Loading...
Res No 090-12-13647RESOLUTION 90 -12 -13647 A Resolution providing direction and guidance to Di Pompeo Construction Corporation during the design concept phase of the Murray Park Community Pool project concerning operational cost efficiencies. WHEREAS, the City has secured a CDBG grant in the amount of $1,207,374.00 for construction and a SNP grant of $220,050.00 for construction but of which 17% may be used for design. The SNP grant expired as of March 31, 2012 but the City has submitted a request for an extension to September 30, 2012 and possibly further if progress is shown toward the construction of the community pool. The CDBG grant is due to expire on December 31, 2012 but it also may be extended if substantial progress is shown towards the completion of the pool; and, WHEREAS, the Commission previously authorized the City Manager to negotiate a design build contract with Di Pompeo Construction for the design and construction of the pool; and, WHEREAS, Di Pompeo Construction Corporation has submitted a proposal to the City that includes a design concept that meets the basic requirements of the City for a community pool; and, WHEREAS, the City desires a pool design that incorporates concepts that will generate operational cost efficiencies for the City; and, NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1. Di Pompeo Construction is hereby directed and authorized to design the proposed Murray Park Community Pool in accordance with the following operational cost efficiency concepts: A learn -to -swim pool, a lap pool, and a 2000 sq. ft. splash area. The commission does not want a kiddie's pool nor does it want a splash pool. Section 2. Severability: If any section, clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, this holding shall not affect the validity of the remaining portions of this resolution. Section 3. Effective Date: This resolution shall take effect immediately upon approval by vote of the City Commission. PASSED AND APPROVED this 25th day of April' 2012. A EST: T CLERK READ AND ROVED AS TO FORM, L I , yEGALITY AND EXEC 101V THEREOF NEY APPROVED:: MAYOR COMMISSION VOTE: 4 -1 Mayor Stoddard: Yea Vice Mayor Liebman: Yea Commissioner Harris: Yea Commissioner Newman: Nay Commissioner Welsh: Yea South Miami CITY OF SOUTH MIAMI f OFFICE OF THE CITY MANAGER INTER- OFFICE MEMORANDUM 2001 To: The Honorable Mayor & Members of the City. Commission From: Hector Mirabile, PhD, City Manager I Date: April 24, 2012. Subject: A Resolution providing direction and guidance to Di Pompeo Construction Corporation during the design concept phase of the Murray Park Community Pool project concerning operational cost efficiencies. Background: The Commission approved the selection and authorized the City Manager to negotiate a design build contract with Di Pompeo Construction Corporation at the April 17, 2012 Commission meeting for the. proposed Murray Park Community Pool. The approved Resolution is included with this package. The purpose of this special meeting is to provide the firm guidance on pool concepts so that they can return with a cost analysis, operational cost efficiencies, As well as new drawings. After commission approval of the general design concept, staff and the .firm will be able to proceed with the development of a contract having accurate numbers. Also enclosed, Di Pompeo Construction's proposal in response to the design build RFP and, selected design options previously suggested by the Commission. The prices for the options are estimated and those selected for the final design will be negotiated. • Di Pompeo Construction: $1,103,499 Options: o Water Tot Lot: $62,000 Note: This is in addition to the tot lot pool since it would be added. o Geothermal Heater: o Solar Panel: o Saline Chlorination: Total with all Options: $140,000 Not Recommended, 3 Pool Concept $64,000 (Est) $1,369,499 Time is of the essence as the SNP grant, in the amount of $220,050; of which 17% ($37,408.50), can be used for construction, expired March 31, 2012. The City has submitted an extension to September 30, 2012 and possibly further if progress is shown toward the construction of the pool. The CDBG grant in the amount of $1 2Q7,374 is d'ue to ,expire December 11., 2012. Substantial progress must; be in place for Mani] -Dad,4 Caun't, -:to further extend the expiration dates of the grants. An.te'nsion :Yvi11 mol certainly be required as it is likely, construction; and: securing, a TCO will extend well beyond December..3 `l 2012. A prorrttrne {i.ne+yill be included as part the desigp f?utld contract "ta'intl,uder design rego�remerM. perrnmvng and certifications,, to �nc.I ude; the Departrr�eet. of. Health and .%ltamlkDade County and general construction permits and; mi►estone$� up o,and :including,ho T. 0. Attachments; Res,,Iutton# -81 .1364 Pr�p�salk Di Pom -peo Constr fibn Corporation • Revision � i�h options, :ema l,-dated April 11 2012: bated November 4, 20:1$0 RESOLUTION 8,8 -12 -13645 A Resolution for the selection of DI Pompeo Construction Corporation and authorizing the City Manager to negotiate a design build contract for the proposed Murray Park Community Pool. WHEREAS, the City has secured a CDBG grant in the amount of $1,207,374.00 for construction and a SNP grant of $220,050.00 for construction but of which 17% may be used for design. The SNP grant expired as of March 31, 2012 but it may be extended to September 30, 2012 and possibly further if progress is shown toward the construction of the community pool. The CDBG grant is due to expire on December 31, 2012 but it also may be extended if substantial progress is shown towards the completion of the pool; and, WHEREAS, the City received proposals in response to an RFP from design build companies for the design and construction of the pool; and, WHEREAS, Di Pompeo Construction Corporation has submitted a proposal to the City that includes a design concept that meets the basic requirements of the City for a community pool. NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1. The City Manger Is hereby directed and authorized to negotiate a design build contract with Di Pompeo Construction Corporation for the design and construction of the proposed Murray Park Community Pool. Section 2. Severability: If any section, clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, this holding shall not affect the validity of the remaining portions of this resolution. Section 3. Effective Date: This resolution shall take effect immediately upon enactment. PASSED AND APPROVED thisl 7 day of April —12012. ATTEST: r .i Ir G , t 1 t IIfCLERK READ A ° 'PROVED AS TO LANf3 , LEGALITY A EKECU IO THEREOF /7 APPR/ OVE7D: Il )Nwi PTA MAYUI COMMISSION VOTE: 4 -1 Mayor Stoddard: Yea Vice Mayor Liebman: Yea Commissioner Harris: Yea Commissioner Newman: Nay Commissioner Welsh: Yea Wick, Steven P From: John DiPompeo U dipompeo @dipompeoconstruction.com] Sent: Friday, April 13, 2012 5:03 PM To: kulick, Steven P Subject: RE: Murray Park Pool Proposal Steve as you requested, for the code compliant chlorine system needed add $64,000 as a result of the changes you added, Please call if any questions Thankyou John DiPompeo Jr. President DiPompeo Construction Corp. 2301 N. W, 33rd Court, Unit #102 Pompano Beach, FL 33069 Phone: (954) 917 -5252 x304 Fax. (954) 974 -4646 Emarh idipompeo dlpomoeoconstruction .corn Website: www.dipornpeoconstruction.com .fit _Pompeo Construction Corporation 1 I uruil} I t if,", ?i - %'e'i, 141' C�rrrrrvP C'urrtroi ^aur *llr ps ,8iri1'Vrr • C imirrrrllm _1tonegrr From: John DiPompeo Sent: Wednesday, April 11, 2012 5:36 PM To: kulick, Steven P Subject: RE: Murray Park Pool Proposal Di Pompeo — Partnering to build "Green" NACT pCREW ...... G■t�aierM LMNAIOP, 6 19tH 1°iC} LIED AP ....,...��. ....... Hi Steve Pursuant to your below requests and the four pictures you forwarded us on 419112, we offer the following for your consideration. 1) for the children's area, adding items denoted in your pictures, adds an additional $62,000 2) as for the salt to chlorine, our engineer said that you can not do it since it has to be a combination of salt and chlorine because it is a public pool and not a residential pool. 3) our engineer strongly suggests using the. geothermal heating system as that is what we have used on all our governmental pools for 25 years in south Florida as solar is not practical for this type of building with a 3 pool layout. For this well system please add $140,000 Lastly, since we submitted our proposal in September 2010, even though unemployment still is terrible, believe: it or not material suppliers have and are raising their prices, thus please add an additional $108,000 to our initial proposal for this. I hope this helps the City to move the project along and we look forward to working with the City of South Miami John DiPompeo Jr. Di Pompeo -- Partnering to build "Green" President DiPompeo Construction Corp, 2301 N. W. 33rd Court, Unit #102 Pompano Beach, FL 33069 Phone: (954) 917 -5252 x304 Fax: (954) 974 -4646 Email: ldipompeo @dipompeoconstruction.com Website., www.dipompeoconstruction.com Dl JPompeo Construction Corporation 171111��,' llil ill ill) ?I ,1 /7r1�E' i'�: — C;enrral C bnlrwdur • Ae%ism Bander • C un ordon ,IILnozer CREW r �: '� �` ■earrw _.�.�.� * rarrt•flurw "z s.•xrs' 4. ibrbMlCene6rS �VIFILC III � � k I 4KfN Ai \T UIPG11f, I`aAIC i� AN Urban land Y., ;- Instilu'le LEW AP ...........;..:.. xthar ! dLrrMa,� rr awn From: kulick, Steven P [mailto:SKulick @southmiamifl.gov] Sent: Wednesday, April 04, 2012 1:43 PM To: John DiPompeo Cc: Ng, Keith; Korth, Jennifer; David, Stephen Subject: Murray Park Pool Proposal John, Per our discussion, please prepare the following modifications to your Murray Park Pool proposal, dated November 4, 2010; • Children's Area: Convert the Splash Station to a Water Tot Lot • Chlorination /Sanitation; Salt to Chlorine System • Heater Power Supply Options: Solar, Gas, Deep Well Injection (Geothermal) Please quote the above as modular, (options), so as not to affect each other and how it will affect the base price previously quoted. We need this information by Friday at noon. Please call if you have any questions. Regards, Steven Kulick, C.P.M. Purchasing Manager /Central Services City of South Miami 6130 Sunset Drive South Miami, Fl 33143 Ph: 305/663 -6339; Fax: 305/663 -6346 skulick @southmiamifl.gov 2 C 0 60 a LM 0 U C 0 9� t; 0 U 0 0 CL E 0 M P co 1) j,) i i ent's Pr i c I ag ,c,l n cl Deli rery P r6posa 1. )11 Rud'!'et 01", 1 .2 Million DiPompeo Construction Corporation 3 Filowr Midifilper Slat.f. IQ.) 7 Gro peral Contract, w.1 - Palp AftfidrM • C011.11rardws h1apodger.% RFP #SM-PW201 0-10 Design / Build Murray Park Community Pool ORIGINAL D1* Pompeo Construction Corporation CGC #037741 . A Family Tradition Since 1927 General Contractor , Design Builder • Construction Manager November 4, 21} 10 Mr. Fritz Armand, Director Public Works & Engineering Department The City of South Miami' 6130 Sunset Drive South Miami, Florida 33143 Re: Murray Park Community Pool, RFP # SM- PW2010 -10, Re- Submittal with a $1.2 Million Dollar Budget Dear Mr. Armand: This is to convey our Letter of Interest for providing Design / Build Services for the revised $1.2 million dollar budgeted Murray Park Community Pool in the City of South Miami, Florida. After careful review of the RFP document and agreeing to be bound by its terms and conditions, the Di Pompeo Construction Design t Build team is pleased to present our package for your review and consideration. The members of our team consist of: • Di Pompeo Construction Corporation — Design Builder (LELD Certified) • R.E. Chisholm Architects, Inc. — Architecture and Landscape Design (SBE, MBE, LEED Certified) • Aquadynamics Design Group, Inc. — Aquatic Engineering / Pool Design • Zvonimir T. Belfranin, lqc: — Structural Engineers (MBE) • Hufsey Nicolaides Garcia Suarez Associates, Inc. — KEY, Engineers (LIKED Certified) Camero and Associates, Inc. — Civil Engineers • Curtis + Rogers Design Studio, Inc. — Landscape Architects • Lannes and Garcia, Inc. — Land Surveyors • Professional Service Industries, Inc. (PSI) — Materials Testing Our team is very enthused in submitting this RFP response since we believe we are uniquely qualified for the tasks you are requiring to Design and Build the Murray Park Community. Pool, as we have built many Design / Build projects foeether, on time and within budget over the past 17 years in South Florida. Not only have our team members built projects together in the past, but the 35 Letters of Recommendation on Di Pompeo's website confirm our building abilities. Our design features three separate and distinct pools that provide the end user with the abilityy to provide for adult exercise in the laa nnol, swimming lessons and drown - proofing in the learning pool and infant & small child recreational use in the kiddie pool. We believe that by offering these three core uses to the community, we have addressed one of the primary. neighborhood requirements for this project. We thank you for the opportunity to participate in your selection process and we hope our response to the RFP will gain your confidence in us to successfully design and construct all work at the Murray Park Community Pool, Respectfully submit( Di Pon peo Const on Corporation Chris Tucker Chief Estimator CT /ea ivivw.c ipomgeoconst'i- iiction.coni 2301 N. fl' 3.1" Court, Unit #102 Por)jnarto l3ctrGlr, h7oridu 3306P Telephone: ('95 -1) 917-5252 • rrox: (954) 974 -4646 W Joi '""" LEEO AP KIENHIER PRICE PROPOSAL FORM BUDGET OF $1,200,000 PER ADD. #5 (E -MAIL) Murray Park Community Pool THIS PRICE PROPOSAL. IS SUBMITTED TO: Maria M. Menendez City Clerk Office City Hall 6130 Sunset Drive South Miami, Florida 33113 I. The undersigned PROPONENT proposes and agrees, if this Price .Proposal Is accepted, to enter Into an agreement with the City of South Miami in the form Included in the Contract Documents to perform and furnish all wark as specified or Indicated in the Contract Documents for the Contmct Prire.. anel wlrhin the Contract Time indicated in this Price Proposal and in accOrdarice with the other terms and conditions of the Contract Documents, In addition to the work specified or Indk;ated in the Contract Documents as prepared are due by Consultant. 2. PROPONENT accepts all of the terms and conditions of the Advertisement or RFP and Instructions to Proponents, including without limitation those dealing with the disposition of Bid (Price Proposal) Security. This Price Proposal will recuiln subject to acceptances for ninety (90) days after the day of the Bid opening. PROPOWNT agroc5 ter sign :rud SUI)MIt the Agreement with the Bonds and other documents required by the RFP requirements wirhin tan (10) calendar days after the date of the City's Notice of Award. 3. In submitting this Price Proposal, PROPONENT represents, as more fully set forth in the Agreement, that; a. PROPONENT has examined copies of all the RFP Documents and the following Addenda (receipt of all which is hereby acknowledged,) Addendum No, ONE — — — Dated: 8/31110� Addendum Na, TWO Dated: 912110 Addendum No. THREE Dated, 9/$/10 s� Addendum No. I -Ci4lR Dated: 919110 Addendum No. FIVE fE -MAIL) Dated: 10121/10 Addendum No. Dated: b. PROPONENT has familiarized himself with the nature and extent of the contract documents, work, site, locality, and all local conditions and laws and regulations that in any manner may affect cost, progress, performance or furnishing of the Work. c. PROPONENT has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions. d. PROPONENT has obtalned and carefully studied (or assumes responsibility for obtaining and cat-ONIly studying) all such examinations, investigatloiis, explorations, testa and saidias (in addition to or to stipplernent those referred to in (c) above which pertain to the subsurface or physical coriditloos xt k1w site or otherwlse may affect the rosr, progi`ess, parfoernance, or furnishing of flit Work at the Contract Price., within the Contract Time and in accordance with the other v:rr,75 and conditions of the Contract Documents, and no additional examinations, investigations, explorations, costs, reports or similar information or data are, or will be required, by PROPONENT for such purposes. Murray Park Community Pool RFP 16 e. PROPONENT has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of all Underground Facilities, No additional examinations, investigations, explorations, tests, reports or similar Information or data In respect to said Underground Facilities are, or will be required, by PROPONENT In order to perform and furnish the Work at the Contract Price, within the Contract Time and In accordance with the ocher terms and conditions of the Contract Documents. L PROPONENT has correlated the results of all such observations, examinations, Investigations, explorations, tests, reports and studies with the terms and conditions of the Contract Documents. g, PROPONENT has given by 10;00 a.m., Friday, September 3, 2010 written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by Consultant Is acceptable to PROPONENT. h. This RFP is genuine and not made In the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted In conformity with any agreement or rules of any group, association, organization, or corporation; PROPONENT has not direccly.or Indirectly induced or solicited any other PROPONENT to submit a false or sham RFP; PROPONENT has not solicited or induced any person, firm or corporation to refrain from responding to RFP; and PROPONENT has not sought by collusion to obtain for Itself any advantage over any other PROPONENT or over the CITY. 4. PROPONENT understands and agrees that the Contract Price Is the lump sum to furnish and install all of the Work complete In place, A Schedule of Values must be provided with the 13 division break -down as welt a cost breakdown of the design phase and contingency.. This information needs to be provided for the purpose of Evaluation and when initiated by the CITY, the pricing of change orders. Contractor's price will not be adjusted to reflect any deviation from the Schedule of Values, except to the extent that the CITY changes the scope of tho Project after the Contract Date As such, the Contractor shall furnish all labor, materials, equipment, tools, superintendence and services necessary to provide a complete, In place Project for the Proposed Price oh Design: $128,348.00 - - -_— -_- Construccion: $867.151.00 LUMP SUM PRICE: Nine Hundred Ninety Five Thousand Four Hundred Ninety Nine Collars dollars and & No Cents cents $995,499.00 Alternates: #1 NO ALTERNATE BIDS #5 #2 #6 #3 #7 #4 #8 5. The ENTIRE WORK shall be completed, In full, within one hundred and eighty (180) calendar days from the date stipulated in the NOTICE TO PROCEED, Murray Park Community Pool RFP 17 Failure to complete the entire work during the described time period shall result In the assessment.of liquidated damages'as Indicated in Paragraph -6 of the Agreement. 6. Communisations concerning this Bid shall be addressed to; FROPONENTr D1 Pornoeo Coaster lsn �arporatlon Address-. 23g IsIW 3ard .Coull # #102 Eonipano Beach. ft 33069 Telephone; &1 -917 -525 Facsimile: 4- 4.4 0 Attention: John 01 Z2inp JJr._ . _. 7. The terms used In this RFF which are deflned In the General Conditions of the Conscruction 'Contract included as part of the Contract Documents have the meanings assigned to them In the General. Conditions, SUBMITTED THIS Al DAY OF 2014. BID SUBMITTED BY; Q) Polrip oo Callon +CnrnaraEjonn, Company John DI Epmn -go Jr. Title 9 §�t -B1 Z-5252 Telephone Number 95,1_974.4646 fex Numbcr mve ccaro Cc;:rl iraonipeo c on s Eruct i ort, co m Email Address Murray Park Community Pool RFP 18 C O L 9 V i La 0 U 0 a� a E a° D Design / Builder's Approach To Sustainable Design Di Pompeo Consirmcdon Corporation ! IwArrilv 7rre<lir u+r •S °irrrr 192' General (nurrurinrr.11rvfhrr tlullrlrrx • Cam "emrrlarr Rlerrrrgrn RFP #SM- PW2010 -10 Design / Build Murray Park Community Pool upeo grpot' anion ardilion Since 1927 General Contractor • Design Builder , Construction Manage;- Approach To Sustainable Desikn Sustainable design is the idea of creating buildings and lrnrdscapes thai jour the highest positive regard for our quality of life with the least consequences to our environinent. Sustainable design attempts to balance econo nlc, social, and euvironn ►ental factors, For best results, sustainability should he clearly articulated as a guiding principle for project development, and incorporated into the project from file earliest stages. Sustnlinable design principles affect all phases of project development,, from design, construction, operations and maintenance, and dentolition and disposal. Benefits of sustainable design Include more healthy indoor environments, dollar .savings over time, and niardmizh►g resource conservation. Sustahnability should be approached as a core value to the Design / Bander, as it represents a unique opportunity to put theory h ►to practice through the design and uIllmate endurance of the project. The design, construction and maintenance of buildings has a tremendous impact on people and their neighborhoods. Willi these potential impacts in mind, sustah ►able building should altempt to meet the following goals where opplicable. Every design project Is unique, and the sustainable rleslgn elements, technologies and Materials crust be malched to the project's program, client goals, and budget. As a starting point for Innovation and sustainable elements for the Murray Park Community Pool project, the Design / Builder examines the opportunities thol present themselves throughout the varlous stages of development and their global impact on the project. The most elemental review for fh a Murray Park Communly Pool would begin with the design concept review: Listed below are opportunities that will be appropriate far fire conceptual and schematic phase of the work. Incorporatesuslainabllily into the earliest design discussions, • Include input from the Owner, maintenance staff, and tiny stakeholders, to can flrm design criteria • Explore opporiwuilles for innovation with a collaborative, mull- disclptnary design lernn air the early stages of design. • Educate others to ensure that all design find construction Leant members ore ftuttlilar with sustainability concepts and basic sustainable building practices and philosophy. • Utilize well - established, sustainable design rating systems stitch as LEED to nneasure green performance. • Consull our LEED professionals on our consulting teams. • Incorporate Llfe Cycle Cost Analysis into badgel projections. Life Cycle Cost Analysis defines the projected useful life of a project and looks at the net present value of design options as Investments. Tire goad is to achieve the highest envdroni►neirtal performance possible at the least cost, • Design (rash enclosures to allow for recycling bins for paper products, nnetal cans and glass. mm. dipomp:q,?construction,com 230 / X II', JP' Court, daft 0102 • l omilmous 11cach, Florida 33069 T lephotra, (r154) 917 -5252 • I,av: (95 4) 97 4- 46-16 �fE�:�Eti LE OAR The use of existing natural systenss to enhance the sustainable aspects of the Murray Park Community Pool is one that has the potential to accrue long ternt savings for the residents and management of the facility while at the same time, adding to the enjoyment of rising such a well thought -out environment. • increase the bemef is of vegetation by marintiziug platted areas both indoors and out. • Use ecological design principles to mimic natural systems function such as the use of Xeriscape landscaping through floe use of ►core drought resistant species. This will also reduce the residents' dependence on irrigation. The Innovative approaches for conservation of energy resources for a project such as the Murray Park Conrmrtnity Pool will be thoroughly exandned and should result In a number of positive enhancements to Ilse project that can be enjoyed by all residents. • Increase eff clency by rnaxinrizing equipment efflclency and using control strategies such as programmable thermostats anl'photn on and diner off lighting • Investigate the use of reflective coatings on the roof. • Ensure that all applicable energy related incentives have been utllized. • Provide residents with public transportation options,. bicycling, and walking access to basic services. • Utilize low VOCpahtfs, adhesives and floor coverings wheneverpossible. During the construction phase of flit Murray. Park Community Pool, there eeists an enormous opportunity to practice sustainable methods such as those listed below with minimal impact on construction Productivity and project Midget. • Use materials with minimal packaging waste that is recyclable, and materials that are easily recycled. • Utilize materials and products manufactured locally to support the local economy and mrinlsnize transportation costs. • Eliminate environmental contamination ►pith filtration devices for air and water systems. Hign.lighted dements a Sustainable Features OL _ a Di Pomp o Construction Corpora ion ,1 I' wHv 'rnrrflinrrr Shi, r I ilererrnl C'nr�rnrt °Nrfr. iltvl�u llrrilrfwrr •CSuro-lrst•Ila�l� Alnrarr�•.n RFP #SM- PW2010 -10 Design / Build Murray Park Community Di Pompeo Construction Corporation CGC #037741 • A Family Tradition Since 1927 General Contractor • Design Builder • Construction Manager Highlighted Elements and Sustainable Features The DI Pompeo Teant's design toot only meets till requirentents set forth by the City of South Mirnnl for the Murray Park Community Pool, but exceeds expectations in areas such as aesthelics; fttttctdonality, versadilty, sustainable features and neighborhood etthancemeul Soure of these elements that lend themselves to making this a truly owstarrrfing design are the use of.• POOL RELATED • Three separate pools ore designed for multiple uses such as Imps, s►vhtt lessons and toddler trse • Three pools share common pump and folfralion equipment for operating ecottonty • Zero entry feature into learning and klddle pools • Portable /re- locatable lifeguard station • Portable handicap pool chair • Sall chlorhoe generator • Regenerative fllter font ►vlil save with, backwash water • Pool heating system • Thermal pool blanket • Varlable frequency drive pump controller resulting In considerable electrical sovings DESIGN RELATED • Perimeter site fencing separates pool faclllty from street for security • Nal►trol ventilation and fauns !to changing rooms and tollet areas • Permeablepaversforwalkways • Ample bicycle parking to encourage fewer automobiles • Separate enhy /ticket bullding for greater access control • Use of solar hot water • Separate pool equipment and chemical storage building • Picnic area green space odjticent to pool deck + Heavy landscaphtgfor shade and patron enjoyment • Snack bar designed for food ivaruth►g • Pool mauager /Ifegnardoffice • Shade structures strategically located around pool (leek area • Pool, landscape and deck lighting far night done use REVENUE RELATED • Separate entry/tickef building • Snack bar for healfhy snicks and food warttting www.drpompeoconstruction. corn 2301 N. VY. 33" Courf, Unil #102 , Pompono Beach, Florida 33069 - Telephone: (954) 917 -5252 • Fax: (954) 974 -4646 LEEO AP NIENIOLN Why You Should Choose The DI* Pompeo Team Di 1 ompeo Construction Cen porallon . f d ir+t7iii P!url+'Ir'+ =rr,5r +1 r 1"l" "fhwomf Cnurrrrrlarx -Oolp IWINrrs • cam Prurdan Alarragrrr r r.. RFP' #SM- PW2010 -10 Design / Build Murray Park Community Pool 0 on 927 General Contractor • Design Builder • Construction Manager Why You Should Choose The Di Pompeo Team • Di Pompeo Constritellon, Chlshohn, Agnadynamdcs, Belfranin, Hrrfsey _ Nlcolohles, Camero, Curtis + Rogers, Lamnes & Garcla and Professional Service buhistrles are local companies with offices withhn close proximity to the project site. • Team members have Design l Bi did experience and have worked together oil other projects. • Excellent quality and alivays honor warranty helms quickly. • Safety frst with low experience modiflen • Utilize subcontractors and sirperhrtendents that have built similar projects, • Have over 17years of Design l Bulid experience (call Tamarac, Coral springs, Ft. Lauderdale; Broward County, Plantation, Margate, Pompano Beach). • Know what Design !Bullrl entails (paperwork, giiallty, inspections and pernrdlthig). • For the next 12 months — Qy of South Miami and the Murray Park Comnrimity Pool will be our sole focus, we don't overeaten d ourselves and take on more jobs and lose control. • DI Pompeo track record of completing projects on -tine and on- budget. • Owner's personal hivolvement, call hhn direct, not PM who needs opproval of upper mairagement, Mr. Dl Polupeo is on top of Issues and obvilysfollows.through. • No change orders unless initiated by the Owner or nnforeseen. • Our ilrr oosal has everrihigg refluired in the RFP and more! w�vw. dipp?rrpeoconstl•tiction. cots 2301 N, !V, 33 "r Court, Unit P 102 Po►r�parnn Beach, Floridan 33069 • Adeliho+re: (914) 911 -5252 • Far: (954) 974 -4646 W s r" LEEDAP C O O. L U C 0 7 ti. C O V r �J criteria . q k �t one 1'r -ic-i1 -Ind v cry Proposal Order of Magnitude Cost Estimate .by Division Di Pvm j��ev l' Construction Corporation ! Nsu+ilr' Irr+didan ince 141' Cit+rr+'al Cmlfr�arfn+ar � llr.Ff�r+ flr�Ftdrrx C'arhs7�uMlnr+ Af�un�rrs RFP #SM- PW2010 -10 Design /Build Murray Park Community Pool MURRAY PARK COMMUNITY POOL CITY OF SOUTH MIAMI, FL RFP # SM- PW2010 -10 DI POMPEO CONSTRUCTION CORPORATION DESCRIPTION DIVISION #1 $110,509 DIVISION #2 $48,487 DIVISION #3 $161,791 DIVISION #4- $8,500 DIVISION 0 $2,050 DIVISION #6 $5,200 DIVISION ##7 $1,102 DIVISION 48 $4,090 DIVISION 49 $8,677 DIVISION #10 $3,410 DIVISION 911 $6,200 DIVISION 01.2 $58,635 DIVISION #13 $382,500 DIVISION #14 NOT USED DIVISION ##I5 $25,500 DIVISION #10 $35,500 Mal _ TOTAL $862,151 _ PERMIT FEES, REIMBURSABLE $5,000 CONSTRUCTION PHASE TOTAL $867,151 1 DESIGN PHASE TOTAL Pf2fi.II X"'r G ibkNI) Ti)'i A RFP #SM- PW2010 -10 Murray Park Community Pool $128,348 $905,409 C 0 0 U C 0 JLJ IA C 0 U 8 CL E 0 CL C I I ,ii i J'rOP()JJeJt 'S I "I' 1 i I Iris: Defivux PI-QVO,$0 Opp" Concept Project Design and Park Improvements f 64 ray Park Cornum I lif)lt .,J 0 1 DI* Pompeo Construction Corporation f7i'lW&I CAMIFMCM14 - MMISIF fiAdIff"M • ('610OWdIft AlIFFUrgen RFP #SM-PW201 0-10 Design / Build Murray Park Community Pool 2 -AJW . ` . � ��\ ® �, \ � �� /�� \, w two LLJ U) z 0 .F Z) F- E 0 co E M 2 4; CO :3 0 0 >1 u 4 Z O Q W J W 0 U3 6 0 CL E E 0 C) Y l4 d A 7 E l0' L 7 O w O U 011 Z 0 LU cn LU -a 0 a- E 0 CL E M 0 co A 7 i i 7W ,U � W Q � W Cw O i i 3 I 4 l I ?� Z O �1111 W LI f ry O Z Q 0 d T ;E 7 E E O U ro a T ro ro s 0 CO 0 T U t6) 13- E E 0 IC LL E CC_m O LLI L Y 11C) ILI Cl cn !L! n W U) a 'E z F- E 0 U Y m d m L 7 O O a U t C a a wyy 1 U W CL [r w n w z a C E E O m !0 a m t E M t U 41 2.1 11 110.1 -6 0 CL 211 c 9- E; 0 0 CL E A2 2 0 co A t 3 '1 s � p O O a Z, �C 7 E O U c� CL T (0 O �E m L 7 O U) 46 O A I Mn E 0 -Le E 0 LO 0 >1 0 4, A r O R CL c 3 E E 0 U Y `ro CL R t E m 2 t f 3 cn 46 U