SAY
fraction thereof
HR PERIOD R4X IJVCL
fraction ofmadway
after)
lei
40 TEMPORARY �k -500 =00
° _ "" " "
rYrnv�act>ctrw�
50 0-2 x_$75 -00- ,
.
£er- additional -50$1.5fFo
EVENTS}FULL ROADWAYAND
302 50 LF oftoadwayi
SIDEWALK CLOSURE (NO SINGLE
$2,500.00 for >50 LF to
LANE ROADWAYCLOSURE
300 LF, $1.000.00 for
PERMXTTED) SPECML EVENT' (8)
every additional SO LF or
HR PERIOD R4X IJVCL
fraction ofmadway
TIME FOR SETUP(EXCLUDES
lei
CXTYEVENTSANDEVENTS
FUNDED BY THE CITY)
41 TEMPORRRYSXDEWALK J75.00 Per each 25 ft2 or
CLOSURE (PERMIT REQUIRES kaClion
FRENCHBARRICADESALONG
CURB OR EOP) FOR SPECIAL
EVENT -(8) HR PERIOD MAX:.
INCLUDING TIME FOR SETUP
aKCLUDES CITYEVENTSAND
EVENTS FUNDED BY THE CITY)
42 PUBLIC WORKS HOURLYRATE
43 NONNSUPERVISOR $36:00 .40.00
44 SUPERVISOR -00 4$ 5_00
Ord. No. 21 -09 -2013 Page 26 of 39
CODE ENFORCEMENT DIVISION
Ord. No. 21 -09 -2013 Page 27 of 39
Year 2002
2003 2004
2008
2009
I
Notice of Civil Infraction
n/a
$25.00 Late
$25.00 Late charge fee
charge fee after
after due date
due date
2
Notice of Lien Ietter
n/a
$50.00 Late
$50.00 Late charge fee
charge fee after
after due date
due date
3
Liens —thfs section has
Ewa
$50.00 Seamk €eg
been added to Collections
ftartnKe v226
4
Satisfaction of Liens
n/a
$25.00
$25.00 Preparation Fee
Preparation Fee
5
Special Master Orders
n/a
$50.00 Re-
$50.00 Re- inspection Fee
inspection Fee
6
Portable signs
n/a
$25.00 Permitted
$25.00 Permitted signs
"Open
signs be expanded
be expanded ex.
ex. "Open House"
House" permit fee
permit fee
7
Portable illegal signs
n/a
$25.00 Removal
$25.00 Removal Fee
Fee
8
Records research
n/a
$1.00 minmum;
$100 minimum; $5.00
$5.00 maximum
maximum
9
Special Master Hearings
$75:00
$100.00 Court
$100.00 Court cost and
cost and
Administrative Fee
Administrative
Fee
10
Schedule o£Fines
$150:80
$200.00 Class I -
$200.00 Class I - Ist
Ist offense
offense
I I
Schedule of Fines
$2-25:00
$450.00 Class III
$450.00 Class H1- 2nd
- 2nd offense
offense
12
Schedule of Fines
$350,00
$450.00 Class V
$450.00 Class V - Ist
- Istoffense
offense
Ord. No. 21 -09 -2013 Page 27 of 39
13 Schedule of Fines $35040 $500.00
minimum;$1000
maximum Class
IV - illegal
dumping
14 Garage Sale nla Recommendation
to charge $20.00
for 2 days. Fail to
have permit first
will receive a
courtesy notice.
Second time
without a permit
will receive a
$150.00 fine
Ord. No. 21 -09 -2013 Page 28 of 39
$500.00 minimum;$1000
maximum Class IV -
Illegal dumping
$20.00
CITY CLERKS OFFICE
1 Lobbyist $500.00 $500.00
Ord. No. 21 -09 -2013 Page 29 of 39
CENTRAL SERVICES
1 FINGERPRINTS
2
Roll
$M00 $12.00
$12.00
3.
Digital
NO -SVS $16.00
$15.00 we do not offer
this service
4
BACK6�
5
Background Checks
$15.00 $15.00
$15.00
6
PASSPORTS
$25.00 $25.00
$25.00
7
PHOTOS
$10.00
8
SPECIAL EVENT
9
DEPOSITS
$600 deposit
$600 deposit with a $500
with a $500
refund (cost for
refund (cost
administrative processing
for
fee)
administrative
processing fee)
t0
APPLICATION FEE
$60.00 non
$60.00 non refundable
refundable
II
MOVIES
recommending
to charge $100
recommending to charge
non refundable
$100 non refundable fee
fee for a 30
for a 30 day permit
day permit
1-2
a "',zNT-OWER
44
BANNER
$309 0A
$300,00
44
POLE V *;:`��— a�P
$180:00
$190:00
1°J
44
P4jT 4j{ -�(>> !!�� ♦, (v�TT+"LS
Y, xCyC'RLY-�1:4':' FE
,
t$36nn > 40.00
S44M
�yYtl
14
SUP.YJ.I1"�1'SOR
$ 2.00 $ 5.0
1,8
PO WE HOURLY U A TO
Ord. No. 21 -09 -2013 Page 30 of 39
27 COPIESBLACKAND
WHITE
28 COPIES COLOR
29 Express mail charged only
for exneditegaw its
Ord. No. 21 -09 -2013 Page 31 of 39
$10.00
2.00 52.00
5.00 55_.,_.00
$2.00
0.15
50.50
517.50
21
NOTARY
22
13T PAGE
23
2ND PAGE
24
CITYDOCUMENT
25
OTHER SERVICES
26
LAMINATXNG
27 COPIESBLACKAND
WHITE
28 COPIES COLOR
29 Express mail charged only
for exneditegaw its
Ord. No. 21 -09 -2013 Page 31 of 39
$10.00
2.00 52.00
5.00 55_.,_.00
$2.00
0.15
50.50
517.50
POLICE DEPARTMENT
I POLICE HOURLY RATE
2 OFFICER
$36x.00 $40.00 $40.00
3 SUPERVISOR
$42.09 $50.00 $50.00
4 VEHICLE FEE RATE (IF
$15.00
REQUIRED) PER
HOORoecial Events
ur ose
5 HOLIDAY POLICE
580.00
HOURLYRATE
SUPPERYISOR (Special
Events purroose)
6 HOLIDAYPOLTCE
HOURLYRATE
OFFICER(Special Events
ur ose
7 RADXO FEE (PER
OFFICER PER DAYJ
6b Mcial Events purpose}
Ord. No. 21 -09 -2013 Page 32 of 39
$100.00
$3.00 $3.00
COLLECTIONS DEPARTMENT
I Residential Use (Apartments Only)
2 100 up to 5 Units
$86829k:Ok7 $91.16
3 1016 to 50 Units
$15930 $2580 $15803
4 102 51 to 100 Units
$2344-3 $244 -00 X243.11
5 103 101, to 200 Units
$289A4 $303 °00 $303.88
6 104 201 to More Units
$347.29 $364.00 $364.65
7
Public and Institutional
$1-5030 $1.58:80 $158.03
8
201 Up to 1,000 SQ FT
$12576 wl.g $121.55
9
202 1,001 to 3,000 SQ FT
$182:00 $181.81
10
203 3,001 to 10,000 SQ
$23&53 $243:00 $243.11
FT
11
204 10,001 SQ FT & Over
$273 $292:09 $291.22
12 Business and Professional
13
301 Sole Proprietor
$1-5030 $1.58:80 $158.03
14
302 2 to 9 Employees
$2 -3%33 $243. -00 $243.11
15
303 10 to 24 Employees
$30:07 $33599 $33502
16
304 25 or More
$40547 $425 90 $425'43
Employees
17
Retail and Wholesale Trade
18
401 up to 1,000 SQ FT
5450.39 $15" $
19
402 1 , 0001 to 2,000 SQ
$23164 $2+3:80 $243.11
FT
20
403 2,001 to 5,000 SQ FT
$40547 $4.25:99
$425.43
Ord. No. 21 -09 -2013 Page 33 of 39
21 404 5,001 to 15,000 SQ m<94 $607-00 $607.75
FT
22 405 15,000 SQ FT & Over $818.22 $911.00 $911.63
23 Transportation, Warehousing & Communications
24 501 Minimum Rate $234-53 $243:00 $243.11
2S 502 10 to 25 Employees $260.46 $273:00 $273.48
26 503 26 or More $289 -. $303:00 $303.88
Employees $
27 504 7,500 to 20,000 SQ $29.24 $30:00 $30.70
FT an Additional
28 505 20,001 SQ FT and $3749 $60.08 $60.78
Over an Additional
29 Manufacturing & Intensive Uses
30
Minimum Rate
$260.46 $273:00 $273.48
31
7,500 to 15,000
$289.41- $303:00 $303.88
32
15,001 to 25,000 SQ FT
$31-8.35 $394:00 $334.27
33
25,001 to SQ FT and Over
$3479 $364:00 $364.65
34
Coin Operating Machine
$34:7-3 $36.00 $3647
35
LIEN SEARCHES 24
$30:00 $60:08 $250.00
Hours (only sinxle amiZy
residences
36
LIEN SEARCHES 48
$45:00 $135.00
Hours
37
LIEN SEARCHES 72
$20.0 $20:00 $105.00
Hours
38
Parking Permits per Month
$53.50 $53.50 $53.50
per
Month
Ord. No. 21 -09 -2013 Page 34 of 39
40 Garage Sale Permit Recommending
a $ 20.00
charge for two
days.
41 Lien Searches (5 days)
Ord. No. 21 -09 -2013 Page 35 of 39
$20.00 Fail to get a
$20.00 Permit
permit first
Fail to get a permit first
time will be
time will be close down
close down
and a courtesy notice coil:
and a courtesy
be send out Second time
notice will be
without a permit will be
send out.
fine $150.00
Second time
without a
permit will be
fine $150.00
$105.00
PARKS AND RECREATIONS DEPARTMENT
Year, 2002 2003 2004 2008
1 Sports
2 Basketball
3 Football
4 Soccer
5 Traveling Soccer
6 4nnier Sseee
7 Tennis
8 Cheerleading
9 Mies
10 Travel Baseball
1l Track
12 Ranee
13 Martial Arts
14 Girl aeeats
15 Fitness Center — Monthly
Rentals
Ord. No. 21 -09 -2013
Page 36 of 39
(ms) $25 (res)425
{nen) (Ban)
$50
n/a n/a
nia n/a
Tres) -m {res} $ 5
faerr)$50 {nen) -$50
00SA" {.resyw
1(non)$m 0034) -m
nfa PA
oes)$25 oesom
(nen) -$58 f) $50
►�r++� .
2009
res $30
non $60
(rej $65.00
(nonJ $90.00
des) $60.00
(non) $90.00
(res) $225.00
non $275.00
P&
(rest $25.00
(non) $50.00
res $65.00
(non) $90.00
Eva
(res ?$35.00
(non)$70. 00
(non)$30.00
(non) $60.00
wa Wa BA
$a --w $:35 - -W $35-$45
€ree free free
oes)$25 fres)$25 =80 6W )S30.0
(nen)$40 {nen}40 80 (non) $45.00
16 Fitness
17 Gyma- e4ato
is =iekf-p�
20 Pact_ zel as
21 After-school Program
MonthL
22 Camps
23 Summer
24 Spring
25 Winter
26 Day
Ord. No. 21 -09 -2013 Page 37 of 39
Gres) `"e44M,4x =f, res $30. 00
$ -5/n4h (Rea)4Wi nth (non) $95.00
0ien)
-WlfpAh
19
eM.,, zvunn
(res) $10.00
(non) $20.00
(res) (res) $30 /wk (res) $30 /wk
$25 /wk (non) $60 /wk (non) $60 /wk
(non)
$50 /wk
(res) (res) $30 /week (res) $30 /wk
$25 /wk (non)$60 (non) $601wk
(non)$50 week
/wk
(res)
(res) $60 /two (res) $60 /two weeks
$50 /two
weeks (non) (non) $120 /two weeks
weeks
$120 /two
(non)
weeks
$100
two
weeks
$5 / $10 $5 /M (res) $5
(non) $10
27
Holiday
(res) (res) $5.00 /day
(res) $5,00 /day
$5.00 (non) $l0 /day
(non) $10 /day
/day
(non)
$101day
28
Fitness Center – Quarterly
res5 98
(res )$75.00
$23 -80 ��"800
(nonZ$105.OD
{
$110:98
29
Fitness Center – Semi-
&es)$140,00
.4nrrual
va PA
(non) $200.00
30
Fitness Center – Yearly
res $200.00
FA va
(non) $350.00
31
Base /Softball Field Rental
rose ftt0
(res)$35.OD
Rk
$20:90 , fiMh 5.M
(nn) $45. oD
fnea�
32
Base / Softbalt PieldRental
e 9 g N
(resJ$4D.D0
– w/lights plhr
hen}V48:00
(non) $50.00
(490
$30:90
33
Soccer /FZnFootball
Rola Pa pa
(res945.00
Field Rental p/hr
(non) $50.00
34
SoccerlFlagFootball
W—a n!a n!a
(res)$50.00
Field Rentalw/liet plhr
(non) $60.00
35
Multi - Purpose Room
x$58 , �esj$56-00
(res)$55.00
Rental p/hr
nor (affl X190:08
(no l $110.00
--g0
36
Pavilion Rental (4hrs)
{des �res9889
(rest 110.00
S_$8 (men} !$289:09
non )$220.00
$I50 =09
Section 2. if any section,
clause, sentence, or phrase of this ordinance is for any
reason held invalid or unconstitutional by a court of competent jurisdiction, the holding
shall not affect the validity of the remaining portions of this ordinance,
Section 3. All ordinances or parts of ordinances in conflict with the provisions of
this ordinance are repealed.
Section 4. This ordinance shall take effect immediately.
Ord. No. 21 -09 -2013 Page 38 of 39
PASSED AND ADOPTED this 15a' day of Sep tember, 2009.
ATTEST:
I" Reading: 9/]/09
2"d Reading: 9/15109
READ ANE> , APPROVED AS
CITY A
APPROVED:
COMMISSION VOTE: 5 -0
FORM: Mayor Feliu: I Yea
Vice Mayor Beasley: Yea
74
Commissioner Newman: Yea
otmnissioner Palmer: Yea
Commissioner Sellars: Yea
Additions shown by underlining and deletions shown by v ^•�° °
Ord. No. 21 -09 -2013 Page 39 o {39