RESOLUTION NO. 130-13-13948
A Resolution authorizing the City Manager to negotiate hourly rates and to
execute a professional service agreement as provided under the Florida
Statute 287.055 (Consultant's Competitive Negotiation Act) "CCNA ", for
professional services for the South Miami Intermodal Transportation Plan
(SMITP).
WHEREAS, the Mayor and City Commission desire to engage a firm that can provide
a complete scope of services with positive, dependable and accurate results to the end users; and
WHEREAS, on April 12, 2013 a request for qualification RFQ #PW- S2013 -10 was
released by the City for these studies; and
WHEREAS, the City received solicitation from six (6) firms; and
WHEREAS, pursuant to Florida Statute 287.055 (Consultant's Competitive
Negotiation Act) "CCNA ", the City review committee conducted thorough review of the firms
qualifications, and overall evaluation and the firms were ranked in accordance to their
qualifications as follows with the highest rank at the top of the list:
1. Kimley -Horn & Associates
2. The Corradino Group
3. Street Plans
Calvin Giordano & Associates
MC Harry & Associates
4. Marlin Engineering
WHEREAS,
the
Mayor and City Commission desires
to authorize the City Manager to
negotiate hourly rates
and
execute a service agreement with the
highest ranked firm.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA:
Section 1. The City Manager is hereby authorized to negotiate hourly rates and execute a
professional service agreement in the same form as published in RFQ #PW- S2013 -10 in
accordance with the procedure set forth in Florida Statute 287.055 (Consultant's Competitive
Negotiation Act),
Section 2: The final agreement shall be approved by resolution prior to being signed by
the City Manager.
Section 3: If any section clause, sentence, or phrase of this resolution is for any reason
held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect
the validity of the remaining portions of this resolution.
page 1
A¢ hh h cl.
Res. No. 130 -13 -13948
Section 2. This resolution shall be effective immediately upon being approved.
PASSED AND ADOPTED this 18th day of June , 20131
READ AND ROVED AS TO FORM,
LANGUA EGALI D
E ION THERVOTY )
An
MAYOR
COMMISSION VOTE:
Mayor Stoddard:
Vice Mayor Liebman:
Commissioner Newman:
Commissioner Harris:
Commissioner Welsh:
mf
Yea
Yea
Yea
Yea
Yea
page 2
TO:
City
PUBLIC WORKS &
4795
Mi
Tel. (305) 663
W,
of South Miami
ENGINEERING DEPARTMENT
SW 751h Avenue
ami, FL 33155
-6350 Fax (305) 668 -7208
Steven Alexander, City Manager
FROM: Jorge L. Vera, Capital Improvement Project Manager
DATE: May 21, 2012
br.
Q?
South Miami
Att- AtiietfraClp
Resolution: A Resolution authorizing the City Manager to negotiate hourly rates and to
execute a service agreement as provided under the Florida Statute 287.055
(Consultant's Competitive Negotiation Act) "CCNA ', for professional
services for the South Miami Intermodal Transportation Plan (SMITP).
Background: On April 12, 2013, the City received 6 solicitations in response for the request for
qualifications RFQ #PW- S2013 -10 for South Miami Intermodal Transportation Plan. A
selection committee met to review and rank the firms in accordance with Florida Statute
287.055 (CCNA).
The intent of the CCNA is -to select professional services based on the qualifications of the
firm, without considering the price of those services until after the firms have been ranked.
Ranking is based on qualifications and negotiations have begun with the top ranked firm.
Professional design services are defined under this law to include engineering, surveying &
mapping, landscape architecture, and architecture. Numerous studies have shown that
selection based on qualifications provides the owner with optimum services, whereas selection
based on low price only assures the owner of the least expensive initial design or study cost,
not necessarily the best or most cost - effective over the life of the project. Public agencies that
use qualifications based selection under the CCNA to procure engineering services are
better able to control construction costs and achieve a consistently high degree of project
satisfaction than those using other procurement methods. Therefore, the selection of firms
wile be based._on_ qualifications. and ,;once-firms--are-selected _'the.n cam ,etitiveme otiations--;
for fees will occur.
Further, the intent of the CCNA legislation has always been to preclude "price consideration"
from entering into the selection process. The Florida Legislature clarified the statute in 1988 to
state that an "agency may request, accept, and consider proposals for the compensation to be
paid under the contract only during the competitive negotiation.'
The execution of these Professional General Service agreements does not commit the City
to any maximum amount of fees nor guarantees any work. Upon selection of the firms, the
City will negotiate hourly rates that are acceptable to the City and within industry standards.
Upon the City and firm negotiating a cost to perform the required scope for the South Miami
Intermodal Transportation Plan, a resolution will be brought before the City Commission for
approval the service agreement.
Attachments: Proposed Resolution
Evaluation selection sheets
A.
Evaluation Selection Committee Results
RFQ: South Miami Intermodal Transportation Plan