Res No 090-12-13647RESOLUTION 90 -12 -13647
A Resolution providing direction and guidance to Di Pompeo Construction
Corporation during the design concept phase of the Murray Park Community
Pool project concerning operational cost efficiencies.
WHEREAS, the City has secured a CDBG grant in the amount of $1,207,374.00 for construction
and a SNP grant of $220,050.00 for construction but of which 17% may be used for design. The SNP
grant expired as of March 31, 2012 but the City has submitted a request for an extension to September
30, 2012 and possibly further if progress is shown toward the construction of the community pool. The
CDBG grant is due to expire on December 31, 2012 but it also may be extended if substantial progress is
shown towards the completion of the pool; and,
WHEREAS, the Commission previously authorized the City Manager to negotiate a design build
contract with Di Pompeo Construction for the design and construction of the pool; and,
WHEREAS, Di Pompeo Construction Corporation has submitted a proposal to the City that
includes a design concept that meets the basic requirements of the City for a community pool; and,
WHEREAS, the City desires a pool design that incorporates concepts that will generate
operational cost efficiencies for the City; and,
NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF
SOUTH MIAMI, FLORIDA:
Section 1. Di Pompeo Construction is hereby directed and authorized to design the proposed
Murray Park Community Pool in accordance with the following operational cost efficiency concepts:
A learn -to -swim pool, a lap pool, and a 2000 sq. ft. splash area. The commission does not want a
kiddie's pool nor does it want a splash pool.
Section 2. Severability: If any section, clause, sentence, or phrase of this resolution is for any
reason held invalid or unconstitutional by a court of competent jurisdiction, this holding shall not affect
the validity of the remaining portions of this resolution.
Section 3. Effective Date: This resolution shall take effect immediately upon approval by vote of
the City Commission.
PASSED AND APPROVED this 25th day of April' 2012.
A EST:
T CLERK
READ AND ROVED AS TO FORM,
L I , yEGALITY AND
EXEC 101V THEREOF
NEY
APPROVED::
MAYOR
COMMISSION VOTE:
4 -1
Mayor Stoddard:
Yea
Vice Mayor Liebman:
Yea
Commissioner Harris:
Yea
Commissioner Newman:
Nay
Commissioner Welsh:
Yea
South Miami
CITY OF SOUTH MIAMI f
OFFICE OF THE CITY MANAGER
INTER- OFFICE MEMORANDUM 2001
To: The Honorable Mayor & Members of the City. Commission
From: Hector Mirabile, PhD, City Manager
I
Date: April 24, 2012.
Subject: A Resolution providing direction and guidance to Di Pompeo
Construction Corporation during the design concept phase of
the Murray Park Community Pool project concerning
operational cost efficiencies.
Background: The Commission approved the selection and authorized the City Manager to
negotiate a design build contract with Di Pompeo Construction Corporation at
the April 17, 2012 Commission meeting for the. proposed Murray Park
Community Pool. The approved Resolution is included with this package.
The purpose of this special meeting is to provide the firm guidance on pool
concepts so that they can return with a cost analysis, operational cost efficiencies,
As well as new drawings. After commission approval of the general design
concept, staff and the .firm will be able to proceed with the development of a
contract having accurate numbers.
Also enclosed, Di Pompeo Construction's proposal in response to the design
build RFP and, selected design options previously suggested by the Commission.
The prices for the options are estimated and those selected for the final design
will be negotiated.
• Di Pompeo Construction: $1,103,499
Options:
o Water Tot Lot: $62,000
Note: This is in addition to the tot lot pool since it would be
added.
o Geothermal Heater:
o Solar Panel:
o Saline Chlorination:
Total with all Options:
$140,000
Not Recommended, 3 Pool Concept
$64,000 (Est)
$1,369,499
Time is of the essence as the SNP grant, in the amount of $220,050; of which 17%
($37,408.50), can be used for construction, expired March 31, 2012. The City has
submitted an extension to September 30, 2012 and possibly further if progress is
shown toward the construction of the pool. The CDBG grant in the amount of
$1 2Q7,374 is d'ue to ,expire December 11., 2012. Substantial progress must; be in
place for Mani] -Dad,4 Caun't, -:to further extend the expiration dates of the
grants. An.te'nsion :Yvi11 mol certainly be required as it is likely, construction;
and: securing, a TCO will extend well beyond December..3 `l 2012.
A prorrttrne {i.ne+yill be included as part the desigp f?utld contract "ta'intl,uder
design rego�remerM. perrnmvng and certifications,, to �nc.I ude; the Departrr�eet. of.
Health and .%ltamlkDade County and general construction permits and; mi►estone$�
up o,and :including,ho T. 0.
Attachments; Res,,Iutton# -81 .1364
Pr�p�salk
Di Pom -peo Constr fibn Corporation
• Revision � i�h options, :ema l,-dated April 11 2012:
bated November 4, 20:1$0
RESOLUTION 8,8 -12 -13645
A Resolution for the selection of DI Pompeo Construction Corporation and authorizing
the City Manager to negotiate a design build contract for the proposed Murray Park
Community Pool.
WHEREAS, the City has secured a CDBG grant in the amount of $1,207,374.00 for construction
and a SNP grant of $220,050.00 for construction but of which 17% may be used for design. The SNP
grant expired as of March 31, 2012 but it may be extended to September 30, 2012 and possibly further if
progress is shown toward the construction of the community pool. The CDBG grant is due to expire on
December 31, 2012 but it also may be extended if substantial progress is shown towards the completion
of the pool; and,
WHEREAS, the City received proposals in response to an RFP from design build companies for
the design and construction of the pool; and,
WHEREAS, Di Pompeo Construction Corporation has submitted a proposal to the City that
includes a design concept that meets the basic requirements of the City for a community pool.
NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF
SOUTH MIAMI, FLORIDA:
Section 1. The City Manger Is hereby directed and authorized to negotiate a design build
contract with Di Pompeo Construction Corporation for the design and construction of the proposed
Murray Park Community Pool.
Section 2. Severability: If any section, clause, sentence, or phrase of this resolution is for any
reason held invalid or unconstitutional by a court of competent jurisdiction, this holding shall not affect
the validity of the remaining portions of this resolution.
Section 3. Effective Date: This resolution shall take effect immediately upon enactment.
PASSED AND APPROVED thisl 7 day of April —12012.
ATTEST:
r
.i Ir G , t 1
t IIfCLERK
READ A ° 'PROVED AS TO
LANf3 , LEGALITY A
EKECU IO THEREOF /7
APPR/ OVE7D:
Il )Nwi
PTA
MAYUI
COMMISSION VOTE: 4 -1
Mayor Stoddard: Yea
Vice Mayor Liebman: Yea
Commissioner Harris: Yea
Commissioner Newman: Nay
Commissioner Welsh: Yea
Wick, Steven P
From: John DiPompeo U dipompeo @dipompeoconstruction.com]
Sent: Friday, April 13, 2012 5:03 PM
To: kulick, Steven P
Subject: RE: Murray Park Pool Proposal
Steve as you requested, for the code compliant chlorine system needed add $64,000 as a result of the changes you
added,
Please call if any questions
Thankyou
John DiPompeo Jr.
President
DiPompeo Construction Corp.
2301 N. W, 33rd Court, Unit #102
Pompano Beach, FL 33069
Phone: (954) 917 -5252 x304
Fax. (954) 974 -4646
Emarh idipompeo dlpomoeoconstruction .corn
Website: www.dipornpeoconstruction.com
.fit _Pompeo
Construction Corporation
1 I uruil} I t if,", ?i - %'e'i, 141'
C�rrrrrvP C'urrtroi ^aur *llr ps ,8iri1'Vrr • C imirrrrllm _1tonegrr
From: John DiPompeo
Sent: Wednesday, April 11, 2012 5:36 PM
To: kulick, Steven P
Subject: RE: Murray Park Pool Proposal
Di Pompeo — Partnering to build "Green"
NACT pCREW
......
G■t�aierM
LMNAIOP,
6 19tH 1°iC}
LIED AP ....,...��. .......
Hi Steve
Pursuant to your below requests and the four pictures you forwarded us on 419112, we offer the following for your
consideration.
1) for the children's area, adding items denoted in your pictures, adds an additional $62,000
2) as for the salt to chlorine, our engineer said that you can not do it since it has to be a combination of salt and chlorine
because it is a public pool and not a residential pool.
3) our engineer strongly suggests using the. geothermal heating system as that is what we have used on all our
governmental pools for 25 years in south Florida as solar is not practical for this type of building with a 3 pool layout. For
this well system please add $140,000
Lastly, since we submitted our proposal in September 2010, even though unemployment still is terrible, believe: it or not
material suppliers have and are raising their prices, thus please add an additional $108,000 to our initial proposal for this.
I hope this helps the City to move the project along and we look forward to working with the City of South Miami
John DiPompeo Jr. Di Pompeo -- Partnering to build "Green"
President
DiPompeo Construction Corp,
2301 N. W. 33rd Court, Unit #102
Pompano Beach, FL 33069
Phone: (954) 917 -5252 x304
Fax: (954) 974 -4646
Email: ldipompeo @dipompeoconstruction.com
Website., www.dipompeoconstruction.com
Dl JPompeo
Construction Corporation
171111��,' llil ill ill) ?I ,1 /7r1�E' i'�: —
C;enrral C bnlrwdur • Ae%ism Bander • C un ordon ,IILnozer
CREW r
�: '� �` ■earrw
_.�.�.� * rarrt•flurw
"z s.•xrs' 4. ibrbMlCene6rS
�VIFILC III � � k I
4KfN Ai \T
UIPG11f,
I`aAIC i� AN Urban land
Y., ;- Instilu'le
LEW AP ...........;..:.. xthar ! dLrrMa,� rr awn
From: kulick, Steven P [mailto:SKulick @southmiamifl.gov]
Sent: Wednesday, April 04, 2012 1:43 PM
To: John DiPompeo
Cc: Ng, Keith; Korth, Jennifer; David, Stephen
Subject: Murray Park Pool Proposal
John,
Per our discussion, please prepare the following modifications to your Murray Park Pool proposal, dated November 4,
2010;
• Children's Area: Convert the Splash Station to a Water Tot Lot
• Chlorination /Sanitation; Salt to Chlorine System
• Heater Power Supply Options: Solar, Gas, Deep Well Injection (Geothermal)
Please quote the above as modular, (options), so as not to affect each other and how it will affect the base price
previously quoted. We need this information by Friday at noon.
Please call if you have any questions.
Regards,
Steven Kulick, C.P.M.
Purchasing Manager /Central Services
City of South Miami
6130 Sunset Drive
South Miami, Fl 33143
Ph: 305/663 -6339; Fax: 305/663 -6346
skulick @southmiamifl.gov
2
C
0
60
a
LM
0
U
C
0
9�
t;
0
U
0
0
CL
E
0
M
P co 1) j,) i i ent's Pr i c I ag ,c,l n cl Deli rery P r6posa 1.
)11 Rud'!'et 01", 1 .2 Million
DiPompeo
Construction Corporation
3 Filowr Midifilper Slat.f. IQ.) 7
Gro peral Contract, w.1 - Palp AftfidrM • C011.11rardws h1apodger.%
RFP #SM-PW201 0-10 Design / Build
Murray Park Community Pool
ORIGINAL
D1* Pompeo
Construction Corporation
CGC #037741 . A Family Tradition Since 1927
General Contractor , Design Builder • Construction Manager
November 4, 21} 10
Mr. Fritz Armand, Director
Public Works & Engineering Department
The City of South Miami'
6130 Sunset Drive
South Miami, Florida 33143
Re: Murray Park Community Pool, RFP # SM- PW2010 -10, Re- Submittal with a $1.2 Million Dollar Budget
Dear Mr. Armand:
This is to convey our Letter of Interest for providing Design / Build Services for the revised $1.2 million dollar budgeted
Murray Park Community Pool in the City of South Miami, Florida. After careful review of the RFP document and
agreeing to be bound by its terms and conditions, the Di Pompeo Construction Design t Build team is pleased to present
our package for your review and consideration. The members of our team consist of:
• Di Pompeo Construction Corporation — Design Builder (LELD Certified)
• R.E. Chisholm Architects, Inc. — Architecture and Landscape Design (SBE, MBE, LEED Certified)
• Aquadynamics Design Group, Inc. — Aquatic Engineering / Pool Design
• Zvonimir T. Belfranin, lqc: — Structural Engineers (MBE)
• Hufsey Nicolaides Garcia Suarez Associates, Inc. — KEY, Engineers (LIKED Certified)
Camero and Associates, Inc. — Civil Engineers
• Curtis + Rogers Design Studio, Inc. — Landscape Architects
• Lannes and Garcia, Inc. — Land Surveyors
• Professional Service Industries, Inc. (PSI) — Materials Testing
Our team is very enthused in submitting this RFP response since we believe we are uniquely qualified for the tasks you are
requiring to Design and Build the Murray Park Community. Pool, as we have built many Design / Build projects foeether,
on time and within budget over the past 17 years in South Florida. Not only have our team members built projects
together in the past, but the 35 Letters of Recommendation on Di Pompeo's website confirm our building abilities.
Our design features three separate and distinct pools that provide the end user with the abilityy to provide for adult exercise
in the laa nnol, swimming lessons and drown - proofing in the learning pool and infant & small child recreational use in
the kiddie pool. We believe that by offering these three core uses to the community, we have addressed one of the primary.
neighborhood requirements for this project.
We thank you for the opportunity to participate in your selection process and we hope our response to the RFP will gain
your confidence in us to successfully design and construct all work at the Murray Park Community Pool,
Respectfully submit(
Di Pon peo Const on Corporation
Chris Tucker
Chief Estimator
CT /ea
ivivw.c ipomgeoconst'i- iiction.coni
2301 N. fl' 3.1" Court, Unit #102 Por)jnarto l3ctrGlr, h7oridu 3306P Telephone: ('95 -1) 917-5252 • rrox: (954) 974 -4646
W Joi
'""" LEEO AP
KIENHIER
PRICE PROPOSAL FORM BUDGET OF $1,200,000 PER ADD. #5 (E -MAIL)
Murray Park Community Pool
THIS PRICE PROPOSAL. IS SUBMITTED TO:
Maria M. Menendez
City Clerk Office
City Hall
6130 Sunset Drive
South Miami, Florida 33113
I. The undersigned PROPONENT proposes and agrees, if this Price .Proposal Is accepted, to enter Into an
agreement with the City of South Miami in the form Included in the Contract Documents to perform and
furnish all wark as specified or Indicated in the Contract Documents for the Contmct Prire.. anel wlrhin the
Contract Time indicated in this Price Proposal and in accOrdarice with the other terms and conditions of
the Contract Documents, In addition to the work specified or Indk;ated in the Contract Documents as
prepared are due by Consultant.
2. PROPONENT accepts all of the terms and conditions of the Advertisement or RFP and Instructions to
Proponents, including without limitation those dealing with the disposition of Bid (Price Proposal) Security.
This Price Proposal will recuiln subject to acceptances for ninety (90) days after the day of the Bid opening.
PROPOWNT agroc5 ter sign :rud SUI)MIt the Agreement with the Bonds and other documents required by
the RFP requirements wirhin tan (10) calendar days after the date of the City's Notice of Award.
3. In submitting this Price Proposal, PROPONENT represents, as more fully set forth in the Agreement, that;
a. PROPONENT has examined copies of all the RFP Documents and the following Addenda (receipt
of all which is hereby acknowledged,)
Addendum No, ONE — — — Dated: 8/31110�
Addendum Na, TWO Dated: 912110
Addendum No. THREE Dated, 9/$/10 s�
Addendum No. I -Ci4lR Dated: 919110
Addendum No. FIVE fE -MAIL) Dated: 10121/10
Addendum No. Dated:
b. PROPONENT has familiarized himself with the nature and extent of the contract documents,
work, site, locality, and all local conditions and laws and regulations that in any manner may affect
cost, progress, performance or furnishing of the Work.
c. PROPONENT has studied carefully all reports and drawings of subsurface conditions and
drawings of physical conditions.
d. PROPONENT has obtalned and carefully studied (or assumes responsibility for obtaining and
cat-ONIly studying) all such examinations, investigatloiis, explorations, testa and saidias (in addition
to or to stipplernent those referred to in (c) above which pertain to the subsurface or physical
coriditloos xt k1w site or otherwlse may affect the rosr, progi`ess, parfoernance, or furnishing of flit
Work at the Contract Price., within the Contract Time and in accordance with the other v:rr,75
and conditions of the Contract Documents, and no additional examinations, investigations,
explorations, costs, reports or similar information or data are, or will be required, by
PROPONENT for such purposes.
Murray Park Community Pool RFP 16
e. PROPONENT has reviewed and checked all information and data shown or indicated on the
Contract Documents with respect to existing Underground Facilities at or contiguous to the site
and assumes responsibility for the accurate location of all Underground Facilities, No additional
examinations, investigations, explorations, tests, reports or similar Information or data In respect
to said Underground Facilities are, or will be required, by PROPONENT In order to perform and
furnish the Work at the Contract Price, within the Contract Time and In accordance with the
ocher terms and conditions of the Contract Documents.
L PROPONENT has correlated the results of all such observations, examinations, Investigations,
explorations, tests, reports and studies with the terms and conditions of the Contract
Documents.
g, PROPONENT has given by 10;00 a.m., Friday, September 3, 2010 written notice of all conflicts,
errors, discrepancies that it has discovered in the Contract Documents and the written resolution
thereof by Consultant Is acceptable to PROPONENT.
h. This RFP is genuine and not made In the interest of or on behalf of any undisclosed person, firm
or corporation and is not submitted In conformity with any agreement or rules of any group,
association, organization, or corporation; PROPONENT has not direccly.or Indirectly induced or
solicited any other PROPONENT to submit a false or sham RFP; PROPONENT has not solicited
or induced any person, firm or corporation to refrain from responding to RFP; and PROPONENT
has not sought by collusion to obtain for Itself any advantage over any other PROPONENT or
over the CITY.
4. PROPONENT understands and agrees that the Contract Price Is the lump sum to furnish and install all of
the Work complete In place, A Schedule of Values must be provided with the 13 division break -down as
welt a cost breakdown of the design phase and contingency.. This information needs to be provided for the
purpose of Evaluation and when initiated by the CITY, the pricing of change orders. Contractor's price will
not be adjusted to reflect any deviation from the Schedule of Values, except to the extent that the CITY
changes the scope of tho Project after the Contract Date
As such, the Contractor shall furnish all labor, materials, equipment, tools, superintendence and services
necessary to provide a complete, In place Project for the Proposed Price oh
Design: $128,348.00 - - -_— -_-
Construccion: $867.151.00
LUMP SUM PRICE: Nine Hundred Ninety Five Thousand Four Hundred Ninety Nine Collars
dollars and & No Cents cents $995,499.00
Alternates: #1 NO ALTERNATE BIDS #5
#2 #6
#3 #7
#4 #8
5. The ENTIRE WORK shall be completed, In full, within one hundred and eighty (180) calendar days from
the date stipulated in the NOTICE TO PROCEED,
Murray Park Community Pool RFP 17
Failure to complete the entire work during the described time period shall result In the assessment.of
liquidated damages'as Indicated in Paragraph -6 of the Agreement.
6. Communisations concerning this Bid shall be addressed to;
FROPONENTr D1 Pornoeo Coaster lsn �arporatlon
Address-. 23g IsIW 3ard .Coull # #102
Eonipano Beach. ft 33069
Telephone; &1 -917 -525
Facsimile: 4- 4.4 0
Attention: John 01 Z2inp JJr._ . _.
7. The terms used In this RFF which are deflned In the General Conditions of the Conscruction 'Contract
included as part of the Contract Documents have the meanings assigned to them In the General.
Conditions,
SUBMITTED THIS Al DAY OF 2014.
BID SUBMITTED BY;
Q) Polrip oo Callon +CnrnaraEjonn,
Company
John DI Epmn -go Jr.
Title
9 §�t -B1 Z-5252
Telephone Number
95,1_974.4646
fex Numbcr
mve ccaro Cc;:rl iraonipeo c on s Eruct i ort, co m
Email Address
Murray Park Community Pool RFP 18
C
O
L
9
V
i
La
0
U
0
a�
a
E
a°
D
Design / Builder's Approach
To Sustainable Design
Di Pompeo
Consirmcdon Corporation
! IwArrilv 7rre<lir u+r •S °irrrr 192'
General (nurrurinrr.11rvfhrr tlullrlrrx • Cam "emrrlarr Rlerrrrgrn
RFP #SM- PW2010 -10 Design / Build
Murray Park Community Pool
upeo
grpot' anion
ardilion Since 1927
General Contractor • Design Builder , Construction Manage;-
Approach To Sustainable Desikn
Sustainable design is the idea of creating buildings and lrnrdscapes thai jour the highest positive regard for our
quality of life with the least consequences to our environinent. Sustainable design attempts to balance econo nlc,
social, and euvironn ►ental factors, For best results, sustainability should he clearly articulated as a guiding
principle for project development, and incorporated into the project from file earliest stages. Sustnlinable design
principles affect all phases of project development,, from design, construction, operations and maintenance, and
dentolition and disposal.
Benefits of sustainable design Include more healthy indoor environments, dollar .savings over time, and
niardmizh►g resource conservation. Sustahnability should be approached as a core value to the Design / Bander,
as it represents a unique opportunity to put theory h ►to practice through the design and uIllmate endurance of the
project. The design, construction and maintenance of buildings has a tremendous impact on people and their
neighborhoods. Willi these potential impacts in mind, sustah ►able building should altempt to meet the following
goals where opplicable. Every design project Is unique, and the sustainable rleslgn elements, technologies and
Materials crust be malched to the project's program, client goals, and budget.
As a starting point for Innovation and sustainable elements for the Murray Park Community Pool project, the
Design / Builder examines the opportunities thol present themselves throughout the varlous stages of
development and their global impact on the project. The most elemental review for fh a Murray Park Communly
Pool would begin with the design concept review: Listed below are opportunities that will be appropriate far fire
conceptual and schematic phase of the work.
Incorporatesuslainabllily into the earliest design discussions,
•
Include input from the Owner, maintenance staff, and tiny stakeholders, to can
flrm design criteria
•
Explore opporiwuilles for innovation with a collaborative, mull- disclptnary design lernn air the early stages
of design.
• Educate others to ensure that all design find construction Leant members ore ftuttlilar with sustainability
concepts and basic sustainable building practices and philosophy.
• Utilize well - established, sustainable design rating systems stitch as LEED to nneasure green performance.
• Consull our LEED professionals on our consulting teams.
• Incorporate Llfe Cycle Cost Analysis into badgel projections. Life Cycle Cost Analysis defines the projected
useful life of a project and looks at the net present value of design options as Investments. Tire goad is to
achieve the highest envdroni►neirtal performance possible at the least cost,
• Design (rash enclosures to allow for recycling bins for paper products, nnetal cans and glass.
mm. dipomp:q,?construction,com
230 / X II', JP' Court, daft 0102 • l omilmous 11cach, Florida 33069 T lephotra, (r154) 917 -5252 • I,av: (95 4) 97 4- 46-16
�fE�:�Eti LE OAR
The use of existing natural systenss to enhance the sustainable aspects of the Murray Park Community Pool is
one that has the potential to accrue long ternt savings for the residents and management of the facility while at
the same time, adding to the enjoyment of rising such a well thought -out environment.
• increase the bemef is of vegetation by marintiziug platted areas both indoors and out.
• Use ecological design principles to mimic natural systems function such as the use of Xeriscape landscaping
through floe use of ►core drought resistant species. This will also reduce the residents' dependence on
irrigation.
The Innovative approaches for conservation of energy resources for a project such as the Murray Park
Conrmrtnity Pool will be thoroughly exandned and should result In a number of positive enhancements to Ilse
project that can be enjoyed by all residents.
• Increase eff clency by rnaxinrizing equipment efflclency and using control strategies such as programmable
thermostats anl'photn on and diner off lighting
• Investigate the use of reflective coatings on the roof.
• Ensure that all applicable energy related incentives have been utllized.
• Provide residents with public transportation options,. bicycling, and walking access to basic services.
• Utilize low VOCpahtfs, adhesives and floor coverings wheneverpossible.
During the construction phase of flit Murray. Park Community Pool, there eeists an enormous opportunity to
practice sustainable methods such as those listed below with minimal impact on construction Productivity and
project Midget.
• Use materials with minimal packaging waste that is recyclable, and materials that are easily recycled.
• Utilize materials and products manufactured locally to support the local economy and mrinlsnize
transportation costs.
• Eliminate environmental contamination ►pith filtration devices for air and water systems.
Hign.lighted dements a
Sustainable Features
OL
_ a
Di Pomp o
Construction Corpora ion
,1 I' wHv 'rnrrflinrrr Shi, r I
ilererrnl C'nr�rnrt °Nrfr. iltvl�u llrrilrfwrr •CSuro-lrst•Ila�l� Alnrarr�•.n
RFP #SM- PW2010 -10 Design / Build
Murray Park Community
Di Pompeo
Construction Corporation
CGC #037741 • A Family Tradition Since 1927
General Contractor • Design Builder • Construction Manager
Highlighted Elements and Sustainable Features
The DI Pompeo Teant's design toot only meets till requirentents set forth by the City of South Mirnnl for the
Murray Park Community Pool, but exceeds expectations in areas such as aesthelics; fttttctdonality, versadilty,
sustainable features and neighborhood etthancemeul Soure of these elements that lend themselves to making this
a truly owstarrrfing design are the use of.•
POOL RELATED
• Three separate pools ore designed for multiple uses such as Imps, s►vhtt lessons and toddler trse
• Three pools share common pump and folfralion equipment for operating ecottonty
• Zero entry feature into learning and klddle pools
• Portable /re- locatable lifeguard station
• Portable handicap pool chair
• Sall chlorhoe generator
• Regenerative fllter font ►vlil save with, backwash water
• Pool heating system
• Thermal pool blanket
• Varlable frequency drive pump controller resulting In considerable electrical sovings
DESIGN RELATED
• Perimeter site fencing separates pool faclllty from street for security
• Nal►trol ventilation and fauns !to changing rooms and tollet areas
• Permeablepaversforwalkways
• Ample bicycle parking to encourage fewer automobiles
• Separate enhy /ticket bullding for greater access control
• Use of solar hot water
• Separate pool equipment and chemical storage building
• Picnic area green space odjticent to pool deck
+ Heavy landscaphtgfor shade and patron enjoyment
• Snack bar designed for food ivaruth►g
•
Pool mauager /Ifegnardoffice
• Shade structures strategically located around pool (leek area
• Pool, landscape and deck lighting far night done use
REVENUE RELATED
• Separate entry/tickef building
• Snack bar for healfhy snicks and food warttting
www.drpompeoconstruction. corn
2301 N. VY. 33" Courf, Unil #102 , Pompono Beach, Florida 33069 - Telephone: (954) 917 -5252 • Fax: (954) 974 -4646
LEEO AP
NIENIOLN
Why You Should Choose
The DI* Pompeo Team
Di 1 ompeo
Construction Cen porallon
. f d ir+t7iii P!url+'Ir'+ =rr,5r +1 r 1"l"
"fhwomf Cnurrrrrlarx -Oolp IWINrrs • cam Prurdan Alarragrrr
r r..
RFP' #SM- PW2010 -10 Design / Build
Murray Park Community Pool
0
on
927
General Contractor • Design Builder • Construction Manager
Why You Should Choose The Di Pompeo Team
• Di Pompeo Constritellon, Chlshohn, Agnadynamdcs, Belfranin, Hrrfsey _ Nlcolohles, Camero, Curtis +
Rogers, Lamnes & Garcla and Professional Service buhistrles are local companies with offices withhn
close proximity to the project site.
• Team members have Design l Bi did experience and have worked together oil other projects.
• Excellent quality and alivays honor warranty helms quickly.
• Safety frst with low experience modiflen
• Utilize subcontractors and sirperhrtendents that have built similar projects,
• Have over 17years of Design l Bulid experience (call Tamarac, Coral springs, Ft. Lauderdale; Broward
County, Plantation, Margate, Pompano Beach).
• Know what Design !Bullrl entails (paperwork, giiallty, inspections and pernrdlthig).
• For the next 12 months — Qy of South Miami and the Murray Park Comnrimity Pool will be our sole
focus, we don't overeaten d ourselves and take on more jobs and lose control.
• DI Pompeo track record of completing projects on -tine and on- budget.
• Owner's personal hivolvement, call hhn direct, not PM who needs opproval of upper mairagement, Mr.
Dl Polupeo is on top of Issues and obvilysfollows.through.
• No change orders unless initiated by the Owner or nnforeseen.
• Our ilrr oosal has everrihigg refluired in the RFP and more!
w�vw. dipp?rrpeoconstl•tiction. cots
2301 N, !V, 33 "r Court, Unit P 102 Po►r�parnn Beach, Floridan 33069 • Adeliho+re: (914) 911 -5252 • Far: (954) 974 -4646
W s r"
LEEDAP
C
O
O.
L
U
C
0
7
ti.
C
O
V
r �J
criteria . q k �t one 1'r -ic-i1 -Ind
v cry Proposal
Order of Magnitude
Cost Estimate .by Division
Di Pvm j��ev
l'
Construction Corporation
! Nsu+ilr' Irr+didan ince 141'
Cit+rr+'al Cmlfr�arfn+ar � llr.Ff�r+ flr�Ftdrrx C'arhs7�uMlnr+ Af�un�rrs
RFP #SM- PW2010 -10 Design /Build
Murray Park Community Pool
MURRAY PARK COMMUNITY POOL
CITY OF SOUTH MIAMI, FL
RFP # SM- PW2010 -10
DI POMPEO CONSTRUCTION CORPORATION
DESCRIPTION
DIVISION #1
$110,509
DIVISION #2
$48,487
DIVISION #3
$161,791
DIVISION #4-
$8,500
DIVISION 0
$2,050
DIVISION #6
$5,200
DIVISION ##7
$1,102
DIVISION 48
$4,090
DIVISION 49
$8,677
DIVISION #10
$3,410
DIVISION 911
$6,200
DIVISION 01.2
$58,635
DIVISION #13
$382,500
DIVISION #14
NOT USED
DIVISION ##I5
$25,500
DIVISION #10
$35,500
Mal _
TOTAL
$862,151
_
PERMIT FEES, REIMBURSABLE
$5,000
CONSTRUCTION PHASE TOTAL $867,151 1
DESIGN PHASE TOTAL
Pf2fi.II X"'r G ibkNI) Ti)'i A
RFP #SM- PW2010 -10 Murray Park Community Pool
$128,348
$905,409
C
0
0
U
C
0
JLJ
IA
C
0
U
8
CL
E
0
CL
C I I ,ii i J'rOP()JJeJt 'S I "I' 1 i I Iris:
Defivux PI-QVO,$0
Opp"
Concept Project Design and
Park Improvements
f 64 ray Park Cornum I lif)lt .,J 0 1
DI* Pompeo
Construction Corporation
f7i'lW&I CAMIFMCM14 - MMISIF fiAdIff"M • ('610OWdIft AlIFFUrgen
RFP #SM-PW201 0-10 Design / Build
Murray Park Community Pool
2 -AJW
. ` . � ��\ ® �, \ �
�� /�� \,
w
two
LLJ
U)
z
0
.F
Z)
F-
E
0
co
E
M
2
4;
CO :3
0
0
>1
u
4
Z
O
Q
W
J
W
0
U3
6
0
CL
E
E
0
C)
Y
l4
d
A
7
E
l0'
L
7
O
w
O
U
011
Z
0
LU
cn
LU
-a
0
a-
E
0
CL
E
M
0
co
A
7
i
i
7W
,U
� W
Q
� W
Cw
O
i
i
3
I
4 l
I ?�
Z
O
�1111
W
LI
f
ry
O
Z
Q
0
d
T
;E
7
E
E
O
U
ro
a
T
ro
ro
s
0
CO
0
T
U
t6)
13-
E
E
0
IC
LL
E
CC_m
O
LLI
L
Y
11C)
ILI
Cl
cn
!L!
n
W
U)
a
'E
z
F-
E
0
U
Y
m
d
m
L
7
O
O
a
U
t
C
a
a
wyy
1
U
W
CL
[r
w
n
w
z
a
C
E
E
O
m
!0
a
m
t
E
M
t
U
41
2.1 11
110.1
-6
0
CL
211
c
9-
E;
0
0
CL
E
A2
2
0
co
A
t 3 '1
s
� p
O
O
a
Z,
�C
7
E
O
U
c�
CL
T
(0
O
�E
m
L
7
O
U)
46
O
A I
Mn
E
0
-Le
E
0
LO
0
>1
0
4,
A r
O
R
CL
c
3
E
E
0
U
Y
`ro
CL
R
t
E
m
2
t
f
3
cn
46
U